• Title/Summary/Keyword: Stream sediment

Search Result 399, Processing Time 0.024 seconds

Evaluation of SWAT Applicability to Simulate Soil Erosion at Highland Agricultural Lands (고랭지 농경지의 토양유실모의를 위한 SWAT 모형의 적용성 평가)

  • Heo, Sung-Gu;Kim, Ki-Sung;Sa, Gong-Myong;Ahn, Jce-Hun;Lim, Kyoung-Jae
    • Journal of Korean Society of Rural Planning
    • /
    • v.11 no.4 s.29
    • /
    • pp.67-74
    • /
    • 2005
  • The Doam watershed is located at alpine areas and the annual average precipitation, including snow accumulation, is significant higher than other areas. Thus, pollutant laden runoff and sediment discharge from the alpine agricultural fields are causing water quality degradation at the Doam watershed. To estimate soil erosion from the agricultural fields, the Universal Soil Loss Equation (USLE) has been widely used because of its simplicity to use. In the early spring at the Doam watershed, the stream flow increases because of snow melt, which results in erosion of loosened soil experiencing freezing and thaw during the winter. Also, extremely torrential rainfall, such as the typhoons 'RUSA' in 2002 and 'MAEMI' in 2003, caused significant amounts of soil erosion and sediment at the Doam watershed. However, the USLE model cannot simulate impacts on soil erosion of freezing and thaw of the soil. It cannot estimate sediment yield from a single torrential rainfall event. Also, it cannot simulate temporal changes in USLE input parameters. Thus, the Soil and Water Assessment Tool (SWAT) model was investigated for its applicability to estimate soil erosion at the Doam watershed, instead of the widely used USLE model. The SWAT hydrology and erosion/sediment components were validated after calibration of the hydrologic component. The R$^2$ and Nash-Sutcliffe coefficient values are higher enough, thus it is found the SWAT model can be efficiently used to simulate hydrology and sediment yield at the Doam watershed. The effects of snow melt on SWAT estimated stream flow and sediment were investigated using long-term precipitation and temperature data at the Doam watershed. It was found significant amount of flow and sediment in the spring are contributed by melting snow accumulated during the winter. Two typhoons in 2002 and 2003, MAEMI and RUSA, caused 33% and 22% of total sediment yields at the Doam watershed, respectively. Thus, it is recommended that the SWAT model, capable of simulating snow melt, sediment yield from a single storm event, and long-term weather data, needs to be used in estimating soil erosion at alpine agricultural areas to develop successful soil erosion management instead of the USLE.

LONG-TERM RESERVOIR SEDIMENT MANAGEMENT CONSIDERING OTHER OPERATIONAL OBJECTIVES

  • Ko, Seok-Ku;Kim, Woo-Gu;Lee, Gwang-Man
    • Water for future
    • /
    • v.35 no.5
    • /
    • pp.43-50
    • /
    • 2002
  • The Yellow River Basin located in the Northern part of China is well-known not only as the seriously limited water sources but the greatest sediment-carrying stream in the world. The observed annual average sediment concentration in this area is $37.6kg/\textrm{mm}^3$, and 3.1% of the water volume is occupied by sediments. Due to the reason, water development has been extremely limited and it has been appeared as one of the most difficult problems in reservoir development and management. The major obstacle to surface water uses is reservoir sedimentation so that it has been strongly requested to seek the method managing sediment by optimal fashion. To solve this problem, KOWACO (Korea Water Resources Corporation) has developed various methods on the optimal reservoir management schemes including sediment management for the Upper Fenhe Basin Reservoir System at the cooperation project with Chinese. Information Variable Dynamic Programming. which is one of them, was developed for the reservoir sediment management and a set of non-dominated solutions are generated to choose the best alternative in water supply and reservoir sediment objective problem.

  • PDF

Transport Paths of Nearshore Surface Sediment on Coast of East Sea, Korea (동해 연안 표층퇴적물의 이동경로)

  • 유규철;오재경
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.11 no.1
    • /
    • pp.50-55
    • /
    • 1999
  • Gao and Collins method (two-dimensional sediment transport trend-vector model) using grain-size parameters (mean grain size, sorting coefficient, and skewness) calculated by the statistical moment method is introduced to understand semi-quantitatively the sandy and surficial sediment transport trends on a coast of the East Sea. The result is the sediment transport vectors which indicate transport paths of surficial sediment by wave-induced currents. The corresponding morphological feature is a spit developed at the mouth of the Nam¬dae stream, which is a resultant sediment transported by longshore current and is blocking the circulation of ocean. After this, it is thought that seasonal research and hydrodynamic measurements are needed for verification of the results.

