• Title/Summary/Keyword: Software Development Cost

Search Result 758, Processing Time 0.026 seconds

A Study on Development of the Software for Measurement of Safety Cost in Manufacture Industry (제조업의 재해 손실 비용 산정을 위한 소프트웨어 개발에 관한 연구)

  • 권희봉;조수원;이창호
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.1
    • /
    • pp.1-10
    • /
    • 2001
  • The existent system of management for Measurement of Safety Cost are not effective because of the data loss and time loss and occurrence of errors through manual calculation. Therefore, the development of the software for measurement of safety cost can solve the problem through the systematic calculation for safety cost and converting the related data to database, and also can build the strategy of the investment of Safety cost through analysing and comparing with the past data in the database. As a part of development of the software of Measurement of Safety Cost which is appropriate for the domestic environment, this study is developing a software based on Noguji method, which is one of the methods of Measurement of Safety Cost, and to appraise the efficiency of the management of Measurement of Safety Cost we will implement and improve the software in the case of the domestic enterprises.

  • PDF

Cost Estimation and Validation based on Natural Language Requirement Specifications

  • So Young Moon;R. Young Chul Kim
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.2
    • /
    • pp.218-226
    • /
    • 2023
  • In Korea, we still use function point based cost estimations for software size and cost of a project. The current problem is that we make difficultly calculating function points with requirements and also have less accurate. That is, it is difficult for non-experts to analyze requirements and calculate function point values with them, and even experts often derive different function points. In addition, all stakeholders strongly make the validity and accuracy of the function point values of the project before /after the development is completed. There are methods for performing function point analysis using source code [1][2][3][4] and some researchers [5][6][7] attempt empirical verification of function points about the estimated cost. There is no research on automatic cost validation with source code after the final development is completed. In this paper, we propose automatically how to calculate Function Points based on natural language requirements before development and prove FP calculation based on the final source code after development. We expect validation by comparing the function scores calculated by forward engineering and reverse engineering methods.

A characteristic study on the software development cost model based on the lifetime distribution following the shape parameter of Type-2 Gumbel and Erlang distribution (Type-2 Gumbel과 Erlang 분포의 형상모수를 따르는 수명분포에 근거한 소프트웨어 개발 비용모형에 관한 특성 연구)

  • Yang, Tae-Jin
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.4
    • /
    • pp.460-466
    • /
    • 2018
  • With the development of information technology, the scale of computer software system is constantly expanding. Reliability and cost of software development have a great impact on software quality. In this study, based on the software failure interval time data, a comparative analysis was performed on the characteristics of the software development cost model based on the lifetime distribution following the Type-2 Gumbel and Erlang distribution in the NHPP model. As a result, the trends of the cost curves for the Go-Okumoto model and the proposed Erlang model and the Type-2 Gumble model both decreased in the initial stage and gradually increased in the latter half of the failure time. Also, Comparing the Erlang model with the Type-2 Gumble model, we found that the Erlang model is faster and more cost-effective at launch. Through this study, Software operators should remove possible defects from the testing phase rather than the operational phase to reduce defects after the software release date, it is expected to be able to study the prior information needed to understand the characteristic of software development cost.

Estimating Software Development Cost using Support Vector Regression (Support Vector Regression을 이용한 소프트웨어 개발비 예측)

  • Park, Chan-Kyoo
    • Korean Management Science Review
    • /
    • v.23 no.2
    • /
    • pp.75-91
    • /
    • 2006
  • The purpose of this paper is to propose a new software development cost estimation method using SVR(Support Vector Regression) SVR, one of machine learning techniques, has been attracting much attention for its theoretic clearness and food performance over other machine learning techniques. This paper may be the first study in which SVR is applied to the field of software cost estimation. To derive the new method, we analyze historical cost data including both well-known overseas and domestic software projects, and define cost drivers affecting software cost. Then, the SVR model is trained using the historical data and its estimation accuracy is compared with that of the linear regression model. Experimental results show that the SVR model produces more accurate prediction than the linear regression model.

