• Title/Summary/Keyword: Station operator

Search Result 83, Processing Time 0.023 seconds

Synthetic Circumstantial Judgement System Applied Recognition of Fire Levels Model (화재 상황 인식 모델을 적용한 종합 상황 판단 시스템)

  • Song, Jae-Won;Lee, Se-Hee;An, Tae-Ki;Shin, Jeong-Ryol
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1275-1281
    • /
    • 2011
  • This paper presents synthetic circumstantial judgement system that detects and predicts a fire in subway station. Unlike conventional fire surveillance systems that judge the fire or not through smoke, CO, temperature or variation of temperature, a proposed system discovers a fire more easily or gives the alarm high possibility of fire to operator through recognition of fire levels based on Fuzzy Inference System using by FCM and information of objects from video data.

  • PDF

Teleoperator Control Systems with Short Time Delay (시간 지연을 포함한 원격제어 시스템)

  • 장진규;한명철
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.721-724
    • /
    • 2000
  • This paper has been demonstrated to be essential to successful telemanipulator control when the communication delay between master arms in the operator control station and telemanipulators in the remote site. This paper includes the human dynamics to generate a control command, the monitoring force feedback in order to robust under short time delays and the controller not to requre the derivative of interaction forces. Simulation results suggest that, the proposed control system should be superior to conventional systems in terms of performance and robustness under short time delays.

  • PDF

A Study on Improvement of Means of Realization of Train Destination Equipment System (열차행선안내게시시스템 개선방안 연구)

  • Yoon, In-Young;Yeo, Yong-Joo;Kim, Kwang-Hwi;Kim, Ho-Chang
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1566-1573
    • /
    • 2007
  • Urban railway system that leads the urban public transportation enables the passengers to use the subway system safely and conveniently by indicating the destination of, status of approach of and other information on train through Train Destination Equipment(TDE), which is one of the important passenger services. The existing system is composed of Host Station Equipment(HSE) and operator panel that receives necessary input on train information from Total Traffic Control System(TTC), Local Station Equipment(LSE) that controls Train Destination Indicator(TDI) installed at each station, and Train Destination Indicator that ultimately displays train information to the passengers using the train system. This study aims to realize stabilized and reliable announcement system for destination of train by considering processing procedure and method of expression of inputted information of the existing system of notification of announcement of destination of train that can be applied in the RFID, which is the base technology of USN for which service expansion is easy, and to realize system that considers interface with USN and expandability with other facilities in the future.

  • PDF

Practical and Verifiable C++ Dynamic Cast for Hard Real-Time Systems

  • Dechev, Damian;Mahapatra, Rabi;Stroustrup, Bjarne
    • Journal of Computing Science and Engineering
    • /
    • v.2 no.4
    • /
    • pp.375-393
    • /
    • 2008
  • The dynamic cast operation allows flexibility in the design and use of data management facilities in object-oriented programs. Dynamic cast has an important role in the implementation of the Data Management Services (DMS) of the Mission Data System Project (MDS), the Jet Propulsion Laboratory's experimental work for providing a state-based and goal-oriented unified architecture for testing and development of mission software. DMS is responsible for the storage and transport of control and scientific data in a remote autonomous spacecraft. Like similar operators in other languages, the C++ dynamic cast operator does not provide the timing guarantees needed for hard real-time embedded systems. In a recent study, Gibbs and Stroustrup (G&S) devised a dynamic cast implementation strategy that guarantees fast constant-time performance. This paper presents the definition and application of a cosimulation framework to formally verify and evaluate the G&S fast dynamic casting scheme and its applicability in the Mission Data System DMS application. We describe the systematic process of model-based simulation and analysis that has led to performance improvement of the G&S algorithm's heuristics by about a factor of 2. In this work we introduce and apply a library for extracting semantic information from C++ source code that helps us deliver a practical and verifiable implementation of the fast dynamic casting algorithm.

