A Economic Order Quantity(EOQ) Determination Method considering Stock Yard Size (야적장 크기를 고려한 철근의 경제적 주문량(EOQ) 산정)

  • Lee, Jae-Myung;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.549-552
    • /
    • 2007
  • Inventory management is an important factor for cost saving in a construction project. stock yard of general public residence site is secured. but site of the downtown area is not. inventory management of site was performed an intuition and an experience. According to inventory management of site is necessary systematic and efficient. This study examine general idea stock and inventory management. and suggests a EOQ determination method considering stock yard size. and particularity of site.

  • PDF

A Ship Scheduling Model for Raw Material Transportation with Yard Storage Constraints in a Steel Mill (재고수준을 고려한 제철원료 수송을 위한 선박 일정계획 수립 모형)

  • Seong, Deok-Hyun;Suh, Min-Soo;Kim, Sang-Won;Kim, Woo-Jin
    • Journal of Information Technology Services
    • /
    • v.10 no.3
    • /
    • pp.49-59
    • /
    • 2011
  • A ship scheduling model is presented for the raw material transportation problem with yard storage constraints in a steel mill. The problem is formulated as 0, 1 mixed integer programming considering such constraints as loading port conditions, ship size and hold capacity, unloading conditions, and yard storage space. In addition, inventory related constraints including safety stock are taken into consideration to support the continuous operations of steel making process. The proposed model has been implemented and applied successfully to a real world problem, and its results show the improvement of performance compared to the traditional method. For example, the arrival dates of ships are determined satisfying the constraints. The total inventory level is minimized at the stock yard as a result. Also, the safety inventory level is always kept at the planning stage, and the standard deviation of total inventory level is reduced significantly. Further research is expected to develop efficient heuristics to have a better response time for even larger scale problems.

A Development of an Integrated Inventory Managing System for Steel-Plates (강재 통합 관리 시스템 개발)

  • Lee, Seok Hyun;Yu, Ji Hun;Kim, Hyun Chul;Jang, Seok Min;Lim, Rae Soo;Kim, Ho Kyeong;Heo, Joo Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.2
    • /
    • pp.130-137
    • /
    • 2014
  • As one of the largest shipbuilding company in the world, STX Offshore & Shipbuilding currently developed an inventory managing system for steel-plates, which is applied to their steel stock yard. In a traditional way to manage steel yard, almost every work has been done by manually. The manual steel-plate piling process caused some problems such as process delay due to piling errors and the uncertainty of work plan due to lack of information. To solve these problems, we developed an integrated inventory managing system based on real-time crane tracking system which automatically updates steel-plates' piling status. We built the integrated steel-plate database, developed several programs including steel-plate input program, real-time steel-plate monitoring program and steel-yard management program, and constructed hardware system for tracking magnetic cranes. As a result, a supervisor of steel-yard can manage the inventory of steel-plates efficiently and furthermore plan an efficient piling schedule and crane working schedule.

Simulation of Block Logistics at a Big Shipyard (대형 조선소의 블록 물류 시뮬레이션)

  • Song, Chang-Sub;Kang, Yong-Woo
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.6
    • /
    • pp.374-381
    • /
    • 2009
  • To meet the soaring demand recently, South Korea big shipbuilders are examining two things. One is new investment in plant and equipment. The other is replacement of production resources. Considering plant & equipment investment and replacement of production resources, even if actual production ability would be enough, the real output could be affected by limitation of logistics with lack of analysis. As we set up big shipyard in virtual space, we could perform actual production by using confirm production plan in virtual space. We've analyzed the load of block stock, load of road and load of transporter for logistics effects are followed by production increase. This research is to determine the possible problems of those analyzed results and to present the resolution using the current layout. And then modified yard layout, we reanalyzed previous three logistics effects. This simulation model could help administrator to make rational decision for changing yard layout.

Enhanced Productivity By Development Of Isometric Pre-Erection (입체 PE 개발을 통한 생산성 향상)

  • Lee Jongseob;Kim Younghwan;Joe Jongrae
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2005.06a
    • /
    • pp.185-191
    • /
    • 2005
  • Korean naval architecture company today is making researches in expansion of productivity of their own accord. In result, they have accomplished many technical developments like a ground shipbuilding system. For our company's productivity expansion in our yard's limited condition (the facility, P.E area, stock area), we develop isometric pre-erection method that turn into a possibility to maximize our facility use, minimize our dock period.

