• Title/Summary/Keyword: Staged construction procedures

Search Result 2, Processing Time 0.017 seconds

A Study on the Effect of Facing System and Staged Construction Procedures in GRS Walls for Application in Railroad Structures (철도구조물 적용을 위한 보강토옹벽 벽체시스템과 단계시공의 효과에 관한 연구)

  • Won, Myoung-Soo;Kwon, Oh-Hyun;Kim, Young-Shin;Bang, Yoon-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.359-366
    • /
    • 2009
  • The present paper analyzes and discusses the effect of facing system and staged construction in GRS (geosynethetic reinforced soil) walls for railway structures throughout various case analyses. The result shows that postconstruction facing system by staged construction procedures is more advantageous for railway structure construction than preconstruction and simultaneous construction facing system with reinforced soil.

  • PDF

A Study on the Advantage with Staged Construction Procedures and Full-Height Rigid Facing of Geosynthetic Reinforced Soil Retaining Walls (보강토옹벽에서 단계시공과 일체형 강성벽체의 이점에 관한 연구)

  • Won, Myoung-Soo;Kim, You-Seong;Tatsuoka, Fumio
    • Journal of the Korean Geosynthetics Society
    • /
    • v.6 no.3
    • /
    • pp.17-23
    • /
    • 2007
  • To construct an ideal geosynthetic reinforced soil retaining wall (GRS-RW), the facing of the wall should be flexible enough to accommodate a large deformation of the supporting ground and to develop the large tensile force in reinforcements during wall construction as long as the stability is ensured, but should be rigid enough to be stiff and stable as well as durable and aesthetically acceptable for a long life time when the wall is in service. Facing conditions during the construction and service of the wall are quite different. So it is difficult to be satisfied all these conditions with the current construction method which is mainly used in reinforced wall construction in Korea. Most of this contradiction could be solved by the staged construction procedure. According to the results of cases and references analyses, stage construction procedures make it possible to accommodate large deformation of the supporting ground and backfill without losing the stability of the wall, and to derive the tensile strength of reinforcement causing deformation of the facing. When the facing is a full-height rigid one, it also appeared almost impossible to occur a local shear failure of the active zone, and pull-out failure of reinforcements. Therefore, GRS-RWs having a full-height rigid facing have been constructed by the staged construction procedures that matched well with the theory of reinforced soil, which had outstanding stability and durability, and thus could be used for railways and bridge abutments in Korea in the future.

  • PDF