• Title/Summary/Keyword: Small reservoir

Search Result 339, Processing Time 0.032 seconds

The Behavior and Circulation of Density Current in a Small Reservoir (소규모 저수지에서 밀도류의 거동 및 순환)

  • Yoon, Tae Hoon;Han, Woon Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.11 no.2
    • /
    • pp.27-37
    • /
    • 1991
  • The behavior of a negative buoyant flow flowing into a small reservoir is analysed by experiments and dimensional analysis. The nondimensional plunge point, head velocity, head travel distance and the dilution of density current are dependent on the inflow densimetric Froude number, Fre. The thickness of density current, flow pattern and density difference are different from two cases as follows; before the front of head arrive at the downstream end and after. Before the arrival, the thickness of density current is dependent on Fre and after the arrival, time and Fre. It was found that they can be expressed as power laws.

  • PDF

A Study on the Risk Assessment of Small Reservoirs using Reliability Analysis Methods (신뢰도 분석기법을 이용한 소규모 저수지의 위험도 분석)

  • Kim, Mun-Mo;Park, Chang-Eon
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.1
    • /
    • pp.15-30
    • /
    • 2000
  • This study is to develop the applied method of reliability analysis to present risk - initial water level relationship in the small reservoir. To determine the reliability, the grasping of uncertainty sources is prerequisited and performance function is formulated. Reliability analysis method is a statistical method and the basic procedure of risk evaluation for overtopping of reservoir is as follows. 1. Define the risk criterion and performance function for the overtopping. 2. Determine the uncertainties of all the variables in the performance function. 3. Perform the risk analysis with suitable risk calculation method. Reliability analysis method such as Monte Carlo simulation(MCS) method and mean value first order second moment(MVFOSM) method are used to calculate the risk for reservoir. Finally, risk - initial water level relationship is established according to return period and it is useful for reservoir operation and safety assessment.ssment.

  • PDF

Modeling Downstream Flood Damage Prediction Followed by Dam-Break of Small Agricultural Reservoir (농업용 소규모 저수지의 붕괴에 따른 하류부 피해예측 모델링)

  • Park, Jong-Yoon;Joh, Hyung-Kyung;Jung, In-Kyun;Jung, Kwan-Soo;Lee, Joo-Heon;Kang, Bu-Sik;Yoon, Chang-Jin;Kim, Seong-Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.6
    • /
    • pp.63-73
    • /
    • 2010
  • This study is to develop a downstream flood damage prediction model for efficient confrontation in case of extreme and flash flood by future probable small agricultural dam break situation. For a Changri reservoir (0.419 million $m^3$) located in Yongin city of Gyeonggi province, a dam break scenario was prepared. With the probable maximum flood (PMF) condition calculated from the probable maximum precipitation (PMP), the flood condition by dam break was generated by using the HEC-HMS (Hydrologic Engineering Center - Hydrologic Modeling System) model. The flood propagation to the 1.12 km section of Hwagok downstream was simulated using HEC-RAS (Hydrologic Engineering Center - River Analysis System) model. The flood damaged areas were generated by overtopping from the levees and the boundaries were extracted for flood damage prediction, and the degree of flood damage was evaluated using IDEM (Inundation Damage Estimation Method) by modifying MD-FDA (Multi-Dimensional Flood Damage Analysis) and regression analysis simple method. The result of flood analysis by dam-break was predicted to occurred flood depth of 0.4m in interior floodplain by overtopping under PMF scenario, and maximum flood depth was predicted up to 1.1 m. Moreover, for the downstream of the Changri reservoir, the total amount of the maximum flood damage by dam-break was calculated nearly 1.2 billion won by IDEM.