Energy-Efficient Base Station Operation With Base Station Sharing in Wireless Cellular Networks (기지국 공유가 가능한 셀룰러 네트워크에서 에너지 효율화를 위한 기지국 운영 방안)

  • Oh, Eunsung
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.1
    • /
    • pp.3-8
    • /
    • 2013
  • In this paper, we present an energy-efficient base station operation with base station sharing in wireless cellular networks. Firstly, cost functions are modeled related with the amount of energy usage and traffic load. We use game theory and formulate an energy bill game, where the players are the service operators which are operating base stations and their strategies are the bill of their base station energy consumption and hand-over traffic load to the others service operators. We show that the global optimal performance in terms of minimizing the energy costs is achieved at the Nash equilibrium of the formulated energy bill game. Simulation results confirm that the proposed approach can reduce the energy bill of the service operator, and show the relationship between the energy cost saving and various parameters.

Tele-metering

  • Hearte, L.O.
    • 전기의세계
    • /
    • v.2
    • /
    • pp.6-14
    • /
    • 1949
  • Telemetering may be described as the art of metering at a considerable distance those quantities which are ordinarily encountered in industry, and in the generation of electric power. It is in the production of electric power that telemetering is particularly important, for it permits the system operator, or load dispatcher, to have before him at all times a continuous graphic record of the power output of each individual generating station together with an automatically made continuous graphic record of the total system output. There desired individual graphic records may be obtained showing power flow in or out, on important tie lines, etc. Such arrangements have the very great advantage that loads may be assigned to each generating station so that the best over-all system economy may be obtained and the system operator at all times may see with his own eyes that loads scheduled are actually held at the various stations. Moreover, with such equipment, in the event of system or station trouble the load dispatcher can see exactly what station, or stations, are affected and to what extent, without having to get in touch with anyone by telephone. Decisions can, therefore, be quickly reached for rescheduling the load. One of the most accurate and reliable telemetering systems is based on the use of potentiometric circuits, the fundamentals of which are discussed below. A member of such telemetering systems have been installed for the Boston Edicon Co., Boston, Massachusetts, the Consolidated Edison Co. of New York City. The Public Service Gas & Electric Co. of Newark, new Jersey. The Philadelphia Electric Co. for Philadelphia, Pennsylvania, and the Pennsylvania Railroad Co. for their electrified zone between New York and Washington a distance of over 200 miles. The scale of the totalizing recorder for the New York area is 3,000,00 KW. That of the totalizing recorder for the Philadelphia area is 2,000,000 KW. The initial installation using this type of equipment described was placed in service for the Philadelphia Electric Co. in 1923. All of the original recording instruments are still in service, later instruments have been added to take care of additions to the power system and naturally these later recorders have incorporated in those refinements in design made since the earlier ones were manufactured. Many other installations of similar equipment have been made in the United States in various locations such as at St. Louis, on the West Coast, at Baltimore and in Washington, D.C. While the use of these basic potentiometric circuits involves the use of continuous metallic circuits of good insulation resistance and free of grounds, nevertheless, intermediate transmission links, involving and impulse method suitable for use on telephone Morse carrier channels is available. This same method may be employed on power line carrier systems and is also suitable for use on beam type microwave transmission. Many impulse type units are also used as a link in these potantiometric methods. For the sake of brevity a description is given only of these basic potentiometric circuits. If there is sufficient interest in Korea, a further paper can be given covering those impulse circuits also.

  • PDF

INTRODUCTION OF DATELLITE COMMUNICATION SYSTEM TEST LANGUNGE

  • Ahn, Dong-Hyun;Jung, Won-Chan
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1994.10a
    • /
    • pp.229-231
    • /
    • 1994
  • For the effective use of satellite communication transponder, tests for the payload system such as IOT(In-Orbit Test), RPM(Routine Payload Monitoring), CSM(Communicatios System Monitoring), and REV(Remote Earth-Station Verification) have to be conducted. Those tests are used in order to verify the condition and generic design of the satellite, to provide a database for operational calculations, and to maintain the quality of communication services. As the satellite communication system gets with wider expansion with higher complexity of operation, tests for the communication system also need more complex operation that usesophisticated computer-controlled measuring system. For and C language based measurement functions, which uses GPIB protocol and SCPI commands. But SICL requires knowledge of BASIC and C language as well as GPIB and SCPL system. This paper introduces a new language called CALSTEP-Control and Access Language for the Systems of Test Equipment and Payload. This language is designed for the operator to perform the tests for the satellite communication system without any special knowledge that is mentioned above. This language has very limited number of commands which are to be used to control the payload system and test equipments to perform IOT and CSM, and those commands are very readable and easy to understand, so an operator without any knowledge of BASIC and C programming language, or SICL and SCPI command can use it.

