• Title/Summary/Keyword: Standard Process Plan

Search Result 286, Processing Time 0.024 seconds

BIM-Based Generation of Free-form Building Panelization Model (BIM 기반 비정형 건축물 패널화 모델 생성 방법에 관한 연구)

  • Kim, Yang-Gil;Lee, Yun-Gu;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.19-31
    • /
    • 2022
  • With the development of 3D-based CAD (Computer Aided Design), attempts at freeform building design have expanded to small and medium-sized buildings in Korea. However, a standardized system for continuous utilization of shape data and BIM conversion process implemented with 3D-based NURBS is still immature. Without accurate review and management throughout the Freeform building project, interference between members occurs and the cost of the project increases. This is very detrimental to the project. To solve this problem, we proposed a continuous utilization process of 3D shape information based on BIM parameters. Our process includes algorithms such as Auto Split, Panel Optimization, Excel extraction based on shape information, BIM modeling through Adaptive Component, and BIM model utilization method using ID Code. The optimal cutting reference point was calculated and the optimal material specification was derived using the Panel Optimization algorithm. With the Adaptive Component design methodology, a BIM model conforming to the standard cross-section details and specifications was uniformly established. The automatic BIM conversion algorithm of shape data through Excel extraction created a BIM model without omission of data based on the optimized panel cutting reference point and cutting line. Finally, we analyzed how to use the BIM model built for automatic conversion. As a result of the analysis, in addition to the BIM utilization plan in the general construction stage such as visualization, interference review, quantity calculation, and construction simulation, an individual management plan for the unit panel was derived through ID data input. This study suggested an improvement process by linking the existing research on atypical panel optimization and the study of parameter-based BIM information management method. And it showed that it can solve the problems of existing Freeform building project.

A Study on the Analysis of Village Characteristics for Planning Rural Settlement Area Development - Mainly on Sungnae-Myun District - (농어촌 정주생활권 개발계획 수립을 위한 마을특성분석 방안 연구 -성내면을 대상으로-)

  • 김학응;오무형;이신호
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.38 no.6
    • /
    • pp.51-63
    • /
    • 1996
  • This study is about the problems found in the process of the current governments planning rural settlement area development. As a measure to solve them, It proposed the analysis method of village characteristic in terms of standard score and tried to use this method as a basic material in planning more effective rural settlement area development. On the basis of the above analysis, which is an objective basic material to solve the problems revealed in the process of the bottom-up development planning by the residents' demands, It shows the following conclusion about what method should be applied to each part according to a village's characteristics and its development level. 1. Accessibility can be a basic material for setting the local area, analyzing its settlement system, and them such development facilities as village-linking roads, rural road, or various kinds of bridges and determining the investment priority. 2. With the index of the industrial basis, we can see what village has plenty of social, economical resources including advanced industrial facilities and looking into the advance level of the industrial basis, we can get some information about determining the local area development direction such as estashing the plan to build a farm product gathering center, a collective work place, storage facilities, and special housing development. 3. Since the issue about living environment is raising it's head, compared to weakened agricultural competitive power, with the analysis of this living environment, we can get an objective basic material for solving problems caused by the local egoism and the effective investment strategy of the limited resources. Therefore, It is necessary that we should abstain from expert-centered planning and formal public opinion-collecting and on the basis of this analytic result, we should plan development. We need to continue our research about index selecting and differentiation, weight etc. and using these analysis methods, we should make up a systematic development plan by analyzing village characteristics and setting the development direction.

