• Title/Summary/Keyword: Software Development Project Management

Search Result 255, Processing Time 0.026 seconds

A Study on the AtoN Operational Software Development for the AtoN Management and the Decision Support of its Placement Planning (항로표지 관리 및 배치 의사결정 지원을 위한 항로표지 운용 소프트웨어 개발에 관한 연구)

  • Kim, Ah-Young;Lee, Yeong-Ju;Park, Se-Kil;Oh, Jae-Yong;Kim, Yeon-Gyu
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.5
    • /
    • pp.543-551
    • /
    • 2014
  • This study has searched to find a program in order to manage simply and practically use the expelled AtoN database from the AtoN Simulator and to support the idea decision for the AtoN placement. It examines a program that manages AtoN database through the hierarchy structure, history card and endowment with condition same as a scenario. And accomplishes this study's goal owing to realizing AtoN operational software that helps for visual, hearing sense, fixed amount verification upon AtoN placement project. The AtoN operational software contributes not only flexible control like a newly establishment, relocation etc, but also supports idea decision for AtoN placement plan through many functions such as condition search, virtual sailing and fixed amount appraisal result exhibition, etc. Through utilization of this, it is to help upon the presupposition of the impact to ship or sailor about many designs and in addition, upon the judgment of whether or not for the efficiency and appropriation of the design. It is expected to reduce possible failure costs and management costs due to AtoN design and placement plans, because to compare more various designs thru the easier verification method.

Factors Affecting the Implementation Success of Data Warehousing Systems (데이터 웨어하우징의 구현성공과 시스템성공 결정요인)

  • Kim, Byeong-Gon;Park, Sun-Chang;Kim, Jong-Ok
    • Proceedings of the Korea Society of Information Technology Applications Conference
    • /
    • 2007.05a
    • /
    • pp.234-245
    • /
    • 2007
  • The empirical studies on the implementation of data warehousing systems (DWS) are lacking while there exist a number of studies on the implementation of IS. This study intends to examine the factors affecting the implementation success of DWS. The study adopts the empirical analysis of the sample of 112 responses from DWS practitioners. The study results suggest several implications for researchers and practitioners. First, when the support from top management becomes great, the implementation success of DWS in organizational aspects is more likely. When the support from top management exists, users are more likely to be encouraged to use DWS, and organizational resistance to use DWS is well coped with increasing the possibility of implementation success of DWS. The support of resource increases the implementation success of DWS in project aspects while it is not significantly related to the implementation success of DWS in organizational aspects. The support of funds, human resources, and other efforts enhances the possibility of successful implementation of project; the project does not exceed the time and resource budgets and meet the functional requirements. The effect of resource support, however, is not significantly related to the organizational success. The user involvement in systems implementation affects the implementation success of DWS in organizational and project aspects. The success of DWS implementation is significantly related to the users' commitment to the project and the proactive involvement in the implementation tasks. users' task. The observation of the behaviors of competitors which possibly increases data quality does not affect the implementation success of DWS. This indicates that the quality of data such as data consistency and accuracy is not ensured through the understanding of the behaviors of competitors, and this does not affect the data integration and the successful implementation of DWS projects. The prototyping for the DWS implementation positively affects the implementation success of DWS. This indicates that the extent of understanding requirements and the communication among project members increases the implementation success of DWS. Developing the prototypes for DWS ensures the acquirement of accurate or integrated data, the flexible processing of data, and the adaptation into new organizational conditions. The extent of consulting activities in DWS projects increases the implementation success of DWS in project aspects. The continuous support for consulting activities and technology transfer enhances the adherence to the project schedule preventing the exceeding use of project budget and ensuring the implementation of intended system functions; this ultimately leads to the successful implementation of DWS projects. The research hypothesis that the capability of project teams affects the implementation success of DWS is rejected. The technical ability of team members and human relationship skills themselves do not affect the successful implementation of DWS projects. The quality of the system which provided data to DWS affects the implementation success of DWS in technical aspects. The standardization of data definition and the commitment to the technical standard increase the possibility of overcoming the technical problems of DWS. Further, the development technology of DWS affects the implementation success of DWS. The hardware, software, implementation methodology, and implementation tools contribute to effective integration and classification of data in various forms. In addition, the implementation success of DWS in organizational and project aspects increases the data quality and system quality of DWS while the implementation success of DWS in technical aspects does not affect the data quality and system quality of DWS. The data and systems quality increases the effective processing of individual tasks, and reduces the decision making times and efforts enhancing the perceived benefits of DWS.

