• Title/Summary/Keyword: Small Hydro Power

Search Result 175, Processing Time 0.023 seconds

Performance Characteristics of an Axial Propeller Small-hydro Turbine with Various Cambers of Runner Blade (캠버각 변화에 따른 소수력 축류 프로펠러 수차의 유동 특성 연구)

  • Byeon, Sun-Seok;Kim, Tae-Youn;Han, Sang-Meok;Kim, Jeong-Hwan;Kim, Youn-Jea
    • New & Renewable Energy
    • /
    • v.8 no.2
    • /
    • pp.44-51
    • /
    • 2012
  • The aim of this paper is to examine the hydraulically optimized camber of a blade. Prior studies have tried to determine the sound method of design on small-hydro turbines. These have appeared to realize a reasonably efficient small-hydro turbine. Nonetheless, specific and accurate design data have not as yet been established for the shape of the runner blade. Hence, this study examines the performance characteristic of an axial propeller turbine with 0~8% camber variations. The results of output power, efficiency, and pressure distribution of the turbine are graphically depicted. The definition of camber refers to the NACA airfoil. The commercial finite element analysis (FEA) packages, ANSYS, and CFX are used in this study. The results revealed the performance characteristics on small-hydro turbine and suggested a highly efficient section shape of the runner.

The Essential Point for the Selection of Small Hydropower Turbine & Generator (소수력 수차발전기의 선정 주안점)

  • Lee Eun-Woong;Lee Gyeong-Bae
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.452-455
    • /
    • 2005
  • We have studied the prearranged plan and the economy of a candidate site for the development of small hydro power. And also we have confirmed its economy by suggesting the technology of the unmanned operation and the selection of the water turbine generator which has a great efficiency. working rate and suitability to the topographical characteristics of various development sites, for example, irrigation reservoirs, water works pipes, sewage systems and cool ing water of a steam power stat ion. Besides we give more examples of the select ion of Francis, propeller turbine and induction generator which can achieve a maximum of power production at a minimum construction cost. With a water turbine which runs at the low head we are able to suggest many programs to boost a development of small hydro power more economically.

  • PDF

Performance Prediction of Tunnel-Type Small Hydro Power Plants with Diversion Dam

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Solar Energy
    • /
    • v.20 no.2
    • /
    • pp.67-73
    • /
    • 2000
  • This study represents the methodology of performance prediction for small hydro power(SHP) sites. Nine tunnel type SHP sites with diversion dam were selected and the performance characteristics were analyzed by using a developed model. Also, primary design specifications such as design flowrate, plant capacity, and operational rate were suggested and feasibility for tunnel-type SHP sites were estimated. It was found that the design flowrate was most important parameter to exploit SHP plant and the methodology developed in this study was useful tool to analyze the performance of SHP sites.

  • PDF

Technology Based on Wall-Thinning Prediction and Numerical Analysis Techniques for Wall-Thinning Analysis of Small-Bore Carbon Steel Piping (감육예측 및 수치해석 기법을 활용한 소구경 탄소강배관 감육영향 분석에 관한 연구)

  • Lee, Dae-Young;Hwang, Kyeong-Mo;Jin, Tae-Eun;Park, Won;Oh, Dong-Hoon
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.4
    • /
    • pp.429-435
    • /
    • 2010
  • In approximately fifty utilities, including KHNP (Korea Hydro & Nuclear Power), CHECWORKS is used as a tool for predicting and managing the wall thinning of carbon steel piping; this wall thinning is caused by flow-accelerated corrosion (FAC). It is known that CHECWORKS is only applicable to predict the wall thinning of piping with large bores. When dealing with small-bore steel piping, FAC engineers measure the thickness of the susceptible area that is selected on the basis of the experience and judgment of the engineer. This paper proposes the application of CHECWORKS for the management of wall thinning of small-bore piping. Four small-bore pipelines of a domestic nuclear power plant were analyzed from the viewpoints of FAC and fluid dynamics by using CHECWORKS and FLUENT code. Depending on the engineer's skill, CHECWORKS can also be used for the management of wall thinning of small-bore piping.