  • PDF

A Study on the Operator Performance According to the Drastic Change of Illumination Level and Lighting Environment of Control Room in Nuclear Power Plants

  • Shin, Kwang Hyeon;Lee, Yong Hee
    • Journal of the Ergonomics Society of Korea
    • /
    • v.32 no.1
    • /
    • pp.37-45
    • /
    • 2013
  • Objective: This study describes the change of operator performance in drastic change of illumination level, and proposes an alternative method to cope with it. Background: The control standard of illumination for nuclear power plants(NPPs) is based on the set of limit criteria for maintaining a specific illumination level. However, there is a possibility to cause human errors according to the psychological and physiological influences to operators in the situation of drastic change of illumination such as SBO(Station Black Out), so a basic study is necessary to review the current approach. Method: We assessed the visual fatigue, subjective work load and task performance according to the three illumination situations(Normal Illumination, Emergency Illumination, and Drastic Change of Illumination). Result: Research finding shows that there are not significant differences in task performance between normal illumination (1,000lx level) and emergency illumination (100lx level), only if beyond the dark adaptation limit. However, subjective work load on mental demand and visual fatigue show a potential challenge to visual performance in drastic change of illumination. Conclusion/Application: Several trials can complement this challenge in NPPs by applying 3-way communication, enhancing readability of procedures, and managing the visual factors affecting the operators' performance through a Visual Environment Management Program including visual health aspects, etc.

A Warning Threshold Proposal for Operation Improvement of Maritime DGPS Reference Station (해양용 DGPS 운영성 개선을 위한 시스템 경고 임계값 제안)

  • Choi, Yong Kwon;Lee, Ju Hyun;Son, Seok Bo;Lee, Sang Jeong
    • Journal of Advanced Navigation Technology
    • /
    • v.21 no.1
    • /
    • pp.12-20
    • /
    • 2017
  • A maritime DGPS in Korea offers pseudo-range correction information and monitors integrity of correction data by using multiple GNSS receivers. The maritime DGPS reference station and integrity monitor service sets alarm threshold value about integrity monitoring parameters for preventing service interruption status. However there is no way to avoid system interruption according to malfunction of backup systems and outside factors. Therefore, in this paper, warning threshold values were proposed for maritime DGPS operator can be counteract in advance. And Markov analysis method was carried out for selection of these warning threshold values.

Modeling and simulation of foxboro control system for YGN#3,4 power plant (영광 3,4호기 Foxboro 제어시스템 모델링 및 시뮬레이션)

  • 김동욱;이용관;유한성
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.179-182
    • /
    • 1997
  • In a training simulator for power plant, operator's action in the MCR(Main Control Room) are given to plant process and computer system model as an inputs, and the same response as in real power plant is provided in real time. Inter-process communication and synchronization are especially important among various inputs. In the plant simulator, to simulate the digital control system such as FOXBORO SPEC-200 Micro control system, modification and adaptation of control card(CCC) and its continuous display station(CDS) is necessary. This paper describes the modeling and simulation of FOXBORO SPEC-200 Micro control system applied to Younggwang nuclear power plant unit #3 & 4, and its integration process to the full-scope replica type training simulator. In a simulator, display station like CDS of FOXBORO SPEC-200 Micro control system is classified as ITI(Intelligent Type Instrument), which has a micro processor inside to process information and the corresponding alphanumeric display, and the stimulation of ITI limits the important functions in a training simulator such as backtrack, replay, freeze and IC reset. Therefore, to achieve the better performance of the simulator, modification of CDS and special firmware is developed to simulate the FOXBORO SPEC-200 Micro control system. Each control function inside control card is modeled and simulated in generic approach to accept the plant data and control parameter conveniently, and debugging algorithms are applied for massive coding developed in short period.

  • PDF