  • PDF

Multiagent Enabled Modeling and Implementation of SCM (멀티에이전트 기반 SCM 모델링 및 구현)

  • Kim Tae Woon;Yang Seong Min;Seo Dae Hee
    • The Journal of Information Systems
    • /
    • v.12 no.2
    • /
    • pp.57-72
    • /
    • 2003
  • The purpose of this paper is to propose the modeling of multiagent based SCM and implement the prototype in the Internet environment. SCM process follows the supply chain operations reference (SCOR) model which has been suggested by Supply Chain Counsil. SCOR model has been positioned to become the industry standard for describing and improving operational process in SCM. Five basic processes, plan, source, matte, deliver and return are defined in the SCOR model, through which a company establishes its supply chain competitive objectives. A supply chain is a world wide network of suppliers, factories, warehouses, distribution centers and retailers through which raw materials are acquired, transformed or manufactured and delivered to customers by autonomous or semiautonomous process. With the pressure from the higher standard of customer compliance, a frequent model change, product complexity and globalization, the combination of supply chain process with an advanced infrastructure in terms of multiagent systems have been highly required. Since SCM is fundamentally concerned with coherence among multiple decision makers, a multiagent framework based on explicit communication between constituent agents such as suppliers, manufacturers, and distributors is a natural choice. Multiagent framework is defined to perform different activities within a supply chain. Dynamic and changing functions of supply chain can be dealt with multi-agent by cooperating with other agents. In the areas of inventory management, remote diagnostics, communications with field workers, order fulfillment including tracking and monitoring, stock visibility, real-time shop floor data collection, asset tracking and warehousing, customer-centric supply chain can be applied and implemented utilizing multiagent. In this paper, for the order processing event between the buyer and seller relationship, multiagent were defined corresponding to the SCOR process. A prototype system was developed and implemented on the actual TCP/IP environment for the purchase order processing event. The implementation result assures that multiagent based SCM enhances the speed, visibility, proactiveness and responsiveness of activities in the supply chain.

  • PDF

A Study on Correlation between the CMMI SPs and GPs at Maturity Levels 2 and 3

  • Lee, Min Jae;Rhew, Sung-Yul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.9-21
    • /
    • 2011
  • Assuming that the Capability Maturity Model Integration for Development v1.2 (CMMI) could be applied to an organization more effectively if the content similarities among practices were improved in terms of structure and composition, this paper presents the analysis of the correlations between the CMMI Specific Practices (SP) and Generic Practices (GP) for the Maturity Level 2 and 3 Process Areas using the Chi-square independence test. According to the analysis, a 22.2% correlation was observed. To minimize the problem of repeatedly applying similarities, 6 GPs that are highly correlated with the SPs were grouped together. Then, three different improvement plans: 1) development of a standard template-based project plan, 2) establishment of a configuration management system based on open source software to control work products and leverage experience, and 3) establishment of project assurance through an independent quality assurance-based organization and intensive review by higher-level management - were defined.

Human factors engineering progrma in nuclear power plant (원자력 발전소 인간공학 프로그램)

  • 나정창;이호형
    • Proceedings of the ESK Conference
    • /
    • 1996.10a
    • /
    • pp.125-140
    • /
    • 1996
  • Human Factors Engineering(HFE) program should be developed from the early stage of the design process for Nuclear Power Plant. The HFE program is conducted in accordance with the guidance in the Standard Review Plan(SRP) NUREG 0800, Chapter 18. The major purpose of this program is to reduce the incidence of human error during the operating life of the plants. A comprehensive human factors program is prepared by KOPEC to assure that key elements of human factors involvement are not inadvertently overlooked and the early, complete, and continuing inclusion of HFE in the design process. This paper is to introduce engineering steps of the HF activities to verify that the HF involvements on man-machine interface are adequate to support safe and efficient operation of nuclear power plant. If systems are developed without sufficient consideration on the HFE in the design, such systems may cost a high price due to the malfunction of the plant induced by the human errors.

  • PDF

A Study on the Improvement of Construction Progress Management for EVMS (공정-원가 통합관리를 위한 진도관리 개선 방안)

  • Lee, Kyoo-Hyun;Park, Chan-Jung;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

A Study on Planning and Composition of Module Unit in Korean Traditional House (전통한옥 '칸'의 계획과 구성에 관한 연구)

  • Kim, Jong-Hoon
    • Journal of the Korean housing association
    • /
    • v.23 no.4
    • /
    • pp.41-48
    • /
    • 2012
  • The purpose of the study, approaching from the aspect of the construction technologies, is to determine the architectural techniques of traditional wood architects in existence, through which the systems and techniques that create the inherent characteristics of Korean Architecture are clarified. With understanding traditional construction system and focusing on the fact that built environment results from the consistent standards and technologies of architects, this study inquires into the systematic standard and its formation that present in the process of planning for the overall scale and shape of a building from the following (four) perspectives. The study determines the characteristics of '間(Kan)' (unit; fundamental unit that measures Korean traditional houses) and the methods of columns disposition of which the '間 (Kan)' is made up. Once the necessary spaces are decided according to the size of a building, then floor plans are drawn with the standard unit, '間(Kan)'. The '間(Kan)', as a modular unit, is not only composing the floor plans, but also functioning as an Area unit, Space unit and Structural unit. Composition of '間(Kan)' varies with disposition of columns, and therefore multiform of floor and spaces are created. In this study, the '間(Kan)', as a standard unit, is used in the form of specific size and area, and it is demonstrated how the floor plans are developed by organizing the columns in accordance with the spaces requested.

A Deriving methodologies for OT&E items using WBS when acquiring a weapon system (무기체계 획득시 WBS를 활용한 운용시험평가 항목 도출방법 개발)

  • Jong Wan, Park;Hee Tae, Jeong
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.2
    • /
    • pp.1-10
    • /
    • 2022
  • In general, similar or previous projects are mainly referred to in order to derive operational test and evaluation(OT&E) items after acquiring weapon system. The idea that a more systematic method is needed is spreading because some of OT&E items derived in this process are redundant or unnecessary. Therefore, in this topic, we plan to use WBS, a tool that classifies components into a hierarchical structure and manages development easily to achieve the weapon system development goal. In addition, the WBS tool is applied to the medium-sized standard vehicle project, which is currently being research and developed, to effectively derive OT&E items. As a result of deriving OT&E items by applying WBS to the vehicle development field and electric devices of the medium-sized standard vehicle project, the operability and relationship were judged early, and then contents of the evaluation items could be written substantially while working on environmental adaptability. In the future, it is judged that the efficiency will be increased if the method discussed in this paper is applied when deriving the OT&E items from the R&D development project.

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

Empirical Modeling of Fouling Rate of Milk Pasteurization Process : A case study

  • Budiati, Titik;Wahyono, Nanang Dwi;Hefni, Muh.
    • International journal of advanced smart convergence
    • /
    • v.4 no.1
    • /
    • pp.11-17
    • /
    • 2015
  • Fouling in heat exchanger becomes a major problem of dairy industry and it increases the production cost. These are lost productivity, additional energy, additional equipment, chemical, manpower, and environmental impact. Fouling also introduces the risk of food safety due to the improper heating temperature which allow the survival of pathogenic bacteria in milk, introducing biofilm formation of pathogenic bacteria in equipments and spreading the pathogenic bacteria to milk. The aim of this study is to determine the fouling rate during pasteurization process in heat exchanger of pasteurized milk produced by Village Cooperative Society (KUD) "X" in Malang, East Java Indonesia by using empirical modeling. The fouling rate is found as $0.3945^{\circ}C/h$ with the heating process time ranged from 0 to 2 hours and temperature difference (hot water inlet temperature and milk outlet temperature) ranged from 0.654 to $1.636^{\circ}C$. The fouling rate depends on type and characteristics of heat exchangers, time and temperature of process, milk type, age of milk, seasonal variations, the presence of microorganism and more. This results will be used to plan Cleaning In Place (CIP) and to design the control system of pasteurization process in order to maintain the milk outlet temperature as standard of pasteurization.