• 제목/요약/키워드: Steel-frame work

검색결과 92건 처리시간 0.023초

실 구조물 진동제어를 위한 점탄성 댐퍼 설계 및 적용 실험 (Designs and Tests for the Vibration Control of Full-Scale Steel Frame Structure with Added Viscoelastic Dampers)

  • 정정교;김두훈;김영찬;박진일
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2002년도 추계학술대회논문집
    • /
    • pp.687-692
    • /
    • 2002
  • In order to verify the effectiveness of adding visooelastic dampers to full-scale steel frame structure on the reduction of their seismic and wind response a experimental work was carried out. First, The test was conducted on the VE dampers subjected to sinusoidal excitations under a variety of ambient temperatures, frequency, and the damper strain. Results from these tests showed that the viscoelastic dampers have high energy dissipation capacity. Second, The vibration tests was conducted of the full-scale steel frame structure with md without added VE dampers at different temperatures. Viscoelastically damped full-scale structure test result on the effect of ambient temperature show that viscoelastic dampers are very effective in reducing excessive vibration of the structure due to sinusoidal excitation over a wide ringe of ambient temperature.

  • PDF

3D finite element modelling of composite connection of RCS frame subjected to cyclic loading

  • Asl, Mohammad Hossein Habashizadeh;Chenaglou, Mohammad Reza;Abedi, Karim;Afshin, Hassan
    • Steel and Composite Structures
    • /
    • 제15권3호
    • /
    • pp.281-298
    • /
    • 2013
  • Composite special moment frame is one of the systems that are utilized in areas with low to high seismicity to deal with earthquake forces. Composite moment frames are composed of reinforced concrete columns (RC) and steel beams (S); therefore, the connection region is a combination of steel and concrete materials. In current study, a three dimensional finite element model of composite connections is developed. These connections are used in special composite moment frame, between reinforced concrete columns and steel beams (RCS). Finite element model is discussed as a most reliable and low cost method versus experimental procedures. Based on a tested connection model by Cheng and Chen (2005), the finite element model has been developed under cyclic loading and is verified with experimental results. A good agreement between finite element model and experimental results was observed. The connection configuration contains Face Bearing Plates (FBPs), Steel Band Plates (SBPs) enveloping around the RC column just above and below the steel beam. Longitudinal column bars pass through the connection with square ties around them. The finite element model represented a stable response up to the first cycles equal to 4.0% drift, with moderately pinched hysteresis loops and then showed a significant buckling in upper flange of beam, as the in test model.

철골용 클램프 시공방향에 따른 변형 및 성능확인 (Steel Frame Clamp Deformation and Performance Check based on Clamping Orientation)

  • 모승언;임남기
    • 한국건축시공학회지
    • /
    • 제22권2호
    • /
    • pp.161-169
    • /
    • 2022
  • 정부[3]에서는 강관비계를 재래식 비계로 규정하고 일체형 작업발판인 시스템비계를 우선 설치하도록 제도화 하고 강관비계의 사용을 최대한 지양하고 있는 추세이다. 하지만 발전소, 플랜트 현장 등 장비의 진입이 안 되거나 본 구조물의 구조가 복잡한 곳, 그리고 지면에서 비계를 쌓아 올리지 못하는 곳에서는 강관비계를 설치하여 작업할 수 밖에 없다. 고소부위의 H-beam 구조물에 강관비계를 설치하여 작업자들이 안전하게 작업을 할 수 있도록 작업공간을 형성하기 위해서는 철골용 클램프의 성능은 매우 중요한 요소이다. 본 연구에서는 철골용 클램프의 설치 방향별 부재의 변형 및 인장하중에 대해 성능시험 및 구조해석 모델링을 통해 확인한 결과 설치 방향별 성능은 안전인증 기준인 인장하중 10,000N을 만족하는 것으로 확인 되었다. 다만 성능값은 만족하지만 부착부 누름 볼트의 변형발생이 확인되었고, 부착부 본체는 변형이 미미한 것으로 확인되었으므로 철골용 클램프는 하중이 전달되는 방향으로 설치하여 부착부 본체에 하중이 제대로 전달될 수 있도록 하는 것이 보다 안전한 방법이다.