A Development Cost Estimation at Initial Phase for Military Software Using Backfiring Approach (백파이어링을 이용한 군사용 소프트웨어 초기단계 개발비용 산정 기법)

  • Lee Byong-Eun;Kang Sung-Jin
    • The KIPS Transactions:PartD
    • /
    • v.12D no.5 s.101
    • /
    • pp.737-744
    • /
    • 2005
  • As the portion of software cost in construction of the system related to the national defence is getting higher, the required accuracy of cost estimation on defense software in development is also getting higher. The PRICE S is used to estimate the software cost at the first stage in the development of software promptly. However, the PRICE S is appropriate for the American environment not for the Korean circumstances. Thus, we will present a method to compensate the PRICE S with comparing with the model of Korea Software Industry Association. Moreover, we also present another method to estimate software cost based on function point with backfiring approach, which will be used for the software projects planned. Finally, we expect that our works will provide a solution for applying the function point in the future and will increase the accuracy of cost estimation in software development.

Development of Life Cycle Cost Estimation Software on the Aspect of Maintenance Strategies (유지보수관점에서의 수명주기비용예측 소프트웨어 개발)

  • Jun, Hyun-Kyu;Kim, Jae-Hoon;Kim, Jong-Woon;Park, Jun-Seo
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.777-783
    • /
    • 2007
  • Life cycle costing is one of the most effective cost approaches when we choose a solution from series of alternative so the least long-term cost ownership is achieved. Life cycle costing in railway industry has been focused on the prediction of investment for railway vehicles. But in today, the life cycle cost, LCC, prediction on the aspect of operation and maintenance cost through whole life cycle is highly necessary. In this paper, we present a strategy for the development of life cycle cost estimation software on the aspect of maintenance strategies of railway vehicle. For this purpose, we suggested a structure of LCC software based on the UNIFE LCC model. And we developed a pilot version of software to evaluate the LCC model that we suggested for railway vehicle. We performed LCC analysis on the brake module of metro vehicle in case study and concluded that the software and model developed in this research could enough to support engineers in choosing better cost effective solutions from many alternatives.

  • PDF

A Study on the Estimation of Software Development Cost of IT Projects in Public Sector (공공부문 정보화사업의 소프트웨어 개발비용 예측에 관한 연구)

  • 박찬규;구자환;김성희;신수정;송병선
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.191-204
    • /
    • 2002
  • As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.

A Study on the Selection of Parameters and Application of SVM for Software Cost Estimation (소프트웨어 비용산정을 위한 SVM의 파라미터 선정과 응용에 관한 연구)

  • Kwon, Ki-Tae;Lee, Joon-Gil
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.3
    • /
    • pp.209-216
    • /
    • 2009
  • The accurate estimation of software development cost is important to a successful development in software engineering. This paper presents a software cost estimation method using a support vector machine. Support vector machine is one of the efficient techniques for classification, and it is the classification method of input data based on Maximum-Margin Hyperplane. But SVM has the problem of the selection of optimal parameters, because it is dependent on user's parameters. This paper selects optimized SVM parameters using advanced method, and estimates software development cost. The proposed approach outperform some recent results reported in the literature.

Modified Software Equation for Software Cost-Schedule Tradeoff (소프트웨어 비용-일정 타협을 위한 수정된 소프트웨어 공식)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.9
    • /
    • pp.35-43
    • /
    • 2011
  • To develop a software, there is a relationship between development organization's productivity, effort, development schedule, and software size. It is software equation that motive these relations. Basically, relationship between size-effort and size-schedule is applied. If this relationship is not proper, there would be no effect of the cost-schedule tradeoff equation that is derived from software equation, and the manpower profile analysis, etc. To solve these unwanted problems, we presented a modified software equation and a cost-schedule tradeoff model based on the modified software equation. To improve software development success rate, applying proposed model will help in contract negotiation or bid.

A Study on the Attributes of Software Reliability Cost Model with Shape Parameter Change of Type-2 Gumbel Life Distribution (Type-2 Gumbel 수명분포의 형상모수 변화에 따른 소프트웨어 신뢰성 비용모형의 속성에 관한 연구)

  • Yang, Tae-Jin
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.12 no.3
    • /
    • pp.211-217
    • /
    • 2019
  • In this study, we compare and analyze the attributes of the software development cost model according to the shape parameters change of the Type-2 Gumbel lifetime distribution using the NHPP model. In order to analyze the software failure phenomena, the parametric estimation is applied to the maximum likelihood estimation method, and the nonlinear equations are calculated using the bisection method. As a result, when the attributes of the cost curves according to the change of shape parameters are compared, it is found that the larger the number of shape parameters, the lower the software development cost and the faster the release time. Through this study, it is expected that it will be helpful for the software developers to search for the development cost according to the software shape parameters change, and also to provide the necessary information for the attributes of the software development cost.