  • PDF

Design of Project Schedule Management Tool Based on Source Code for Checking Software Development Progress (소프트웨어 개발 진척도 확인을 위한 소스코드 기반의 프로젝트 일정 관리 도구 설계)

  • Hwang, Bueng Il;Lee, Sunghee;Lee, Woo Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2016.04a
    • /
    • pp.529-532
    • /
    • 2016
  • IT 융 복합 산업에서 소프트웨어가 차지하는 비중이 높아짐에 따라 프로젝트 관리는 점차 중요해지고 IT기업의 경쟁력을 결정하는 중요 요소가 되고 있다. 프로젝트 관리 중 일정 관리는 가장 기초적이고 관리적 요소가 가장 많이 들어있으며 일정 관리의 실패는 Time-To-Market을 맞추지 못한다. 일정 관리를 위해 고려해야할 문제점들은 겉으로 확인되는 진척율과 실제로 개발된 진척율의 차이, 팀원의 낭비되는 시간을 지속적 관리 등이 있음에도 현장에서는 도구 또는 파일을 통해 진행 사항을 관리하지만 세부 작업별 활동까지 연계가 되지 않아 일정 관리의 진행 상황이 명확히 드러나지 않는다. 따라서 본 논문에서는 소스코드 기반의 실시간 프로젝트 일정 관리 도구를 제안한다. 프로젝트 계획 단계에서 작업을 컴포넌트 별로 세분화되어 있을 때 이 도구를 사용하여 컴포넌트 내부 메서드의 소스코드 작성을 통해 소프트웨어 개발 진척도를 명확하게 파악하고 해당 소스 코드의 테스트를 통해 의도대로 개발이 이루어졌는지를 확인 가능하다. 그리고 피드백을 통해 개발자에게 개발 일정 및 계획 수정에 대한 알림으로 지연되는 시간 없이 수정 가능하다.

A Study for Defense Acquisition System Improvement (국방무기체계 획득절차 발전방향 - 미국 국방획득절차 개선노력을 중심으로 -)

  • Go, Sim-Jae
    • Journal of the military operations research society of Korea
    • /
    • v.31 no.2
    • /
    • pp.86-104
    • /
    • 2005
  • During the 'Cold War', DoD had focused on the high performance and timely acquisition which enabled quick field out the superior weapons than the enemy regardless of acquisition cost. But, after the cold war, the focus has been changed to the 'cost effective acquisition' of weapon systems because of tremendous investment cost & economic theory. The U.S. DoD has been tried to make 'the most effective acquisition system'(AR, Acquisition Reform) from mid-80's with their enough experienced program data, and as a result, they had launched the new acquisition procedure - DoD 5000 series - in 1996. DoD is continuously doing the study and making several improvements on the procedure after it had been once announced. On Oct 30. 2002, DoD noticed that they cancelled the DoD 5000 series documents(5000.1, 5000.2, 5000.2-R) and 5000.2-R will be reissued as a guide. The most recent version which focused on 1) evolutionary acquisition and spiral development, 2) procedure for future technology systems including software and IT, 3) supplement on the area of efficiency, flexibility, creativity and innovation of old system was issued by May 12. 2003. This article suggests a 'good idea' based on the reviewing of these DoD efforts for our defense acquisition regulation and procedure to go. It includes the CAIV concept application, IPT utilization, T&E method, cost or price based contract etc-all for the effective acquisition.

A Technique to Recommend Appropriate Developers for Reported Bugs Based on Term Similarity and Bug Resolution History (개발자 별 버그 해결 유형을 고려한 자동적 개발자 추천 접근법)

  • Park, Seong Hun;Kim, Jung Il;Lee, Eun Joo
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.12
    • /
    • pp.511-522
    • /
    • 2014
  • During the development of the software, a variety of bugs are reported. Several bug tracking systems, such as, Bugzilla, MantisBT, Trac, JIRA, are used to deal with reported bug information in many open source development projects. Bug reports in bug tracking system would be triaged to manage bugs and determine developer who is responsible for resolving the bug report. As the size of the software is increasingly growing and bug reports tend to be duplicated, bug triage becomes more and more complex and difficult. In this paper, we present an approach to assign bug reports to appropriate developers, which is a main part of bug triage task. At first, words which have been included the resolved bug reports are classified according to each developer. Second, words in newly bug reports are selected. After first and second steps, vectors whose items are the selected words are generated. At the third step, TF-IDF(Term frequency - Inverse document frequency) of the each selected words are computed, which is the weight value of each vector item. Finally, the developers are recommended based on the similarity between the developer's word vector and the vector of new bug report. We conducted an experiment on Eclipse JDT and CDT project to show the applicability of the proposed approach. We also compared the proposed approach with an existing study which is based on machine learning. The experimental results show that the proposed approach is superior to existing method.

A Study on Development of BIM-based Engineering Management System for Temporary Work (BIM기반 가설공사 업무지원시스템 개발에 관한 연구)

  • Choi, Changhoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • As the amount of information generated in the construction project increases exponentially, design and construction review have a serious impact on the success of the site. For this reason, academic and business circles have been expanding the use of BIM at the whole life, and BIM is now accepted as one of the standards used in the construction industry. However, the BIM-based design for the temporary work is used as an aid to the 2D design because there is no specialized software and there is absolutely lack of a professional engineer. The objective of this research is to develop BIM-based temporary work support system. This system minimizes human errors in BIM-based design, quantity takeoff and inspection and shortens working hours.

A Study on a Basic Model for GIS Audit, Based on Various Types of GIS Projects (GIS 사업유형을 고려한 GIS 감리의 기반 모델 연구)

  • Koh, Kwang-Chul;Kim, Eun-Hyung
    • Journal of Korea Spatial Information System Society
    • /
    • v.2 no.2 s.4
    • /
    • pp.5-23
    • /
    • 2000
  • Since 1995, national and local governments have competitively initiated many and large GIS projects and audit for the projects becomes an important issue. So far, the audit in the Information Technology(IT) area has tried to deal with the issue but ineffectiveness has been found for the successful GIS project management. Effective auditing is a critical element for the project management. In order to establish a proper audit model for the GIS projects and to promote auditing activities in the projects, this study constructs two hypotheses and tries to prove them. The hypotheses are as follows : 1) For a good audits model for GIS, unique characteristics of a GIS project audit items and the scope of the audit need to be identified. 2) The scope of audit needs to be classified according to the requests from tasks in the projects. To prove the hypotheses, this study analyzes positive aspects of audit in IT and construction projects, clarifies the audit items in GIS projects by comparing with them, and classifies the scope of the GIS audit based on various types of GIS projects. As a results, 5 types of the GIS audit are identified : (1) audit for project management, (2) audit focused on IT, (3) audit characterized by GIS technologies, (4) GIS database audit and (5) consulting services for critical problems in the projects. In addition, 4 criteria in classifying the GIS projects are suggested for the GIS audit. The 4 criteria are domain, scope, duration, and GIS applications technologies. Especially, GIS technology considered in this study includes GIS software, methodologies for GIS development, GIS database and quality control of GIS data, which are not usually reflected in the existing studies about in GIS audit. Because the GIS audit depends on a type of GIS projects, scopes of the audit can be flexibly reconstructed in accordance with the types of GIS projects. This is a key to effective and realistic audit for the future GIS projects. Strategies for effective GIS audit are also proposed in terms of the following: GIS project management, goal establishment in each audit stage, documentation from GIS audit, timing strategies for intensive GIS audit, and designing team structure.

  • PDF

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.

A study on development of educational contents about combining computational thinking with design thinking (창의·컴퓨팅사고 교육내용 기본 설계 연구)

  • Oh, Kyung-Sun;Suh, Eung-Kyo;Chung, Haejin
    • Journal of Digital Convergence
    • /
    • v.16 no.5
    • /
    • pp.65-73
    • /
    • 2018
  • The objective of this study is to suggest the contents of education for software for Undergraduates who are not majoring in IT to cultivate creative and convergent people to prepare for the 4th Industrial Revolution. In the background, this study investigated the relationship between design thinking and computing thinking factors and examined the direction of software education to develop creative problem solving abilities. Two specialist questionnaires and focus group interviews were used to derive two levels of content elements for design thinking based computing thinking. According to the results of the analysis, This research is based on the process of design thinking, focusing on diffuse thinking at the first level, and the whole contents are composed. The process of producing a prototype was used to derive the computational thinking contents necessary for problem solving. This study focuses on convergent thinking at the second level and draws out the contents of computing thought to embody the first level contents of various ideas and stories into computing. It is expected that this study will be used as basic data to develop the content and method of education as SW education for non - major subject in university.

Development of Mongolian Numerical Weather Prediction System (MNWPS) Based on Cluster System (클러스터 기반의 몽골기상청 수치예보시스템 개발)

  • Lee, Yong Hee;Chang, Dong-Eon;Cho, Chun-Ho;Ahn, Kwang-Deuk;Chung, Hyo-Sang;Gomboluudev, P.
    • Atmosphere
    • /
    • v.15 no.1
    • /
    • pp.35-46
    • /
    • 2005
  • Today, the outreach of National Meteorological Service such as PC cluster based Numerical Weather Prediction (NWP) technique is vigorous in the world wide. In this regard, WMO (World Meteorological Organization) asked KMA (Korea Meteorological Administration) to formulate a regional project, which cover most of RA II members, using similar technical system with KMA's. In that sense, Meteorological Research Institute (METRI) in KMA developed Mongolian NWP System (MNWPS) based on PC cluster and transferred the technology to Weather Service Center in Mongolia. The hybrid parallel algorithm and channel bonding technique were adopted to cut cost and showed 41% faster performance than single MPI (Message Passing Interface) approach. The cluster technique of Beowulf type was also adopted for convenient management and saving resources. The Linux based free operating system provide very cost effective solution for operating multi-nodes. Additionally, the GNU software provide many tools, utilities and applications for construction and management of a cluster. A flash flood event happened in Mongolia (2 September 2003) was selected for test run, and MNWPS successfully simulated the event with initial and boundary condition from Global Data Assimilation and Prediction System (GDAPS) of KMA. Now, the cluster based NWP System in Mongolia has been operated for local prediction around the region and provided various auxiliary charts.