• Title/Summary/Keyword: Standard Cost

Search Result 2,261, Processing Time 0.029 seconds

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

The Effect on Logistics Cost of Incompatible Packaging Sizes in T-11 and T-12 pallet systems (T-11형 및 T-12형 파렛트 간 공용포장규격 미적용으로 인해 물류비에 미칠 수 있는 영향)

  • Jung, Sung-Tae;Yoon, Nam-Soo
    • Journal of Distribution Science
    • /
    • v.11 no.8
    • /
    • pp.15-23
    • /
    • 2013
  • Purpose - This is a case study aimed at finding a solution for improving the pallet loading efficiency in the process of delivering products through a transshipment using the T-11 and T-12 pallet systems. The study proposes a solution by demonstrating the case of a certain manufacturer A, who aims to reduce the logistics cost by using packaging sizes that are commonly applicable and can improve the compatibility between the T-11 pallet system, designated as the standard pallet in Korea, and the T-12 pallet system, which is commonly used in other foreign countries. The use of common sizes increases compatibility among the two systems and reduces both logistics and environmental costs. Thus, this case study calculates the quantitative benefits of applying common packaging sizes to improve the compatibility between the T-11 and T-12 pallet systems. These systems are considered to be the most important and widely used transportation systems in the global logistics industry. Research design, data, and methodology - This study examined manufacturer A's representative product and delivery system and assessed how manufacturer A was affected by the use of incompatible packaging sizes in the T-11 (1100 mm×1100 mm) and T-12 (1200mm×1000 mm) pallet systems, which were specified in the KS T 1002 standard. In addition, this study analyzed the impact of these packaging sizes on A's logistics cost. The TOPS program (Total Packaging System) was used to simulate pallet loading efficiency,and the main parameter studied was volume, as calculated from length, width, and height. Results - When the sizes of secondary packaging were not compatible across the T-11 and T-12 pallet systems, a reduction in loading efficiency was observed, leading to an increase in logistics cost during transshipment. Such low loading efficiencies led to a further loss of efficiency in transportation, storage and unloading. This may have a possible environmental impact with high social expenses, such as increased CO2 emissions. Hence, this study proposed that the KS T 1002 standard be amended to include 21 packaging sizes, including 7 sizes of the 600 mm×500 mm category, which are compatible with both the T-11 and T-12 pallet systems. Conclusions - This study found that the 69 standard sizes under the T-11 pallet system and the 40 standard sizes under the T-12 system in the KS T 1002 standard can be simplified and reduced to 21 mutually compatible packaging sizes, enabling logistics standardization and reducing national-level logistics costs. If the government pays attention to this study and considers the standardization of common sizes for the T-11 and T-12 pallet systems and amends the KS T 1002 standard, this study will deliver practical value to the global logistics industry, apart from being of academic significance.

Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok) (신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계)

  • Jung, Young-Soo;Kim, Woo-Joong;Ha, Ji-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.4
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.

A Study on the Design/construction Standard of Unlined Tunneling Method (Unlined Tunnel 공법 지보재의 설계 및 시공 기준 고찰)

  • 서영화;김성구;나승훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.121-134
    • /
    • 2002
  • Tunneling is a very dangerous and expansive work. Especially, the concrete lining works need many long hours and much cost. As an alternative, the unlined tunneling methods including NMT have been developed in various country. These methods have advantages in cost, time and quality. In Korea, many considerations have been conducted to apply the unlined tunneling method in comparatively good rock. Since primary reinforcements play the role of the final supporting system in unlined tunnels, the initial stiffness and long term durability of reinforcements are very important for tunnel safety. To establish the reinforcements standard suitable to Korea, we investigated the foreign standards and construction cases, comparing geological and construction conditions of foreign land and Korea. As the result, we have proposed the standard of primary supporting system for unlined tunnel in aspects of material, design, construction and quality control etc.

  • PDF

A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works (콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

Development of a Cost Index for Site Developing Project (단지조성공사용 공사비 지수의 개발)

  • Bae Keon;Lee Tai-Sik;Park Jong-Hyun;Lee Won-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.423-426
    • /
    • 2002
  • The foundation for developing a cost estimation system based on historical data has been being prepared in Korea. Historical data is a priori of developing a cost estimation model. Cost Index, one of the historical data, is used to estimate construction cost and to adjust the amount of contract money in the foreign country, whereas it is not used in domestic except for the road construction project in Korea. Construction cost indices can be used by an estimator in tender analysis, pricing, price adjustment, cost planning, and forecasting. In this regards, this paper identified the problems in developing Cost Index evaluation process by comparing the standard of framing Cost Index used in British to the one used in Korea. Then, the scheme for improving a Cost Index required for Site Developing Construction was proposed. Twenty-two cases of engineering estimate data were used to compare the domestic standard to the foreign one in deriving a Cost Index.

  • PDF

A Study on the design of hospital budget variance analysis model reflecting efficiency and an attainable target cost (효율성과 목표원가를 반영한 병원예산 원가차이 분석 모형 설계)

  • O, Dongil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.696-706
    • /
    • 2013
  • This study aims to develop DEA model which can look into budget cost variance analysis tool based on standard cost using 68 hospital's input and output data. For accomplishing this purpose, by introducing new DEA model which can get an attainable target cost, we can decompose an actual cost difference into several meaningful sub variances. Also based on the 2008 general hospital data, this model can make variance analysis between actual cost and target cost. Total variance can be divided into technical inefficiency variance, price inefficiency variance, allocation inefficiency variance. This study introduces that by using target budget cost concept, traditional actual cost variance can be divided into a technical variance, price variance, budget variance. Finally, we can get result which confirms there does not exist favorable size effects on efficiency and cost management in running a general hospital.

Optimum Safety Indices Based On Expected Total Cost Minimization (총기대비용 최소화원칙에 의한 최적신뢰성지수)

  • 이증빈;신형우;장석모
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1993.10a
    • /
    • pp.216-223
    • /
    • 1993
  • The safety factors of current standard code are considered to be not appropriate compared to design and construction practices, even this safety factors are not determined from probabilistic study but merely from experiences and practices. This study pripose the optimum safety indices based on expected total cost minimization using only three parameters, which are the level of the failure cost to the initial cost by improvement in safety, and the order of the initial cost function.

  • PDF