  • PDF

Time-series Changes in Particle Size Characteristics of Suspended Sediment at the Seungchon and the Juksan Weir in the Yeongsan River (영산강 부유하중의 시계열적 입도 특성 변화: 승촌보, 죽산보를 중심으로)

  • Lim, Young Shin;Kim, Jin Kwan
    • Journal of The Geomorphological Association of Korea
    • /
    • v.26 no.4
    • /
    • pp.1-20
    • /
    • 2019
  • In order to establish appropriate policy to control sediment-associated problems, it is necessary to identify the physical characteristics of the reservoir sediments in particulate form in the Yeongsan River. Two time-integrated suspended sediment samplers were installed at Seungchon and Juksan weir on the upper and middle Yeongsan River in July 2012. Reservoir sediment samples were obtained at monthly intervals until October 2014. During the monitoring period, a total of 38 sediment samples were obtained and analyzed. Seasonal trends of suspended sedimentation rates and grain size distributions were examined based on variations in precipitation and discharge fluctuations. Moreover, stream flow characteristics, which has a great influence on the physical characteristics of the river sediment, was analyzed using flow duration curve for the period 2003-2019 at Naju gauging station. Sedimentation rates during summer, when heavy rainfall was concentrated due to the monsoonal front and typhoon, were very high, indicating the positive relationship between sediment concentration and discharge. Particle size analysis of the collected sediment showed that coarse silt and very fine sand-sized sediment dominated most of the Seungchon weir sediment. On the other hand, medium silt-sized sediment dominated the downstream Juksan weir except for a few summer samples. These results implied that the physical characteristics of the suspended sediment are determined not only due to flow fluctuations, but also with regard to the antecedent rainfall conditions, hillslope-channel connectivity, and the supply of materials from various contributing regions. This information about flow characteristics and temporal variations in reservoir sediment can be used for safe management of the weir and discussing the issues on the dismantling of the weirs.

Evaluation of Watershed Stability by the Forest Environmental and Stream Morphological Factors (산림환경 및 하천형태인자에 의한 유역안정성 평가)

  • Jung, Won-Ok;Ma, Ho-Seop
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.4 no.4
    • /
    • pp.1-11
    • /
    • 2001
  • This study was carried out to analyze the characteristics of forest environmental and stream morphological factors by using the quantification theory(I) for evaluation of the watershed stability. Present annual mean sediment yield of erosion control dams were investigated in 167 sites of erosion control dam constructed during 1986 to 1999 in Gyeongbuk. The results obtained from this study were summarized as follows; According to the coefficients of partial correlation, each factor affecting to sediment was shown in order of gravel contents, number of first streams order, number of total streams, length of total streams, forest type, length of main stream, parent rock, stand age, soil texture, stream order, slope gradient, soil depth and aspect. Descriptions of class I were as follow; Igneous rock of parent rock, hardwood stands of forest type, less than 20 year of stand age, less than 30cm of soil depth, sandy clay loam of soil texture, more than 41% of gravel contents, south~east of aspect, 2,501~3,500m of length of main stream, 21~25 of number of total streams, 5,501~10,000m of length of total streams, 3 or more than 4 of stream order, more than 16 of number of first stream orders and more than $31^{\circ}$ of slope gradient. Descriptions of class II were as follow; Metamorphic rock of parent rock, coniferous stands of forest type, more than 25 year of stand age, 31~40cm of soil depth, silt loam of soil texture, 11~20% of gravel contents, north~west of aspect, 2,501~3,500m of length of main stream, 16~20 of number of total streams, 3,501~5,500m of length of total streams, 3 of stream order, 11~15 of number of first stream orders and more than $31^{\circ}$ of slope gradient. Descriptions of class III were as follow; Sedimentary rock of parent rock, mixed stands of forest type, more than 25 year of stand age, more than 51cm of soil depth, silty clay loam of soil texture, less than 10% of gravel contents, south~west of aspect, less than 500m of length of main stream, less than 5 of number of total streams, less than 1,000m of length of total streams, less than 1 of stream order, less than 2 of number of first stream orders and less than $25^{\circ}$ of slope gradient. The prediction method of suitable site for erosion control dam divided into class I, II, and III for the convenience of use. The score of class I evaluated as a very unstable area was more than 8.4494. A score of class II was 8.4493 to 6.0452, it was evaluated as a moderate stable area, and class III was less than 6.0541, it was evaluated as a very stable area.

  • PDF

A research on the features of suspended sediments origination in natural world (자연계에 있어 부유사 발생원의 특성에 관한 연구)

  • 이성기
    • Journal of Environmental Science International
    • /
    • v.11 no.6
    • /
    • pp.483-488
    • /
    • 2002
  • Suspended sediment outflows mainly by natural situation and artificial action and affects in down-stream. This research studied suspended sediments origination in forests size and mountain stream for natural situation, density for artificial action, and measured the size and possible quantity of suspended sediments origination and studied obstruction method of the generation by artificial action. As the result, I found that the size of generation is about 2~3% of forest size and the forest size which is affecting bare area of valley is about 1∼2ha. In addition, possible outflow segments quantity by artificial facilities is assumed to be maximum 200ton/ha and abstract of mountain incline for mountain development needs minimize bare area valley by make right angle with minimum size.

