Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

A Study on the Improvement of Amending Process and Depreciation Measurement Method of the Standard Estimating System (건설공사 표준품셈 제.개정 프로세스 개선 및 손율산정방안에 관한 연구)

  • Ahn, Ji-Sung;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.481-486
    • /
    • 2008
  • Standard Estimating System, which can be used for estimating a construction cost, has been pointed out having some problems such as non-reflecting a variety of construction environments and site conditions, non-adapting new technologies and methods since it was established in 1970. For solving these problems, the Korean Institute of Construction Technology(KICT) has chosen organizations for amending Standard Estimating System. However they have had many mistakes in the process of amending works because of non-establishing amending process and absence of the depreciation measurement method. This research derived the necessity to improve the amending process of the Standard Estimating System, and presented the detailed amending process and the performing method in the each process. Furthermore, this research proposed the depreciation measurement method available for the construction industry by means of analyzing researches that performed in the manufacturing industry and the measurement method for depreciation of general accounts.

  • PDF

A Study on the Analysis of the Cost-Effectiveness for the New Generation Multiple Launcher Rocket System Using AHP & Parametric Estimating (AHP & 모수추정법을 이용한 차기 다련장로켓의 비용대 효과분석)

  • Cho, Ki-Hong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.1
    • /
    • pp.84-90
    • /
    • 2010
  • Korean army currently considers the development of the new generation MLRS(Multiple Launcher Rocket System) as a new alternative, which responses on the renovation of the artillery and future battlefield environment. This study suggests that it presents cost-effectiveness of MLRS based on the Analytic Hierarchy Process and Parametric Estimating(PRICE H). According to this study, the cost-effectiveness of new generation MLRS presented that alternative A is 2.30 times and alternative B is 1.70 times, which are better than currently operating M270A1. Therefore, The best acquisition is alternative A that launcher is carried on currently operating 10ton standard truck but final acquisition alternative should be politically decided to consider viability of operator, performance and the latest of equipment.

A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects (공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구)

  • You, Yong-Hwan;Lee, Kyoo-Hyun;Kim, Chong-Woen;Choi, In-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

Reliability Prediction using Telcordia SR-332 in Electric Home Appliance (Telcordia SR-332를 이용한 가전제품 신뢰도 예측)

  • Lee Duck-Kyu
    • Journal of Applied Reliability
    • /
    • v.5 no.4
    • /
    • pp.427-438
    • /
    • 2005
  • This paper is concerned with the problem in predicting the reliability of an LCD product, Product reliability calculation methods classify accelerated life test (ALT) and using the reliability standard as MIL-HDBK-217F and Telcordia SR-332. The reliability standard can calculate estimating value more quickly than accelerated life test. The system MTBF was calculated in accordance of Telcordia SR-332 standard which includes directions of part electronic measurement, temperature rise and environmental test data. This research is intended to obtain the useful information for each electric design step to save time and cost.

  • PDF

Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction (시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

Estimating the Optimal Ratio of Standard Pallet Use for Logistics Standardization

  • Hong, Sung-Wook;Lee, Soon-Cheul
    • Journal of Korea Port Economic Association
    • /
    • v.22 no.1
    • /
    • pp.1-15
    • /
    • 2006
  • This paper analyzes how levels of logistics standardization are related to logistics costs. The study surveyed ratios of standard pallet use in order to measure levels of firms' standardization in logistics management. Research focused on how firms' logistics costs were related to their levels of logistics standardization and ratios of standard pallet use. After measuring use of standard pallets and logistics costs, optimal levels of logistics standardization were estimated based on survey data. Logistics costs and standardization were more related to labor than to freight volume or export. Results indicated that firms could reduce logistics costs by raising levels of logistics standardization; optimal levels of standard pallet use out of Korean firms' total manufacturing cargo volume were estimated at 44.26% for multi-standard pallets and 57.99% for a single standard pallet (a unit load system). The study demonstrated that adopting a single standard pallet results in better cost saving logistics systems than use of multi-standard pallet types. These results may explain why firms pursue standardization in logistics systems.