• Title/Summary/Keyword: Steel transmission tower

Search Result 53, Processing Time 0.028 seconds

Wind tunnel tests on wind loads acting on steel tubular transmission towers under skewed wind

  • YANG, Fengli;NIU, Huawei
    • Wind and Structures
    • /
    • v.35 no.2
    • /
    • pp.93-108
    • /
    • 2022
  • Steel tubular towers are commonly used in UHV and long crossing transmission lines. By considering effects of the model scale, the solidity ratio and the ratio of the mean width to the mean height, wind tunnel tests under different wind speeds on twenty tubular steel tower body models and twenty-six tubular steel cross-arm models were completed. Drag coefficients and shielding factors of the experimental tower body models and cross-arm models in wind directional axis for typical skewed angles were obtained. The influence of the lift forces on the skewed wind load factors of tubular steel tower bodies was evaluated. The skewed wind load factors, the wind load distribution factors in transversal and longitudinal direction were calculated for the tubular tower body models and cross-arm models, respectively. Fitting expressions for the skewed wind load factors of tubular steel bodies and cross-arms were determined through nonlinear fitting analysis. Parameters for skewed wind loads determined by wind tunnel tests were compared with the regulations in applicable standards. Suggestions on the drag coefficients, the skewed wind load factors and the wind load distribution factors were proposed for tubular steel transmission towers.

Development of the Corrosion Deterioration Inspection Tool for Transmission Tower Members

  • Woo, Sangkyun;Chu, Inyeop;Youn, Byongdon;Kim, Kijung
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.293-298
    • /
    • 2016
  • Recently, interests for maintenance of transmission tower are increasing to extend life of structures and reduce maintenance cost. However, existing classical diagnosis method of corrosion deteriorated degree on the transmission tower steel members, visual inspection, has a problem that error often due to difference of inspector's individual knowledge and experience. In order to solve the problem, this study carried out to develop the corrosion deterioration inspection tool for transmission tower steel members. This tool is composed of camera equipment and computer-aided diagnosis system. We standardized the photographing method by camera equipment to obtain suitable pictures for image processing. Diagnosis system was designed to evaluate automatically degree of corrosion deterioration for member of transmission tower on the basis of the RGB color image processing techniques. It is anticipated that developed the corrosion deterioration inspection tool will be very helpful in decision of optimal maintenance time for transmission tower corrosion.

Development of Arm Insulator for Self-Build Based Emergency Tower (긴급복구용 자주조립식 철주 절연암 개발)

  • Min, Byeong-Wook;Wi, Hwa-Bog;Park, Jae-Ung;Lee, Cheol-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.107-108
    • /
    • 2007
  • Overhead transmission lines are completely exposed to the environment. This causes faults in transmission lines due to natural environmental conditions. In some cases, transmission towers are damaged by typhoons and snow, as well as sleet on the transmission lines. It takes a lot of time to repair the damaged towers. For emergency restoration purposes, steel poles are installed to temporarily supply power. Before 2003, emergency restoration steel poles were made of angled steel, which required a large number of beams, bolts, etc. In addition, the foundation of the steel pole and ground wire was constructed using excavation and burial methods, therefore it required a lot of manpower and time to construct temporary transmission lines. In September 2003, typhoon Maemi, whose maximum wind speed was 60m/s, hit Korea. 'Maemi' destroyed transmission lines in the Busan and Geojea area, causing long blackouts. To reduce the recovery time to the damaged transmission lines, self-build based emergency towers were developed. self-build based emergency towers reduced recovery time from 24 hours to 4 hours or less. However, the self-build based emergency tower had no arms, so the temporary transmission lines could only be constructed without curves in line routes. In this paper, solving these self-build based emergency tower limitations, using insulated arms(designed for use with the self-build based emergency tower), shall be explained.

  • PDF

Finite Element Analysis of 345kV Transmission Tower considering Nonlinear Factors (비선형인자를 고려한 345kV 송전철탑의 유한요소해석)

  • Kim, Jong-Min;Chang, Jin-Won;Park, Jong-Sup;Kang, Young-Jong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.337-340
    • /
    • 2008
  • There were two transmission tower collapses due to Typhoon 'Maemi' in 2003. The reason that a collapse was happened was excessive wind load. One was buckled in the leg part and the other was buckled in the middle bracing part. To investigate a steel transmission tower failure mechanism, 2nd order nonlinear analysis should be performed. Considering the effect of initial imperfection and theresidual stress of angle section during nonlinear analysis, this study can estimate the ultimate strength and the ultimate behavior of the transmission tower.

  • PDF

Nonlinear Analysis of 345kV Transmission Tower Considering Initial Imperfection and Residual Stress (초기결함과 잔류응력을 고려한 345kV 송전철탑의 비선형해석)

  • Chang, Jin-Won;Kim, Seung-Jun;Park, Jong-Sup;Kang, Young-Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.283-286
    • /
    • 2008
  • There were two transmission tower collapses due to Typhoon 'Maemi' in 2003. The reason that a collapse was happened was excessive wind load. One was buckled in the leg part and the other was buckled in the middle bracing part. To investigate a steel transmission tower failure mechanism, 2nd order nonlinear analysis should be performed. Considering the effect of initial imperfection and theresidual stress of angle section during nonlinear analysis, this study can estimate the ultimate strength and the ultimate behavior of the transmission tower.