Analysis of the Characteristics of NPS Runoff and Application of L-THIA model at Upper Daecheong Reservoir (대청호 상류 유역의 비점오염원 유출특성 분석 및 L-THIA 모형 적용성 평가)

  • Shin, Min-Hwan;Lee, Jae-An;Cheon, Se-Uk;Lee, Yeoul-Jae;Lim, Kyoung-Jae;Choi, Joong-Dae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.1
    • /
    • pp.1-11
    • /
    • 2010
  • Generation and transportation of runoff and pollutant loads within watershed generated eutrophication at Daecheong reservoir. To improve water quality at Daecheong reservoir, the best management practices should be developed and applied at upper watersheds for water quality improvement at downstream areas. In this study, two small watersheds of upper Daecheong reservoir were selected. The Long-Term Hydrologic Impact Assessment (L-THIA) model has been widely used for the estimation of the direct runoff worldwide. To apply the L-THIA ArcView GIS model was evaluated for direct runoff and water quality estimation at small watershed. And the Web-based Hydrograph Analysis Tool (WHAT) was used for direct runoff separating from total flow. As a result, the $R^2$ (Coefficient of determination) value and Nash-Sutcliffe coefficient value for direct runoff comparison at An-nae watershed were 0.81 and 0.71, respectively. And the $R^2$ value and Nash-Sutcliffe coefficient value at Wol-oe were 0.95 and 0.93. The $R^2$ value of BOD, TOC, T-N and T-P at An-nae watershed were BOD 0.94, TOC 0.81, T-N 0.94 and T-P 0.89. And the $R^2$ value of BOD, TOC, T-N and T-P at Wol-oe watershed were BOD 0.80, TOC 0.93, T-N 0.86 and T-P 0.65. The result that estimated pollutant loadings using the L-THIA ArcView GIS model reflected well the measured pollutant loadings except for T-P in Wol-oe watershed. With L-THIA ArcView GIS model, the direct runoff and non-point pollutant (NPS) loadings in the watershed could be analyzed through simple input data such as daily rainfall, land uses, and hydrologic soil group.

A Study on the Degree of Pollution of Stream and Reservoir Sediments in Rural Area (농촌 중.소 하천 및 저수지 퇴적물의 오염현황)

  • Chang, Pyoung-Wuck;Woo, Chull-Woong;Kim, Seong-Pil
    • Journal of Korean Society of Rural Planning
    • /
    • v.9 no.2 s.19
    • /
    • pp.1-6
    • /
    • 2003
  • This study was performed to investigate the degree of pollution of sediments of stream and reservoir in rural area. A series of field investigations were carried out for Kyongki-do area and chemical analysis were performed for sediment samples. It was found that some samples were heavily polluted with phenol and TPH and gave off a malodor. Soil Pollution Scores(SPSs) was determined for sediment samples. Some samples were classified to Soil Pollution Class(SPC) 2 and 3. For recycling and disposal of dredged sediments from stream and reservoirs, these polluted sediments should be carefully considered. In the environmental improvement operations of rural area, the degree of pollution of sediments of stream and reservoir are carefully investigated and suitable counterplan must be established.

Experimental study on multi-level overtopping wave energy convertor under regular wave conditions

  • Liu, Zhen;Han, Zhi;Shi, Hongda;Yang, Wanchang
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.10 no.5
    • /
    • pp.651-659
    • /
    • 2018
  • A multi-level overtopping wave energy converter was designed according to the large tidal range and small wave heights in China. It consists of two reservoirs with sloping walls at different levels. The reservoirs share a common outflow duct and a low-head axial turbine. The experimental study was carried out in a laboratory wave-flume to investigate the overtopping performance of the device. The depth-gauges were used to measure the variation of the water level in the reservoirs. The data was processed to derive the time-averaged overtopping discharges. It was found that the lower reservoir can store wave waters at the low water level and break the waves which try to climb up to the upper reservoir. The upper sloping angle and the opening width of the lower reservoir both have significant effects on the overtopping discharges, which can provide more information to the design and optimization of this type of device.

