• Title/Summary/Keyword: Standard Manpower Size

Search Result 27, Processing Time 0.021 seconds

Practical Suggestions for Promoting Maritime Arbitration in Korea (우리나라 해사중재 활성화를 위한 실무적 제언)

  • Ahn, Keon-Hyung
    • Journal of Arbitration Studies
    • /
    • v.31 no.1
    • /
    • pp.23-54
    • /
    • 2021
  • While maritime arbitration industry has not been prevalent in Korea, Korea ranked fifth in terms of export volume and its shipbuilding industry ranked top globally in shipbuilding order volume in 2020. The discrepancy between the maritime industry's productivity and relative lack of maritime arbitration has had a negative impact on Korea's economic development. To address these problems, this paper i) reviews preceding research, ii) examines the Korean maritime arbitration system's status and analyzes the KCAB's maritime arbitration statistics from 2005-2020, iii) examines major foreign maritime arbitration institutions' status and strategies including LMAA, SMA, SCMA, and HKMAG, and lastly iv) suggests practical ways to promote maritime arbitration in Korea. The Suggestions for promoting maritime arbitration are 1) to prepare and promote various maritime standardized forms for the Korean shipping industry, 2) to insert an arbitration clause in medium and large-size Korean shipping firms' B/L clause, 3) to expand professional maritime manpower training and other infrastructure, and 4) to enhance the predictability of the result of arbitration through maritime arbitral awards or by examining the feasibility of the appeal system against the arbitral award only on a point of law in the future. In conclusion, the success or failure of promoting maritime arbitration in Korea depends on the will, passion, cooperation and practice of the most important key players in maritime arbitration, such as the Asia Pacific Maritime Arbitration Center (APMAC), the Korean Commercial Arbitration Board (KCAB) and the Seoul Maritime Arbitrators Association (SMAA).

Improvement of Personnel Cost and Placement Scale of Quality Manager for Construction (건설공사 품질관리자의 인건비 및 배치규모 개선)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.327-335
    • /
    • 2018
  • In order to calculate the quality management cost of construction work, the process must conform to relevant laws and regulations. In details, the cost of the various items such as quality test fee and quality control activity cost are required to be calculated. Regarding the quality management costs, the labor cost is applied to the quality examination fee and the calculation unit quantity in the construction quality management duties. The application of the unit price of the labor cost stipulates that Construction Association of Korea and Korea Engineering & Consulting Association apply the unit price which is surveyed and published. However, in the related laws and regulations, the standard of the quality manager and quality tester is not clear. This accounts for the confusion in the cost of construction management and the cost of labor. In the current law, the allocation standard of quality control personnel is specified according to the size of the construction, but the standard of placement of quality testers is not specified. At the construction site, there is no assignment criteria manpower for quality testers except quality managers, or very little work is being done. The quality control personnel conducts the quality test work to be carried out by the quality tester, and this carrying out heavy work. Therefore, it is difficult to maintain quality control activities. In this study, the labor cost of quality management expenses and the allocation criteria of quality managers and quality testers are established and presented for the purpose of securing the quality of the construction work and preventing the construction work. It is stipulated that the standards of the relevant laws and regulations, which are not clear, should be classified into quality control personnel and quality testers according to the size of the construction. Based on the unit price of Korea Engineering & Consulting Association, the personnel expenses of quality managers and quality testers are proposed to apply the unit price of engineer (professional engineer, specialist, advanced, intermediate, beginner) and skilled technicians (advanced, intermediate, beginner).

Study on the Optimal Construction Method for the Compaction Method of Hydraulic Filling in Metropolitan Areas (도심지 물다짐 공법의 적정 시공방법에 관한 연구)

  • Jeong, Dal-Yeong;Jang, Jong-Hwan;Chung, Jin-Hyuck
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.175-181
    • /
    • 2020
  • This paper suggests a proper hydraulic filling method in downtown areas. Road subsidence on roadways and sidewalks in downtown areas can result in vehicle damage and casualties. The representative cause of road subsidence is the fraudulent construction in nearby construction sites. A deficiency of excavation restoration causes approximately 25~49% of subsidence. This is performed by equipment or manpower. Hydraulic filling is used in backfilling narrow pipe conduits and spaces between structures. On the other hand, standard specifications and quality assurance standards regarding hydraulic filling principles and construction conditions are insufficient. Therefore, in-door model experiments on hydraulic filling principles, backfilling material, and compaction efficiency were performed. This paper suggests guidelines by investigating and analyzing construction status. In conclusion, thrown backfilling material has a particle size distribution and permeability coefficient as major factors, and detailed standards of the factors are suggested. To improve the compaction efficiency, 90% or more, compaction by the floor should be in units of 0.3m while ensuring a lower drainage layer. When an H-shape stabilizing pile is pulled out after filling, additional hydraulic filling should be in the disturbance range.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

The Application of Operations Research to Librarianship : Some Research Directions (운영연구(OR)의 도서관응용 -그 몇가지 잠재적응용분야에 대하여-)