  • PDF

A Study on Improved Safety and Efficiency of Shunting In View of Principles of Train Operation Safety (안전 및 효율성 제고를 위한 입환방식에 열차운전원칙 적용에 관한 연구)

  • Jeon, Young Seok
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.2
    • /
    • pp.79-84
    • /
    • 2013
  • The definition and classification of shunting, which involves the process of sorting rolling stock into complete train sets inside station yard, are not clearly specified in Korean domestic safety regulations for railway operations. As a result, collisions during shunting occur rather frequently compared with other types of accidents in railway operations. Therefore, new systematic safety principles are proposed in this paper to improve operation safety during shunting. The improvements in safety and efficiency derived from the newly proposed approach are analyzed and verified in field application.

Minimization of the Rearrangement of a Block Stockyard Based on the Genetic Algorithm (유전 알고리즘을 기반으로 한 조선소 블록 적치장의 재배치 최소화)

  • Roh, Myung-Il;Im, Byeong-Seog
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.3
    • /
    • pp.207-215
    • /
    • 2011
  • Due to its large size, a ship is first divided into scores of blocks and then each block is constructed through various shops, such as the assembly shop, the painting shop, and the outfitting shop. However, each block may not be directly moved to the next shop and may be temporarily laid on a block stockyard because the working time in each shop is different. If blocks are laid on the block stockyard without any planning, the rearrangement of the blocks by a transporter are required because the blocks have the different in and out time. In this study, an optimal layout method based on the genetic algorithm was proposed in order to minimize the rearrangement of the blocks in the block stockyard. To evaluate the applicability of the proposed method, it was applied to a simple layout problem of the block stockyard.

Block layout method in the block stockyard based on the genetic algorithm

  • Roh, Myung-Il
    • Ocean Systems Engineering
    • /
    • v.2 no.4
    • /
    • pp.271-287
    • /
    • 2012
  • Due to its large size, a ship is first divided into scores of blocks and then each block is constructed through various shops, such as the assembly shop, the painting shop, and the outfitting shop. However, each block may not be directly moved to the next shop and may be temporarily laid at a block stockyard because the working time in each shop is different from each other. If blocks are laid at the block stockyard without any planning, the rearrangement of the blocks by a transporter is required because the blocks have the different in and out time. In this study, a block layout method based on the genetic algorithm was proposed in order to minimize the rearrangement of the blocks in the block stockyard. To evaluate the applicability of the proposed method, it was applied to simple layout problems of the block stockyard. The result shows that the proposed method can yield a block layout that minimizes the total relocation cost of moving obstacle blocks in the block stockyard.

A Study on the Distance Between the Track Circuits Using Identical Frequency in Railway Track Circuit System (철도궤도회로시스템에서 동일한 주파수를 사용하는 궤도회로 사이의 이격거리에 대한 연구)

  • Kim, Min-Seok;Lee, Jong-Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.11
    • /
    • pp.2168-2174
    • /
    • 2009
  • Electrical railway system consists of rolling stock, track, signal and streetcar line system. Track circuit system is a vital system due to checking the location of trains. Track circuits are divided by using frequency and isolated electrically. Currently, there is not a regulation for the distance between track circuits using identical frequency. In case of installing additional track circuits in large stations or marshalling yard, the problem which is that the signal is not exactly transmitted to the track circuit occurs due to the mutual interference. In other words, the track circuit properly is not operated on account of wrong induction current by the mutual inductance between track circuits. In this paper, we suggest the electrical model between track circuits and numerically calculate demanded parameters in electrical model. The distance between track circuits satisfying the mutual inductance which does not happen to the mutual interference phenomenon is presented about the distance of track circuit. It is proved by using Matlab and PSpice program as the amplitude of mutual induced current.

On-site Inventory Management Plan for Construction Materials Considering Activity Float Time and Size of a Stock Yard (공정별 여유시간과 야적장 규모를 고려한 건설자재의 현장 재고관리 방안 연구)

  • Kim, Yong Hwan;Yoon, Hyeong Seok;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.79-89
    • /
    • 2023
  • The inventory of many materials requires a large storage space, and the longer the storage period, the higher the potential maintenance cost. When materials are stored on a construction site, there are also concerns about safety due to the reduction of room for movement and working. On the other hand, construction sites that do not store materials have insufficient inventory, making it difficult to respond to demands such as sudden design changes. Ordering materials is then subject to delays and extra costs. Although securing an appropriate amount of inventory is important, in many cases, material management on a construction site depends on the experience of the site manager, so a reasonable material inventory management plan that reflects the construction conditions of a site is required. This study proposes an economical material management method by reflecting variables such as the status of the preceding and following activities, site size, material delivery cost, timing of an order, and quantity of orders. To this end, we set the appropriate inventory amount while adjusting related activities in the activity network, using float time for each activity, the size of the yard, and the order quantity as the main variables, and applied a genetic algorithm to this process to suggest the optimal order timing and order quantity. The material delivery cost derived from the results is set as a fitness index and the efficiency of inventory management was verified through a case application.