자동차용 강판 SAPH의 고출력 파이버 레이저에 의한 T형상 용접특성에 관한 연구 (A Study on T-Joint Welding by High Power Fiber Laser of SAPH Steel Plate for Automobile)

  • 오용석;유영태;신호준
    • 한국자동차공학회논문집
    • /
    • 제17권3호
    • /
    • pp.35-44
    • /
    • 2009
  • The purpose of this paper is to describe experimental results about the T-joint welding of the high power continuous wave (CW) fiber laser for SAPH steel plate for seat frame of car. The seat rail is a part of seat frame of cars. The assembling method is mostly fix up using a bolt and nut. But this assembling method has many demerits in productivity such as increasing work process and material cost. This paper presents an experimental study about Laser T-Joint weldability of seat rail. Laser welding has many advantages in lightness and saving material costs of seat frame. The laser beam was moved along the work pieces by six axis robot with process optical fiber. The laser beam is focused with a welding head within incident angle $15{\sim}45^{\circ}$ for the purpose of the T-joint welding through two side full penetration. The range of the root gap size is less than ${\leq}0.4mm$. Optical microscopy SEM were performed to observe the micro structures and determine the structures of welded zone.

철골공사 현장조사를 통한 설계프로세스 개선방안 (The Improvement Plan of Design Process by Case Study of Steel Structural Work)

  • 방성원;오승준;김진호;임남기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.121-126
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying tine and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

  • PDF

현장조사를 통한 철골공사 설계프로세스 개선방안 (The Improvement Plan of Design Process by Case Study of Steel Structural Work)

  • 방성원;김진호;임남기
    • 한국건축시공학회지
    • /
    • 제3권2호
    • /
    • pp.111-118
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

철골공사의 노동생산지수 개발 (Development of Labor Productivity Index for Steel Construction)

  • 강병렬;김기성;엄익준;구교진
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.353-357
    • /
    • 2004
  • 현재 우리나라의 철골공사에서 생산성은 철골부재의 중량으로 되어있다. 그러나 철골공사의 생산성은 부재의 중량보다는 피스 수에 더 많은 영향을 받는다. 이에 따라 새로운 철골공사의 생산지수가 필요하다. 본 연구에서는 우리나라 철골공사의 문제점을 분석하고 문제점을 개선할 수 있는 새로운 생산지수를 개발하고자 한다. 이를 통해 전 과정을 통일된 수치화하고 이 수치를 관리함에 따라 복잡한 관리를 보다 효과적으로 통합관리 할 수 있도록 한다.

  • PDF

Green Frame 접합방식 기초연구 (A Basic Research for Connection Type of Green Frame)

  • 김근호;주진규;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2011
  • Green column and green beam, key structural members of green frame, have the characteristics of post-lintel structure, thanks to the steel frame in the connection, enabling prompt and precise installation. The connection of green frame can be divided into 4 types, depending on its shape, and each type is associated with different characteristics and construction methods. Notably, as the connection between green columns have differing types and sequences of work, subject to the connection method in use, a connection method optimized for relevant site conditions need to be selected. Therefore, this study analyzed pros and cons of 4 different types of green frame connection methods. The results set forth herein will provide basic data for subsequent studies to comparatively analyze the performance and constructibility of different green frame connection methods.

  • PDF

합성 PC 구조 접합부공사의 생산성 향상을 위한 철근배근 도구 개발 기초연구 (A basic study of reinforcement tools development for Productivity Improvement of Composite PC connection work)

  • 김근호;임채연;나영주;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.339-340
    • /
    • 2012
  • Green frame is combined by structural steel and reinforcements of Green column and beam and unified by cast-in-place concrete. However, when upper reinforcements penetrate structural steel hole, the execution is difficult due to interference of joint and a rib of deformed reinforcements. Therefore, the objective of this study is to propose the reinforcement tools to improve productivity of precast structure connection construction. The reinforcement tools proposed in this study can be helpful to improve constructability, safety, duration, and cost comparing with conventional reinforcement method since unskilled workers can deal with reinforcements easily.

  • PDF

포항 Grand M Hotel, 리노베이션 계획안 (Grand M Hotel interior renovation)

  • 김혜자
    • 한국실내디자인학회:학술대회논문집
    • /
    • 한국실내디자인학회 2006년도 춘계학술발표대회 논문집
    • /
    • pp.97-98
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997 Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF