Application of Construction Management techniques in Small Construction Projects (소규모 프로젝트의 효율적인 공사관리방안)

  • Lee, Sang-Beom;Lee, Dong-Un
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.95-102
    • /
    • 2003
  • A construction project's period is limited by the order manufacture. And a construction project is requested a specific place, and has the characteristic to be irregular. Today, construction is to be representative high-cost and low-efficiency. This kind of problems appears in small construction projects more often than large construction projects. According to this facts, we recognized necessity of making practical application in methods of construction management. Also, we suggest application and establishment of integrated responsibility management department, PMIS(Project Management Information System) and Data Base. From now on, methods of construction management could be good opportunities for small construction projects and local construction companies. Therefore, small and local construction companies should try to improve their abilities. Likewise, the countries systematize to constitute the relation laws.

Causes of Schedule Delays in Building Construction Projects in Vanuatu

  • Kim, Dae Young;Chi, Seokho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.641-651
    • /
    • 2015
  • With its recent tourism boom, Vanuatu, a small country in the South Pacific, is experiencing an increasing demand for construction. However, it has been struggling with persistent schedule delays in their construction projects due to a variety of reasons. In an attempt to respond to this situation, this paper aims to identify the major causes of schedule delays in building construction in Pacific island countries, with a focus on Vanuatu. To collect data on the factors affecting schedule delays, face-to-face interviews were conducted. Based on these, seven major causes of schedule delays, as selected by the majority of the participants, were identified and discussed to provide perceptive insights for future improvement opportunities. This paper attempts to help contractors with limited resources better understand the major causes of schedule delay in Vanuatu and achieve better performance in building projects.

Impact of Balance between Productivities on Repetitive Construction Projects

  • Shim, Euysup;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.360-371
    • /
    • 2013
  • Fast delivery of construction projects provides more value to project owners. Batch production, which is production not in single pieces, but in batches, is a common approach in repetitive construction projects such as multi-unit residential building construction projects. In batch production, the use of a small batch size allows the early start of subsequent activities, and thus can lead to early completion of projects. In addition to batch size, balance between productivities in construction activities can affect project duration. However, the impact of the balance between productivities with regard to their order on project duration has not been studied. The main goal of this study is to test a hypothesis, which is that the order of construction activities' unbalanced productivities affects the amount of time reduction that can be achieved by using a small batch size. A computer-based simulation model was developed, and five different cases were simulated to test the hypothesis. The conclusion of the simulation result is that the order of productivities does not affect the time reduction achieved by using a small batch size. It is expected that the findings of this study can help general contractors make decisions in terms of batch size.

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

Correlation Analysis between Safety Education and Human Error by Construction Workers (안전교육과 건설근로자 휴먼에러 상관관계 분석)

  • An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.343-349
    • /
    • 2014
  • The construction projects are larger and more complex, and so the construction accidents are bigger. Recently, the studies for reducing the human errors are researched to decrease the construction accidents. The purpose of this study is to analysis a correlation between the safety education and human errors by construction workers. The results showed that the frequencies of safety education in large sized construction projects are more than these in small sized construction projects. However, all of construction projects conduct lower times of safety education than the regulated times. In addition, it is revealed that the human errors of construction workers in large sized construction projects are being lower in accordance with increasing the safety education times. In small sized construction projects, however, the human errors of construction workers are increasing according to more times of safety education, reversely. This study should help to reduce the accidents in construction projects.

Combine Method of Small Unit Modules for Urban Regeneration Projects (도시재생을 위한 소형 유닛모듈 결합방법)

  • Kim, Kyoon-Tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.243-244
    • /
    • 2018
  • This study focused on the fact that there are a lot of alleys in some areas of the Urban Renewal New Deal project. In this study, we proposed a method to construct a spatial module by combining small modules. It is expected that the combination of small modules developed in this way will help revitalize the New Deal of Urban Regeneration. In the future, additional joint details will be developed, structure review will be conducted.

  • PDF

A Study on the composition of PFV(project financing vehicle) used in large-scale development project (대규모 개발사업에서의 PFV 구성에 관한 연구)

  • Kim, Eun-sung;Kim, Jae-jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.159-163
    • /
    • 2008
  • The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.

  • PDF

Analysis and Improvement Plan of Government Support Project for Reducing Disaster in Small Construction Site. (소규모 건설현장의 재해저감을 위한 정부지원 사업 분석 및 개선요구사항 도출)

  • Baek, Nak-Ku;Lee, Mi-Hyeon;Lim, Houng-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.116-117
    • /
    • 2018
  • The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.

  • PDF

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF