A Study on Development Cost Attributes Analysis of NHPP Software Reliability Model Based on Rayleigh Distribution and Inverse Rayleigh Distribution (레일리 분포와 역-레일리 분포에 근거한 NHPP 소프트웨어 신뢰성 모형의 개발비용 속성 분석에 관한 연구)

  • Yang, Tae-Jin
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.12 no.6
    • /
    • pp.554-560
    • /
    • 2019
  • In this study, after applying the finite failure NHPP Rayleigh distribution model and NHPP Inverse Rayleigh distribution model which are widely used in the field of software reliability to the software development cost model, the attributes of development cost and optimal release time were compared and analyzed. To analyze the attributes of software development cost, software failure time data was used, parametric estimation was applied to the maximum likelihood estimation method, and nonlinear equations were calculated using the bisection method. As a result, it was confirmed that Rayleigh model is relatively superior to Inverse Rayleigh model because software development cost is relatively low and software release time is also fast. Through this study, the development cost attributes of the Rayleigh model and the Inverse Rayleigh model without the existing research examples were newly analyzed. In addition, we expect that software developers will be able to use this study as a basic guideline for exploring software reliability improvement method and development cost attributes.

The Optimal Release Time in Cost Model Using PCLS Model

  • Song, Kwang Yoon;Chang, In Hong;Choi, Min Su;Lee, Da Hye
    • Journal of Integrative Natural Science
    • /
    • v.9 no.3
    • /
    • pp.206-214
    • /
    • 2016
  • The basic goal of software development is to produce high quality software at low cost. Therefore, when to stop software testing and release the software product is a significant point in the software development. The software cost model is an effective tool used to help software developers control costs and determine the release time. In this paper, we discuss the cost model to apply all 6 models with consideration of time to remove errors, cost of removing each error and risk cost due to software failure. We show the impact of cost coefficients and parameter values on the expected total cost by changing the values and comparing the optimal release times.

Improving the Application Type and Quality/Characteristics Adjustment Factors of the Korea Software Cost Estimation Standard (소프트웨어 개발비 기준의 애플리케이션 유형과 품질 및 특성 보정요소 개선)

  • Park, Chan-Kyoo;Kim, Woo-Je;Seo, Yong-Won
    • Journal of Information Technology Services
    • /
    • v.8 no.2
    • /
    • pp.43-70
    • /
    • 2009
  • As software development and maintenance cost increase quickly, information systems managers are more concerned about how to effectively manage software cost. To estimate the software development cost, most public institutes of Korea use the software cost estimation standard established by the government. Unfortunately, the accuracy of the estimation derived from the standard has not been satisfactory in spite of repetitive modifications made to improve it. One of the major reasons for the inaccuracy is that the standard has too small a number of cost adjustment factors to reflect the various characteristics of a software development project. To remedy this problem, we propose new cost adjustment factors which can be incorporated into the standard and are important to enhance the estimation accuracy, based on the analysis of several well-known software estimation models. Furthermore, by applying the proposed model to real world software projects, we show that the proposed model can produce more accurate estimates than the current standard.

The Comparative Software Development Cost Model Considering the Change in the Shape Parameter of the Erlang Distribution (어랑분포의 형상모수 변화에 따른 소프트웨어 개발 비용모형에 관한 비교 연구)

  • Yang, Tae-Jin
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.9 no.6
    • /
    • pp.566-572
    • /
    • 2016
  • Software Reliability implemented in software development is one of the most important issues. In finite failure NHPP software reliability models for software failure analysis, the hazard function that means a failure rate may have constant independently for failure time, non-increasing or non-decreasing pattern. In this study, software development cost analysis considering the variable shape parameter of Erlang distribution as the failure life distribution in the software product testing process was studied. The software failure model was applied finite failure Non-Homogeneous Poisson Procedure and the parameters approximation using maximum likelihood estimation was accompanied. Thus, this paper was presented comparative analysis by applying a software failure time data to the software, considering the shape parameter of Erlang distribution for development cost model analysis. When compared to the cost curve in accordance with the shape parameter, the model of smaller shape can be seen that the optimal software release time delay and more cost. Through this study, it is thought that it can serve as a preliminary information which can basically help the software developers to search for development cost according to software shape parameters.