  • PDF

Development of Compact Towers with Insulation Arm in Korea (절연암 적용 컴팩트 철탑 개발)

  • Lee, Won-kyo;Yun, Cheol-Hee
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.2
    • /
    • pp.63-66
    • /
    • 2018
  • Lattice towers and tubular steel poles have been commonly used for electrical power transmission in Korea as well as the other countries. They are durable, structurally stable, simple and can easily be constructed in limited spaces. However, residents are opposed to construct transmission lattice towers in their areas because they are not visually attractive, and electrical field occur at the transmission lines. Underground transmissions have been used instead of the traditional towers to resolve these problems, however they are not cost effective to construct and run. Therefore, we have developed compact towers that are more attractive, well blend into the surrounding environment and much more economical than underground transmissions. This paper shows the design of a compact towers with insulation arm, in order to reduce the height of tower and the separation between phases. The compact tower can be installed in a narrow right-of-way. Insulation arms are easily applied to lattice and steel tubular towers instead of steel arms. Compact towers with insulation arm are also considered as a solution to have public acceptance or to create a familiar atmosphere among towers and people. Compact tower compared with a conventional tower, insulation arms reduces the width and height of the tower by 20% and 15% respectively.

An Experimental Study on the Estimate of Wind Force Coefficient of Transmission Tower Rectangular Frame (철탑 사각골조의 풍력 계수 산정에 관한 실험적 연구)

  • Shin, Koo-Yong;Lim, Jae-Seob;Hwang, Kyu-Seok;Kil, Yong-Sik
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The wind force coefficient of a transmission tower frame shows several characteristics when the section shape, solidity ratio, and wind direction angle are changed. In this study, the wind force characteristics of a transmission tower frame with a basic structure were evaluated using different solidity ratios and wind direction angles in a wind tunnel test. According to the solidity ratio, the size of the structure and the rectangular-frame model of the transmission tower were changed by adding a two-dimensional (2D) or three-dimensional (3D) structure. The transmission tower's rectangular frame was tested by changing the wind direction angle of the 2D-type structure from 0 to $90^{\circ}$ and by changing the wind direction angle of the 3D-type structure from 0 to $45^{\circ}$ Based on the results that were obtained, it can be concluded that the wind force coefficient of a transmission tower frame can be used as preliminary data in deciding the transmission tower's wind load.

765kV Steel Tubular Tower Design On Considering Stringing Load (가선작업 하중을 고려한 765kV 강관철탑 설계)

  • Jung, Tay-Ho;Kim, Shin-Chul;Yoon, Young-Soon;Shin, Tae-Woo;Lee, An-Keun;Kim, Kwang-Youl
    • Proceedings of the KIEE Conference
    • /
    • 1998.11c
    • /
    • pp.935-937
    • /
    • 1998
  • The stringing load was added to tower design that consider the active load in 765kV transmission line construction. The nominal auxiliary members of steell tubular tower arm were altered into stress members by means of three dimensional design analysis method. 765kV transmission line construction also use self-standing tower that does not install temporary wire which support the section tower placed between drum field and engine field when stringing process.

  • PDF

Development of Eco-friendly Electric Transmission Towers in KEPCO (환경조화형 철탑 개발)

  • Lee, Won-kyo;Mun, Sung-Duk;Shin, Kooyong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.3
    • /
    • pp.135-140
    • /
    • 2019
  • Lattice towers and tubular steel poles have been commonly used for electrical power transmission in Korea. They are durable, structurally stable, simple and can easily be constructed in limited spaces. However, residents are opposed to construct transmission lattice towers in their areas because they are not visually attractive, and electrical field occur at the transmission lines. Underground transmissions have been used instead of the traditional towers to resolve these problems, however they are not cost effective to construct and run. Therefore, we have developed eco-friendly towers that are more attractive, well blending into the surrounding environment, and much more economical than underground transmissions. There are four categories of the eco-friendly electric transmission towers about design aspects. Firstly, there is decoration type such as tree tower and ensemble tower. Tree tower looks like actual trees with leaves and branches so it blends into surroundings. Ensemble towers were designed after pair of crane birds. Those towers have decoration features and art works. Structural examination and manufacturing this type would be very similar to the conventional transmission towers. Secondly, there is arm design type such as traditional tower. Design features are added to the existing towers. As partial design can be adoptable on these types, it can easily meet height regulations and attach to conventional lattice towers and tubular steel poles. Also, these towers are more economical than others. Third category is multipurpose type such as Sail Tower. These towers have simple pole or tubular structure with features which can be used as information message board, public relations and much more. This type will face greater wind pressure because of the area of the board, also visibility must take into consideration. Lastly, there is moulding type such as arc pylon. It is different shape to the conventional towers - lattice towers and tubular steel poles. Dramatic design changes have been adapted - from a hard and static tower to a soft and curved tower. These towers will well stand out in the field. However, structural examination and manufacturing this type would be difficult and costly. Also certain towers of this type would require scaffolding or false work to construct, which will result in limitations of the construction area. This paper shows KEPCO 154 kV Sail tower in detail. KEPCO 154 kV Sail tower that is included in fabrication of sample tower and tower testing has developed and the results are presented in this paper. We hope that sail tower is also considered as a solution to have public acceptance or to create a familiar atmosphere among towers and people in coastal area.

A Study on the Ultimate Load of Electric Transmission Tower Considering Member Strength and Joint Strength (부재 내력과 접합부 내력을 고려한 송전강관철탑의 극한하중 도출에 관한 연구)

  • Kim, Woo-Bum;Jeon, Bum-Jun;Suh, Yong-Pyo
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.5
    • /
    • pp.435-443
    • /
    • 2010
  • The current design practice of an electric transmission tower is based on the allowable stress design. Design strengths of the electric transmission tower's compression member are determined by buckling the strength of the member itself without considering joint strength. There is a possibility of a joint failure prior to the buckling of a member. Therefore, in this study, joint strength is calculated for various member forces, and the shape of joint and database of strength were established. These data was compared with the member strength obtained from previous research studies based on an equivalent nonlinear analysis technique. Finally, practical evaluation and design method to distinguish failure mode in an electric transmission tower member is proposed.