  • Choi Sung Jin
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.4
    • /
    • pp.43-71
    • /
    • 1975
  • Operations research has developed rapidly since its origins in World War II. Practitioners of O. R. have contributed to almost every aspect of government and business. More recently, a number of operations researchers have turned their attention to library and information systems, and the author believes that significant research has resulted. It is the purpose of this essay to introduce the library audience to some of these accomplishments, to present some of the author's hypotheses on the subject of library management to which he belives O. R. has great potential, and to suggest some future research directions. Some problem areas in librianship where O. R. may play a part have been discussed and are summarized below. (1) Library location. It is usually necessary to make balance between accessibility and cost In location problems. Many mathematical methods are available for identifying the optimal locations once the balance between these two criteria has been decided. The major difficulties lie in relating cost to size and in taking future change into account when discriminating possible solutions. (2) Planning new facilities. Standard approaches to using mathematical models for simple investment decisions are well established. If the problem is one of choosing the most economical way of achieving a certain objective, one may compare th althenatives by using one of the discounted cash flow techniques. In other situations it may be necessary to use of cost-benefit approach. (3) Allocating library resources. In order to allocate the resources to best advantage the librarian needs to know how the effectiveness of the services he offers depends on the way he puts his resources. The O. R. approach to the problems is to construct a model representing effectiveness as a mathematical function of levels of different inputs(e.g., numbers of people in different jobs, acquisitions of different types, physical resources). (4) Long term planning. Resource allocation problems are generally concerned with up to one and a half years ahead. The longer term certainly offers both greater freedom of action and greater uncertainty. Thus it is difficult to generalize about long term planning problems. In other fields, however, O. R. has made a significant contribution to long range planning and it is likely to have one to make in librarianship as well. (5) Public relations. It is generally accepted that actual and potential users are too ignorant both of the range of library services provided and of how to make use of them. How should services be brought to the attention of potential users? The answer seems to lie in obtaining empirical evidence by controlled experiments in which a group of libraries participated. (6) Acquisition policy. In comparing alternative policies for acquisition of materials one needs to know the implications of each service which depends on the stock. Second is the relative importance to be ascribed to each service for each class of user. By reducing the level of the first, formal models will allow the librarian to concentrate his attention upon the value judgements which will be necessary for the second. (7) Loan policy. The approach to choosing between loan policies is much the same as the previous approach. (8) Manpower planning. For large library systems one should consider constructing models which will permit the skills necessary in the future with predictions of the skills that will be available, so as to allow informed decisions. (9) Management information system for libraries. A great deal of data can be available in libraries as a by-product of all recording activities. It is particularly tempting when procedures are computerized to make summary statistics available as a management information system. The values of information to particular decisions that may have to be taken future is best assessed in terms of a model of the relevant problem. (10) Management gaming. One of the most common uses of a management game is as a means of developing staff's to take decisions. The value of such exercises depends upon the validity of the computerized model. If the model were sufficiently simple to take the form of a mathematical equation, decision-makers would probably able to learn adequately from a graph. More complex situations require simulation models. (11) Diagnostics tools. Libraries are sufficiently complex systems that it would be useful to have available simple means of telling whether performance could be regarded as satisfactory which, if it could not, would also provide pointers to what was wrong. (12) Data banks. It would appear to be worth considering establishing a bank for certain types of data. It certain items on questionnaires were to take a standard form, a greater pool of data would de available for various analysis. (13) Effectiveness measures. The meaning of a library performance measure is not readily interpreted. Each measure must itself be assessed in relation to the corresponding measures for earlier periods of time and a standard measure that may be a corresponding measure in another library, the 'norm', the 'best practice', or user expectations.

  • PDF

A Study on Development of Guideline on Writing Technical Document for Electrical Medical Devices: Dental X-ray Equipment (치과용엑스선장치의 기술문서 작성을 위한 가이드라인 개발 연구)

  • Lee, Seung-Youl;Kim, Jae-Ryang;Lee, Jun-Ho;Park, Chang-Won
    • Journal of radiological science and technology
    • /
    • v.39 no.4
    • /
    • pp.651-660
    • /
    • 2016
  • Due to recent population aging, the number of check-up for senior citizens has increased steadily. According to this trend, the market size of dental X-ray equipment and the number of approval and review for these devices have simultaneously increased. The technical document of medical device is required for approval and review for medical device, and medical device companies needs to have work comprehension and expertise, as the document needs to include the overall contents such as performances, test criteria, etc.. Yet, since most of domestic manufacturers or importers of medical devices are small businesses, it is difficult for them to recruit professional manpower for approval of medical devices, and submission of inaccurate technical documents has increased. These problems lead to delay of the approval process and to difficulties in quick entering into the market. Especially, the Ministry of Food and Drug safety (MFDS) standards of a dental extra-oral X-ray equipment, a dental intra-oral X-ray equipment, an arm-type computed tomography, and a portable X-ray system have been recently enacted or not. this guideline of dental X-ray equipment adjusting revised standards was developed to help relative companies and reviewers. For this study, first, the methods to write technical document have been reviewed with revised international and domestic regulations and system. Second, the domestic and foreign market status of each item has been surveyed and analyzed. Third, the contents of technical documents already approved by MFDS have been analyzed to select the correct example, test items, criteria, and methods. Finally, the guideline has been developed based on international and domestic regulation, through close review of a consultative body composed of academic, industrial, research institute and government experts.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.