• Title/Summary/Keyword: Small hydro

Search Result 243, Processing Time 0.034 seconds

Internal Flow Characteristics of a Francis Hydro Turbine Model by Internal Flow Passage Shapes

  • Chen, Zhenmu;Wei, Qingsheng;Singh, Patrick Mark;Choi, Young-Do
    • The KSFM Journal of Fluid Machinery
    • /
    • v.18 no.5
    • /
    • pp.19-25
    • /
    • 2015
  • As a core component of a hydropower station, hydro turbines play a vital role in the integration of a power station. Research on the technology of hydro turbine is continuously increasing with the development of water electricity. On the basis of one-dimensional loss analysis, for three-dimension design, there are a lot of dimension of the internal flow passage shapes that are determined by experience. Therefore, the effect of the internal flow passage shapes on the performance and internal flow characteristics of a Francis hydro turbine model is investigated in this study. In this study, the small curvature of runner blade trailing edge shape is good for improving the efficiency of Francis turbine. The straight stay vane leading edge is good for suppressing the secondary flow. Moreover, suitable tongue passage shape and stay vane number improve the performance of the turbine considerably.

Prediction of the Flow Pattern Changes using FLOW-3D Model in the Effluent Region of the Samcheonpo Thermal Power Plant (TPP) (소수력 발전소 건설에 의한 삼천포 화력발전소 방류수로 흐름변화 예측)

  • Cho, Hong-Yeon;Jeong, Shin-Taek;Kim, Jeong-Dae;Kang, Kem-Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.18 no.4
    • /
    • pp.338-347
    • /
    • 2006
  • A small hydro-power plant using the seawater used as the cooling (circulated) water and discharged is under construction. The bigger size of the small hydro-power plant, the better in order to maximize the efficiency and the electric power. The optimal size, however, should be determined in the constraints of the channel un-disturbed range. The water level change should be checked in detail based on the hydraulic behaviour. In this study, the FLOW3D model, three-dimensional flow model, is setup using the flow measurement data in the effluent discharge channel and the flow pattern changes due to the small hydro-power plant construction are predicted by the model. The plant construction makes the increasing of the water level, and the water level in the upstream of the channel weir is increased 65 cm from 4.32 m to 4.97 m, in the condition of the design discharge $156m^3/s$ and the movable weir height of the hydro-power plant 3.8 m.

Characteristics of Small Hydro Power Resources for River System (수계별 소수력자원의 특성)

  • Park, Wansoon;Lee, Chulhyung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.193.1-193.1
    • /
    • 2010
  • Small hydropower resources for five major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for small hydropower(SHP) plants is established. Monthly inflow data measured at Andong dam were analyzed. The predicted results from the developed models in this study showed that the data were in good agreement with measured results of long term inflow at Andong dam. It was found that the models developed in this study can be used to predict the available potential and technical potential of SHP sites effectively. Based on the models developed in this study, the hydrologic performance for small hydropower sites located in river systems have been analyzed. The results show that the hydrologic performance characteristics of SHP sites have some difference between the river systems. Especially, the specific design flowrate and specific output of SHP sites located on North Han river and Nakdong river systems have large difference compared with other river systems.

  • PDF

Characteristic Analysis of Small Hydro Power Resources for River System (수계별 소수력자원의 특성 분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.235-240
    • /
    • 2011
  • Small hydropower resources for five major river systems have been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the variation of inflow caused from rainfall condition. And another model to predict hydrologic performance for small hydropower(SHP) plants is established. Monthly inflow data measured at Andong dam were analyzed. The predicted results from the developed models in this study showed that the data were in good agreement with measured results of long term inflow at Andong darn. It was found that the models developed in this study can be used to predict the available potential and technical potential of SHP sites effectively. Based on the models developed in this study, the hydrologic performance for small hydropower sites located in river systems have been analyzed. The results show that the hydrologic performance characteristics of SHP sites have some difference between the river systems. Especially, the specific design flowrate and specific output of SHP sites located on North Han river and Nakdong river systems have large difference compared with other river systems.

