• 제목/요약/키워드: Steel Concrete Plate

검색결과 673건 처리시간 0.025초

淸州 및 報恩地方의 頭首工洪水災害에 關한 調査硏究(II) -災害原因 및 對策方案을 中心으로- (A Study on the Damages of Head Works by the Storm Flood in the Area of Cheong Ju and Boeun -Emphasis onFactors Influenced on the Disasters and their Countermeasures-)

  • 남성우;김철기
    • 한국농공학회지
    • /
    • 제24권2호
    • /
    • pp.49-55
    • /
    • 1982
  • The purpose of this study is to classify the factors influenced on the damages of head works suffered from the storm flood occurred on July 22 1980 in both Musim and Bochong rivers and to find out an integral counter measures against the causes influenced on the disaster of head works in the engineering aspect of planning, design, construction and maintenance. In this survey, number of samples was taken 25 head Works, and the counter measures against the causes of their disasters summarized was as follows, 1. In the aspect of planning a. As the flood water level after the establishment of head works is more increased than the level before setting of head works owing to having more gentle slope of river bed between the head works than nature slope of river bed. Number of head works should be reduced for the appropriate annexation of them b. In the place where head works is established on the curved point of levee, the destruction of levee becomes severe by the strong deflective current. Therefore the setting of head works on the curved point should be kept off as long as possible and in case of unavoidable circumstances the construction method such as reinforced concrete wall or stone wall filed with concrete and anchored bank revetments should be considered. 2. In the aspect of design a. As scoring phenomena at up stream is serious around the weir Where the concentration of strong current is present in such a place, up stream apron having impermeability should be designed to resist and prevent scoring. b. As the length of apron and protected bed is too short to prevent scoring as down stream bed, the design length should be taken somewhat more than the calculated value, but in the case the calculated length becomes too long to be profitable, a device of water cushion should be considered. c. The structure of protected river bed should be improved to make stone mesh bags fixed to apron and to have vinyl mattress laid on river bed together with the improvement for increasing the stability of stone mesh bags and preventing the sucked sand from the river bed. d. As the shortage of cut-off length, especialy in case of the cutoffs conneting both shore sides of river makes the cause of destruction of embankment and weir body, the culculation of cut-off length should be taken enough length based on seepage length. 3. In the aspect of design and constructions a. The overturing destruction of weir by piping action was based on the jet water through cracks at the construction and expansion joints. therefore the expansion joint should be designed and constructed with the insertion of water proof plate and asphalt filling, and the construction joint, with concaved shape structure and steel reinforcement. b. As the wrong design and construction of the weep holes on apron will cause water piping and weir destruction, the design and construction of filter based on the rule of filter should be kept for weep holes. c. The wrong design and construction of bank revetment caused the severe destruction of levee and weir body resulting from scoring and impulse by strong current and formation of water route behind the revetment. Therefore bank revetment should be designod and constructed with stone wall filled with concrete and anchored, or reinforced concrete wall to prevent the formation of water flow route behind the wall and to resist against the scoring and impulse of strong stream. 4. In the aspect of maintenance When the damaged parts occurred at head works the authorities and farmers concerned should find and mend them as soon as possible with mutual cooperation, and on the other hand public citizen should be guided for good use of public property.

  • PDF

긴급시공이 가능한 FRP 내진보강재로 보강된 기둥의 내진성능평가 실험 (An Experimental Study on Seismic Performance Evaluation of Retrofitted Column of FRP Seismic Reinforcement that can be Emergency Construction)

  • 김진섭;권민호;서현수;임정희;김동영
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제17권6호
    • /
    • pp.21-30
    • /
    • 2013
  • 최근 발생한 대규모 지진으로 구조물의 내진보강에 대한 사회적 관심도가 높아지고 있다. 특히 내진설계가 반영되지 않은 기둥의 경우 지진에 의한 횡하중을 저항하지 못하고, 취성적인 파괴가 유발되어 구조물 전체적 붕괴를 유발할 수 있다. 따라서 빠른 시간내에 보강이 가능하면서 기둥에 손상을 주지 않는 기존의 보강법과 구별되는 응급 보강법이 필요하다. 과거에는 기둥 보강법으로 단면 증설법과 강판보강법 등이 개발되어 현장에 적용되었지만, 최근에는 FRP (Fiber Reinforced Polymer)의 장점을 활용한 탄소섬유시트공법이 많이 사용되고 있다. 본 연구에서는 긴급시공이 가능한 체결식 FRP 내진보강재를 사용한 구조물의 내진성능보강효과를 검토하고자 하였다. 검토를 위하여 실제 구조물의 축소모델의 철근콘크리트 시험체를 제작하고 횡방향 변위하중을 가력하였다. FRP 내진보강재를 이용한 내진보강시공 후 실내시험을 통하여 내진성능을 평가하였다. 그 결과 개발된 보강재의 철근콘크리트 구조물에 보강 시, 내진성능이 향상됨을 확인하였다.

과수재배용 온실의 구조유형과 설계요소 분석 (Analysis of Structural Types and Design Factors for Fruit Tree Greenhouses)

  • 남상운;고기혁
    • 생물환경조절학회지
    • /
    • 제22권1호
    • /
    • pp.27-33
    • /
    • 2013
  • 본 연구는 과수재배 시설의 표준화 및 환경조절기술개발을 위한 기초자료로 제공하는 것을 목적으로 과수재배용 온실의 실태를 조사하여 구조유형과 설계요소를 분석하고, 기상재해에 대한 안전성과 구조 및 환경관리에 대한 개선방안을 검토하였다. 시설재배 면적이 가장 많은 5개 품목 중 주로 제주도에서 재배되고 있는 감귤과 현재 재배온실을 찾을 수 없는 단감을 제외한 포도, 배 및 복숭아재배 온실을 연구대상으로 하였다. 감귤과 포도재배 온실은 꾸준히 증가하고 있으나 저장시설의 발달로 배와 단감재배 온실은 감소하고 있는 추세이다. 앞으로는 비가림 효과가 크고 저장성이 떨어지는 품목을 중심으로 과수재배 온실의 변화가 예상된다. 조사대상 온실 중 배 재배 온실과 복숭아재배 대형 단동온실을 제외하고는 대체로 보급형 온실의 규격을 따르고 있으며, 재배작목별로 특성화된 온실은 없는 것으로 나타났다. 과수재배 온실의 대부분은 농촌진흥청과 농림수산식품부에서 고시한 농가보급형 모델이나 내재해형 모델의 부재규격을 따르고 있었다. 기초는 대부분 콘크리트 기초를 사용하고 있었으며, 배 재배 온실의 경우에는 내재해형 모델보다 두꺼운 단면의 기둥을 사용하고, 강판을 기둥의 하단에 용접하여 매설한 형태의 특수한 기초를 적용하고 있었다. 조사대상 온실의 구조적 안전성을 검토한 결과 대부분 안전하였으나 김천과 천안의 포도재배 온실, 남원과 천안의 복숭아재배 온실에서 적설에 불안전한 것으로 나타났고, 남원의 복숭아재배 온실은 풍속에 대한 안전성도 부족한 것으로 나타났다. 또한 채소재배 온실을 복숭아재배로 전용한 온실의 경우 적설과 풍하중 모두 상당히 불안정한 것으로 나타났다. 과수의 수형, 수고 및 재식간격을 고려하여 과수 재배 온실의 적정규격을 검토한 결과 포도재배 온실은 폭 7.0~8.0m, 측고 2.5~2.8m가 적당하고, 배와 복숭아재배 온실은 폭 6.0~7.0m, 측고 3.0~3.3m 정도가 적당한 것으로 판단된다.