Prediction of Cohesive Sediment Transport and Flow Resistance Around Artificial Structures of the Beolgyo Stream Estuary

  • Cho, Young-Jun;Hwang, Sung-Su;Park, Il-Heum;Choi, Yo-Han;Lee, Sang-Ho;Lee, Yeon-Gyu;Kim, Jong-Gyu;Shin, Hyun-Chool
    • Fisheries and Aquatic Sciences
    • /
    • v.13 no.2
    • /
    • pp.167-181
    • /
    • 2010
  • To predict changes in the marine environment of the Beolgyo Stream Estuary in Jeonnam Province, South Korea, where cohesive tidal flats cover a broad area and a large bridge is under construction, this study conducted numerical simulations involving tidal flow and cohesive sediment transport. A wetting and drying (WAD) technique for tidal flats from the Princeton Ocean Model (POM) was applied to a large-scale-grid hydrodynamic module capable of evaluating the flow resistance of structures. Derivation of the eddy viscosity coefficient for wakes created by structures was accomplished through the explicit use of shear velocity and Chezy's average velocity. Furthermore, various field observations, including of tide, tidal flow, suspended sediment concentrations, bottom sediments, and water depth, were performed to verify the model and obtain input data for it. In particular, geologic parameters related to the evaluation of settling velocity and critical shear stresses for erosion and deposition were observed, and numerical tests for the representation of suspended sediment concentrations were performed to determine proper values for the empirical coefficients in the sediment transport module. According to the simulation results, the velocity variation was particularly prominent around the piers in the tidal channel. Erosion occurred mainly along the tidal channels near the piers, where bridge structures reduced the flow cross section, creating strong flow. In contrast, in the rear area of the structure, where the flow was relatively weak due to the formation of eddies, deposition and moderated erosion were predicted. In estuaries and coastal waters, changes in the flow environment caused by artificial structures can produce changes in the sedimentary environment, which in turn can affect the local marine ecosystem. The numerical model proposed in this study will enable systematic prediction of changes to flow and sedimentary environments caused by the construction of artificial structures.

The Concentration Distribution and Source Identification of Polychlorinated Biphenyls in River Sediment (하천 퇴적물 중 PCBs 농도분포 및 발생원 해석)

  • Jin, Ronghu;Oh, Jung-Keun;Kim, Jong-Guk;Kim, Kyoung-Soo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.11
    • /
    • pp.995-1000
    • /
    • 2010
  • To investigate the relationship between polychlorinated byphenyls (PCBs) sources and concentration level in sediment, total 63 sediment samples with three-time sampling at one site were measured at 21 sites in Nakdong River. As a result of analysis, total concentrations and toxic equivalent (TEQ) concentration of Dioxin-like PCBs were ranged from 3.0 to 6,600 pg/g-dry with a mean value of 440 pg/g-dry and

Analysis of Dalcheon River Bed Change using GSTARS Model (GSTARS 모형을 이용한 달천의 하상변동 해석)

  • Lee, Jong-Hyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.6
    • /
    • pp.1264-1270
    • /
    • 2006
  • In this study, semi-two dimension numerical model(GSTARS 2.1 model) were applied to study on the hydraulic and sedimentologic characteristics of downstream channel section in Dal stream. GSTARS 2.1 model was applied for the four selected sediment transport formulas(Meyer-Peter and Muller, Acker and White's, Engelund and Hanson, Yang formula) from 1984 to 1992 measured data on each section. The simulation results of Meyer-Peter and Muller formula for long-term bed changes are good when compared to the measured data. When quantitatively compared, it appears that the results data is relatively underestimated compared to the 1992 measured data on each section. Using Meyer-Peter and Muller formula, analyse the effects of bed changes by stream tube number.

  • PDF

A study on the sediment yields and raising of the spillway crest for the reservoir capacity enlargement (저수지 유역의 토사 유입 및 여수토 숭상 효과 조사)

  • Nam, Myoung-Hee;Suh, Seung-Duk
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.324-329
    • /
    • 2001
  • Sediment yields from the reservoir watershed areas and raising of the spillway crest for the agricultural reservoir capacity enlargement were investigated and analysed through the 21 pilot reservoirs, have irrigated areas 200has. and over in the Kyoungpook province. In these studies, (1), the correlation analysis between various watershed characteristics and annual specific sediment yields were derived and (2), the excess effective reservoir capacity of the over 0.5m above the spillway crest could be estimated. In brief, catchment area should strongly be correlated with the annual specific sediment yields (R=0.90), the other side, average slope of the main stream is less than catchment area. The excess effective capacity of reservoir enlargement by the raising of spillway crest at 0.5m-height was resulted 12.1% of increasing capacity compare with the original reservoir capacity.

  • PDF