A characteristic study on the software development cost model based on the lifetime distribution following the shape parameter of Type-2 Gumbel and Erlang distribution (Type-2 Gumbel과 Erlang 분포의 형상모수를 따르는 수명분포에 근거한 소프트웨어 개발 비용모형에 관한 특성 연구)

  • Yang, Tae-Jin
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.4
    • /
    • pp.460-466
    • /
    • 2018
  • With the development of information technology, the scale of computer software system is constantly expanding. Reliability and cost of software development have a great impact on software quality. In this study, based on the software failure interval time data, a comparative analysis was performed on the characteristics of the software development cost model based on the lifetime distribution following the Type-2 Gumbel and Erlang distribution in the NHPP model. As a result, the trends of the cost curves for the Go-Okumoto model and the proposed Erlang model and the Type-2 Gumble model both decreased in the initial stage and gradually increased in the latter half of the failure time. Also, Comparing the Erlang model with the Type-2 Gumble model, we found that the Erlang model is faster and more cost-effective at launch. Through this study, Software operators should remove possible defects from the testing phase rather than the operational phase to reduce defects after the software release date, it is expected to be able to study the prior information needed to understand the characteristic of software development cost.

A Fuzzy Logic Based Software Development Cost Estimation Model with improved Accuracy

  • Shrabani Mallick;Dharmender Singh Kushwaha
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.6
    • /
    • pp.17-22
    • /
    • 2024
  • Software cost and schedule estimation is usually based on the estimated size of the software. Advanced estimation techniques also make use of the diverse factors viz, nature of the project, staff skills available, time constraints, performance constraints, technology required and so on. Usually, estimation is based on an estimation model prepared with the help of experienced project managers. Estimation of software cost is predominantly a crucial activity as it incurs huge economic and strategic investment. However accurate estimation still remains a challenge as the algorithmic models used for Software Project planning and Estimation doesn't address the true dynamic nature of Software Development. This paper presents an efficient approach using the contemporary Constructive Cost Model (COCOMO) augmented with the desirable feature of fuzzy logic to address the uncertainty and flexibility associated with the cost drivers (Effort Multiplier Factor). The approach has been validated and interpreted by project experts and shows convincing results as compared to simple algorithmic models.

Estimating Software Development Cost using Support Vector Regression (Support Vector Regression을 이용한 소프트웨어 개발비 예측)

  • Park, Chan-Kyoo
    • Korean Management Science Review
    • /
    • v.23 no.2
    • /
    • pp.75-91
    • /
    • 2006
  • The purpose of this paper is to propose a new software development cost estimation method using SVR(Support Vector Regression) SVR, one of machine learning techniques, has been attracting much attention for its theoretic clearness and food performance over other machine learning techniques. This paper may be the first study in which SVR is applied to the field of software cost estimation. To derive the new method, we analyze historical cost data including both well-known overseas and domestic software projects, and define cost drivers affecting software cost. Then, the SVR model is trained using the historical data and its estimation accuracy is compared with that of the linear regression model. Experimental results show that the SVR model produces more accurate prediction than the linear regression model.

정보시스템의 비용 평가 모형

  • 권영직
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.2 no.1
    • /
    • pp.177-201
    • /
    • 1997
  • In this paper, a model of cost evaluatino for computer software development is proposed . This model is designed to cope with various development environment since the development cost is directly dependent on the development environments. The model that satisfies the users request is turned out to be a function point model. For the future research , a model that contain new technique and new development environment and an imaginative model are desired . Also, in order to effective cost estimation a systematic research on structure of software development , establishment of standard development methodology, project management and technique are desired.

Comparative Evaluation on the Cost Analysis of Software Development Model Based on Weibull Lifetime Distribution (와이블 수명분포에 근거한 소프트웨어 개발모형의 비용 분석에 관한 비교 평가)

  • Bae, Hyo-Jeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.3
    • /
    • pp.193-200
    • /
    • 2022
  • In this study, the finite-failure NHPP software reliability model was applied to the software development model based on the Weibull lifetime distribution (Goel-Okumoto, Rayleigh, Type-2 Gumbe), which is widely used in the software reliability field, and then the cost attributes were compared and evaluated. For this study, failure time data detected during normal operation of the software system were collected and used, the most-likelihood estimation (MLE) method was applied to the parameter estimation of the proposed model, and the calculation of the nonlinear equation was solved using the binary method. As a result, first, in the software development model, when the cost of testing per unit time and the cost of removing a single defect increased, the cost increased but the release time did not change, and when the cost of repairing failures detected during normal system operation increased, the cost increased and the release time was also delayed. Second, as a result of comprehensive comparative analysis of the proposed models, it was found that the Type-2 Gumble model was the most efficient model because the development cost was lower and the release time point was relatively faster than the Rayleigh model and the Goel-Okumoto basic model. Third, through this study, the development cost properties of the Weibull distribution model were newly evaluated, and the analyzed data is expected to be utilized as design data that enables software developers to explore the attributes of development cost and release time.

A Study on the Estimation of Software Development Cost of IT Projects in Public Sector (공공부문 정보화사업의 소프트웨어 개발비용 예측에 관한 연구)

  • 박찬규;구자환;김성희;신수정;송병선
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.191-204
    • /
    • 2002
  • As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.