Hydrological Drought Assessment of Agricultural Reservoirs based on SWSI in Geum River Basin (SWSI에 기반한 금강권역 농업용 저수지의 수문학적 가뭄평가)

  • Ahn, So-Ra;Park, Jong-Yoon;Jung, In-Kyun;Na, Sang-Jin;Kim, Seong-Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.5
    • /
    • pp.35-49
    • /
    • 2009
  • This study proposes a method to evaluate agricultural reservoirs drought by modifying SWSI (Surface Water Supply Index). The method was applied to Geum river basin and the results were represented as spatially distributed information. The SWSI evaluates hydrological drought of watershed unit by selectively applying one or all of the components of snowpack, precipitation, streamflow and reservoir storage. South Korea has 22 % of agricultural area, and rice paddy covers 64 % among them. Usually paddy fields scattered along stream are irrigated by so many small agricultural reservoirs. It is difficult to evaluate agriculture drought by the little information and large number of agricultural reservoirs. In this study, seven agricultural reservoirs over 10 million ton storage capacity were selected in Geum river basin, and the SWSI was evaluated for both upstream and downstream of the reservoirs using 16 years data (1991-2006). Using the results, multiple regression analyses with precipitation and reservoir storage as variables were conducted and the equations were applied to other watersheds. The spatial results by applying regression equations showed that the severe and moderate drought conditions of July and September in 1994, June in 1995, and May in 2001 were well expressed by the watershed unit.

Vertical distribution and seasonal changes of phytoplankton communities in the Hoe-Dong Reservoir

  • Jung-Gon, Kim;Su-Youn, Kim;Sun-Hee, Kwon;Sangkyun, LEE;Gea-Jae, Joo
    • Proceedings of the Korean Environmental Sciences Society Conference
    • /
    • 2000.05a
    • /
    • pp.251-254
    • /
    • 2000
  • In this study, we investigated vertical distribution and seasonal changes of phytophlankton community in the Hae-Dong Reservoir from March 1999 to Feburary 2000. This reservoir is relativly small (surface area, 2.7 $km^2$) and is the source of drinking water supply to the eastern part of Pusan City. Samples were collected at 2 sites (1, 3, and 6 m; site 1, in front of the dam; site 2, inlet). The dominant group was Bacillriophyceae at both sites (over 63%), and other groups exhibited seasonal changes (high cyanobacterial density in summer; green algal communities in winter). Chrysophyceae and Dinophyceae were maintained lower level during the study period. Along the water depth, all classess of phytoplankton did not show distintive vertical distribution at both sites except during the blue-green algal bloom in the middle of July and late September. The phytoplankton community dynamics in the Hoe-Dong Reservoir was strongly affected by the hydrological factors such as concentrated precipitation and short retention time.

  • PDF

Evaluation of Flood Control Capacity for Seongju Dam against Extreme Floods (이상강우에 대비한 성주댐의 홍수조절 능력 분석)

  • 권순국;한건연;서승덕;최혁준
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.6
    • /
    • pp.109-118
    • /
    • 2003
  • As a fundamental research to establish a safety operation plan for irrigation dams, this study presents hydrologic analysis conducted in Sungju Dam watershed based on various rainfall data. Especially those reservoirs without flood control feature are widely exposed to the risk of flooding, a safe and optimized operation program need to be improved against arbitrary flooding. In this study, reservoir routing program was developed and simulated for reservoir runoff estimation using WMS hydrology model. The model simulated the variations of reservoir elevation under the condition of open or closed emergency gate. In case of closed emergency gate, water surface elevation was given as 193.15 m, and this value exceeds the dam crest height by 1.65 m. When the emergency gate is open, the increment of water surface elevation is given as 192.01 m, and this value exceeds dam crest height by 0.57 m. As an alternative plan, dam height increase can be considered for flood control under the PMP (Probable Maximum Precipitation) condition. Since the dam size is relatively small compare to the watershed area, sound protection can be expected from the latter option rather than emergency gate installation.