• Title/Summary/Keyword: Software Development Project Management

Search Result 255, Processing Time 0.025 seconds

Development of Pre-Service and In-Service Information Management System (iSIMS) (원전 가동전/중 검사정보관리 시스템 개발)

  • Yoo, H.J.;Choi, S.N.;Kim, H.N.;Kim, Y.H.;Yang, S.H.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.24 no.4
    • /
    • pp.390-395
    • /
    • 2004
  • The iSTMS is a web-based integrated information system supporting Pre-Service and In-Service Inspection(PSI/ISI) processes for the nuclear power plants of KHNP(Korea Hydro & Nuclear Power Co. Ltd.). The system provides a full spectrum coverage of the inspection processes from the planning stage to the final report of examination in accordance with applicable codes, standards, and regulatory requirements. The major functions of the system includes the inspection planning, examination, reporting, project control and status reporting, resource management as well as objects search and navigation. The system also provides two dimensional or three dimensional visualization interface to identify the location and geometry of components and weld areas subject to examination in collaboration with database applications. The iSIMS is implemented with commercial software packages such as database management system, 2-D and 3-D visualization tool, etc., which provide open, updated and verified foundations. This paper describes the key functions and the technologies for the implementation of the iSIMS.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

A Study on Development of Market Oriented MIS Curriculum (시장지향적 MIS 교육과정 개편을 위한 연구)

  • Lee, Ji-Myoun;Bock, Gee-Woo
    • Information Systems Review
    • /
    • v.10 no.3
    • /
    • pp.207-222
    • /
    • 2008
  • In recent business environment, we realize that MIS is taking important role in which it has been involved. However, we are having difficulty to find out the identity of MIS in business studies since MIS is derived from Micro Economics, Operations Research, Computer Science and so on. And there is no clear boundary in order to classify with other business area in consisting curriculums. Furthermore, IT staffs in the field are facing difficulties to utilize what they have learned MIS curriculums provided from business studies. In this research, we would like to present implications for development of market oriented MIS curriculums, which can be the actual needs of IT fields, through analysis of System Integration project for recent three years, analysis of IT capability based on the survey of IT consultants and analysis of application S/W technology trend in global vendor referred to "MIS Curriculum: The Current State of the Art and a Proposed Future Model (Lee et al, 2007)". As enterprise application software technology develop, the system integration can be achieved through special system solutions such as ERP, CRM, SCM, BI, etc. We also have acknowledged that solution consultants who have the ability of packaged S/W application are in demand since S/W vendors have become larger and more practical through M&A. Therefore, we have come to a conclusion regarding new direction of curriculum for increasing human power in IT industry which we demonstrated in detail through this research.

Development of Satisfaction Evaluation Items for Degree-linked High Skills Meister Courses using the Delphi Method (Delphi 기법을 활용한 학위연계형 고숙련마이스터 과정의 만족도 평가 문항 개발)

  • Kim, Seung-Hee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.5
    • /
    • pp.163-173
    • /
    • 2020
  • In this study, on-site corporate instructors participated as student-cum-workers in a degree-linked high skills Meister course to improve job competency and practical ability as proposed in the Work-Study Career Vision. Evaluation questions were then developed and their validity was verified by assessing satisfaction related to expected goals in enhancing advanced training guidance and competency as an evaluator. Satisfaction assessment was conducted based on training preparation, training implementation, training effectiveness and training administration. The Delphi Method was adopted and a total of 48 items were developed in 6 categories under 4 main areas. There were 7 evaluation items on the satisfaction of training course development under training preparation, 21 evaluation items related to the satisfaction of Off-JT and OJT courses under training implementation, 16 evaluation items related to the satisfaction of increased competency as an on-site corporate instructor and the satisfaction of enhanced practical skills and skills application at work under training effectiveness, as well as 6 evaluation items to assess satisfaction with administrative support under training administration. The final conformity assessment was conducted based on the stability, content validity ratio, consensus and convergence indicators of the developed items. Results of this study do not only apply to quality management of the high skills Meister course which is being promoted as a pilot project for work-study programs, but also serves as a rationale that may be considered as a basic research tool in the collection of various opinions to derive overall system improvement factors for the work-study high skills Meister course.

Connectivity Assessment Based on Circuit Theory for Suggestion of Ecological Corridor (생태축 제안을 위한 회로 이론 기초 연결성 평가)

  • Yoon, Eun-Joo;Kim, Eun-Young;Kim, Ji-Yeon;Lee, Dong Kun
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.3
    • /
    • pp.275-286
    • /
    • 2019
  • In order to prevent local extinction of organisms and to preserve biodiversity, it is important to ensure connectivity between habitats. Even if the habitat is exposed to various disturbance factors, it is possible to avoid or respond to disturbances if they are linked to other habitats. Habitat connectivity can be assessed from a variety of perspectives, but the importance of functional connectivity based on species movement has been emphasized in recent years due to the development of computational capabilities and related software. Among them, Circuitscape, which is a connectivity evaluation tool, has an advantage it can provide detailed reference data for the city planning because it maps ecological flows on individual grid based on circuit theory. Therefore, in this study, the functional connectivity of Suwon was evaluated by applying Circuitscape and then, the ecological corridor to be conserved and supplemented was suggested based on it. The results of this study are expected to effectively complement the methodology related ecological corridor/axis, which was previously provided only in the form of a diagram, and to be effective in management of development project and urban planning.