  • PDF

A Study on the Variation of Power Factor by Connection of the Induction Generator to the Distribution Line (배전선로에 유도발전기 연결시 역률 변동에 관한 연구)

  • Kim, Jong-Gyeum
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.3
    • /
    • pp.159-163
    • /
    • 2015
  • Recently squirrel cage induction generator has been steadily applied to many small hydro power plants. Induction generator needs a reactive power for magnetization. The reactive power of induction generator is being supplied from the supply side mostly. The use of induction generators in the power distribution grid can affect the power factor. The power factor of induction generator is fixed already during production. The power factor in the distribution system is due to the increase or decrease of the load rather than due to the induction generator. In this study, we analyzed that how the increase or decrease of D/L load impacts at the change of power factor and power flow.

Characteristics Analysis of 3-phase Induction Generator at the Unbalanced Load Operation (불평형 부하 운전시 3상 유도발전기 특성 해석)

  • Kim, Jong-Gyeum
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.56 no.3
    • /
    • pp.123-128
    • /
    • 2007
  • Hydro power supplies no pollution energy, mainly induction generator has been applied at the small capacity power station. The generating power of small hydro-electric power station connects on the 22.9kV distribution system or low voltage system in the case of three-phase four-wire supply system. There are side effects of various kinds in the 3-three phase 4-wire distribution system mixing 1-phase load and 3-phase load. This system generates the voltage unbalance by unbalanced load operating condition. They have various serious effects on generator and connection system. In this paper, we analyzed what kind of operation characteristic are happened in the induction generator by customer load variation at the 3-three phase 4-wire distribution system.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro Power Plants

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Korean Journal of Hydrosciences
    • /
    • v.3
    • /
    • pp.81-96
    • /
    • 1992
  • This study represents the methodology for feasibility analysis of small hydro power SHP plant. Cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP candidate site. The perfomance prediction model and construction cost estimation model for tunnel-type SHP plant were developed. Eight tunnel -type SHP candidate sites existing on Han-river were selected and surveyed for actual site reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrate with the lowest unit generation cost for tunel-type SHP candidate site were the flowrate concerming with between 20% and 30% of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual averageload factor, annual electricity production were estimated and discussed for eight surveyed SHP candidate sites.

  • PDF

A Study on an Improvement Plan of Plant-Use Electricity for New & Renewable Energy Supported by Electric Power Industry Basis Fund (기반기금 지원 신재생에너지 발전에 대한 소내소비전력 처리방안 연구)

  • Jeon, Byung-Kyu;Kim, Jae-Sung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.678-681
    • /
    • 2007
  • Now Korea depends upon the imported resources for about 97% of total using energy. So from October, 2001 Korean government has supported renewable energy business owners by providing them with Electric Power Industry Basis Fund. Only plant-use electricity of the small hydro power plant is exactly managed, but other renewable energy plants is unprepared or not yet managed. Therefore, in this paper, we'll analyze the plant-use electricity management of the small hydro power and propose improvement plans for plant-use electricity of the photovoltaic power plant.

  • PDF

Optimized Sealing Profile Design of Mechanical Face Seals for a Hydro-power Turbine (소수력 터빈용 기계평면시일의 최적형상설계에 관한 연구)

  • Kim, Chung-Kyun;Kim, Jung-Il;Sihn, Ihn-Cheol;Lim, Kwang-Hyeon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.499-502
    • /
    • 2006
  • This paper presents computed results of FEM analysis on the tribological contact behaviors of a primary sealing components of mechanical face seals for a small hydro-power turbine. The FEM computed results present that the contact area between seal rings and seal seats is very important for a good tribological performance such as low friction heating, low wear, high contact normal stress in a primary seal ing components. Based on the FEM computation, model III in which has a small sealing contact area shows low dilatation of primary sealing components, and high contact stress between a seal ring and a 1)seal seat.

  • PDF