A Study on Contact Characteristics of Mechanical Face Seals for a Hydro-power Turbine Depending on the Rubbing Surface Geometry (소수력 터빈용 기계평면시일의 표면마찰형상에 따른 접촉특성 해석에관한 연구)

  • Kim Chung-Kyun
    • Tribology and Lubricants
    • /
    • v.22 no.3
    • /
    • pp.119-126
    • /
    • 2006
  • In this paper, the contact behavior characteristics of a primary sealing components such as a seal ring and a seal seat has been presented for a small hydro-power turbine. Using the non-linear FEM analysis, the maximum temperature, the axial displacement, radial differences between a seal ring and a seal seat, and maximum contact normal stress have been analyzed for three optimized sealing profiles in which are designed based on the FEM analysis and Taguchi's experimental method. The three primary sealing profiles between a seal ring and a seal seat are strongly related to a leakage of a water for a hydro-power turbine and wear of a primary sealing component. The computed results show that the contact rubbing area between a seal ring and a seal seat is very important for reducing a friction heating and wear in a sealing gap, and increasing a contact normal stress in primary sealing components. Based on the FEM computation, models II and III in which have a small rubbing surface of seal rings show low dilatation of primary sealing components, and high normal contact stress between a seal ring and a seal seat. Thus, the FEM computed results recommend a short contacting width of a primary sealing component for reducing a leakage and thermal distortions, and expanding a seal life. This means that a conventional primary sealing component may be switched to a reduced sealing face of seal rings.

Performance Evaluation and Economic Analysis on the Integrated Small Hydro Power Generation Device Using a Discharged Water of Sewage Treatment Plant (하수처리장의 방류수를 이용한 일체형 발전장치의 성능평가 및 경제성 분석)

  • Park, Yoo-Sin;Kim, Ki-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.9
    • /
    • pp.486-491
    • /
    • 2017
  • The water discharged from sewage treatment plants has been considered to be useless, due to itslack of economic utility for small hydro power generation. Considering that most sewage treatment facilities have a water head of less than 2 meters and their flow rate is constant, it is necessary to develop a small hydro power generation device capable of maintaining stable power generation and efficiency. This paper presents the development of anintegrated small hydro power generation system and presents its performance evaluation and results. Then, the economics and use of the system for practical applications are suggested. As a result, it is foundthat the generator efficiency is 92%, the electric energy produced is 10kWh and the economic efficiency, as described by the B/C ratio,is 1.0 or more. Particularly, if the operating level of the generation device is maintained at 80% or more of the rated power, it is possible to secure its economic efficiency and, after 23 years, the investment cost will bereturned. The integrated hydro power generation device is expected to have a positive effect not only in terms of the water discharged from the sewage treatment plant, but also in terms of facilities capable of securing similar flow characteristics.

A Study on the Variation of Power Factor by Connection of the Induction Generator to the Distribution Line (배전선로에 유도발전기 연결시 역률 변동에 관한 연구)

  • Kim, Jong-Gyeum
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.3
    • /
    • pp.159-163
    • /
    • 2015
  • Recently squirrel cage induction generator has been steadily applied to many small hydro power plants. Induction generator needs a reactive power for magnetization. The reactive power of induction generator is being supplied from the supply side mostly. The use of induction generators in the power distribution grid can affect the power factor. The power factor of induction generator is fixed already during production. The power factor in the distribution system is due to the increase or decrease of the load rather than due to the induction generator. In this study, we analyzed that how the increase or decrease of D/L load impacts at the change of power factor and power flow.

Establishing performance test center for a small hydropower (소수력 발전설비의 성능시험센터 구축)

  • Kim, Young-Joon;Kim, Sang-Gyun;Lee, Dong-Keun;Park, Ju-Young
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.660-663
    • /
    • 2009
  • Currently in Korea, the lack of facilities and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic small hydropower turbine, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore Korean institute of water and environment in K-water planned making a basis of performance test of small hydropower by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system. Improving the efficiency of small hydropower system can achieve the additional development benefit about 1.5 billion won per year.

  • PDF

CFD Analysis on the Hydro Turbine by the Existence of Blade Holes (블레이드 타공에 따른 수차의 유동해석)

  • Park, Yoo-Sin;Kim, Ki-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.675-680
    • /
    • 2017
  • Considering that most sewage treatment facilities have a water head of less than 2.0 m and a constant flow rate, the development of a small hydro power generation device capable of maintaining stable power generation and efficiency is urgently needed. In this study, a numerical analysis using the CFD code was carried out to develop a drag force type vertical axis hydro turbine for the improvement of the production efficiency of small-scale hydro energy underlow flow velocity conditions. The blade pressure changes and internal flows were analyzed in the presence or absence of hydro turbine blade holes at a flow velocity of less than 2.0 m/s. The pressure distribution of the hydro turbine blades with holes was found to be about 5.1 % lower than that of the hydro turbine blades without holes. The analysis of the internal flow around the water tank and hydro turbine blade revealed that the flow velocity varied with the vector distribution and that the flow velocity of the hydro turbine blades with holes was 5.6 % less than that of the hydro turbine blades without holes. It is believed that forming a hole in the blade may be helpful for its structural safety.