• Title/Summary/Keyword: Smart Electric Service (SES)

Search Result 2, Processing Time 0.02 seconds

A Large Scale Smart-Grid field-test in Jeju (제주 Smart-Grid 대규모 실증단지 구축 현황)

  • NamKoong, Won;Ha, Bok-Nam;Lee, Sung-Woo;Seo, In-Yong;Jang, Moon-Jong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.1
    • /
    • pp.1-6
    • /
    • 2012
  • Five smart grid projects was started with large scale at Jeju Island in South Korea from 2009, and smart-grid test-bed was started in Nov. 2010. The five projects are Smart Power Grid (SPG), Smart Renewable (SR), Smart Transportation (ST), Smart Place (SP) and Smart Electric Service (SES). Korea government constructed the smart grid public relations center at Nov. 2010 in Jeju Island and there will be continued the field operation and interface testing among five smart gird projects until May. 2013.

The Design and Construction of Smart Power Grid Field Application System (Smart Power Grid 실증시스템 설계 및 구축)

  • Ha, Bok-Nam;Lee, Seong-Woo;Jang, Moon-Jong;NamGung, Won;Seo, In-Young
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.720-721
    • /
    • 2011
  • 본 논문에서는 제주 스마트그리드실증단지에서 진행중인 스마트그리드 5개 프로젝트 중 송배전분야의 전력망을 통합 운영하는 Smart Power Grid(SPG) 실증시스템의 설계와 구축 현황에 대해서 기술한다. 스마트그리드 프로젝트는 SPG외에도 ST(Smart Transportation), SP(Smart Place), SR(Smart Renewable), SES(mart Electric Service)가 있는데, SPG는 SES 프로젝트에서 운영하는 통합관제센터(TOC)를 거쳐 ST, SR, SP 시스템들과 운전 정보를 서로 교환하여 사용한다.

  • PDF