• Title/Summary/Keyword: Small Construction

Search Result 2,470, Processing Time 0.028 seconds

A Comparative Study on Spatial Characteristics of Parcel by Type of Building Construction (건축행위 유형별 필지의 공간적 특성 비교연구)

  • Kim, Kijung;Kim, Dongjun;Lee, Seungil
    • Journal of Korea Planning Association
    • /
    • v.54 no.6
    • /
    • pp.27-42
    • /
    • 2019
  • The purpose of this study is to identify the spatial characteristics of the parcels in which building construction occurred. In recent, urban development patterns in Korea have been shifting from the past. Small-scale development at parcel level is becoming more important in accordance with individual location needs in the low-growth era unlike public lead large-scale urban development in the rapid growth period. Therefore, it is necessary to study the spatial characteristics of the parcels where small-scale development takes place for future urban development management. This study used the chi square independence test, t-test and ANOVA (analysis of variance) to identify the spatial characteristics. The results of the study show that there is a spatial characteristics difference not only between building construction and non-building construction parcels, but also by type of building construction. The parcel where the building construction occurred have a higher proportion in detached house, major commercial districts, district unit planning areas, and commercial areas. In addition, it is caused by parcels, which are large scale and economically valuable, and are influenced by traffic factors such as urban centers and subway accessibility. As a result of each type of building construction, the parcels where the building use change occurred have spatial characteristic difference compared to other building construction, while the spatial characteristics are similar between the new construction/extension and new construction/extension with change of use. Based on this results, it will be possible to identify areas with high demand for small-scale development in the future and to utilize them for planning management of urban development. Furthermore, it will be possible to manage development demand by type of building construction, and to prepare differentiated plans considering the appropriateness of development plan, availability of infrastructure, and harmony with surrounding environment.

Program development for composition of construction safety management expenses (건설안전관리비 산정 프로그램 개발)

  • Hong, Sung-Man;Lee, Jung-Gi;Park, Peom
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.2
    • /
    • pp.23-32
    • /
    • 2002
  • The small-and-medium sized construction sites are in weak state of safety management because of the variable working environments, the lack of safety techniques and the weak economic conditions, and industrial accidents of these sites were occupied 60% of the total construction accidents. Recently, the safety engineer's number are not to be enough at the small-and-medium sized construction sites. Therefore, the safety engineer's works are addition to more and more. This paper is a development of the integrated program which using composition of construction safety management expenses. It is an management tool which helps to saving time of construction safety engineer. A method of development composition, to used Brain Storming for a place of meeting to construction safety management counselors.

A Risk Assessment Counterplan for Reducing the Accident Rates in Medium and Small sized Construction Sites (중·소규모 건설현장의 재해율 감소를 위한 위험성평가 방안)

  • Jang, Yun-Ra;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.90-100
    • /
    • 2018
  • Government needs a risk assessment method that is effective in preventing accidents as a part of the three principal projects of the government for protecting the people's lives for establishing preventative measures to prevent accidents in the construction sites, which accounted for more than half of all accidental mortality accidents, and promote the safety-oriented culture for making fundamental changes. Accidents at the medium and small sized construction sites accounted for 88.9% of the total construction accidents. The data indicates that improper management and lack of advanced safety measures due to the absence of a safety supervisor are the biggest problems. It is believed that active measures to evaluate and prevent risks at construction sites are necessary for preventing accidents in the medium and small sized construction sites. The objectives of this study is to identify the key risk items of common accident causes and propose a practical, preemptive, and improved risk assessment method by evaluating the problems in the safety management of construction sites for reducing the accident rate in the medium and small sized construction sites.

Suggestion of Project Information Management System for Small & Medium Sized Construction Companies through Analysis of Information Management Structure (프로젝트 정보관리체계 분석을 통한 중소건설업체 프로젝트 정보관리시스템 모델 제안)

  • Lee Tai-Sik;Koo Ja-Kyung;Lee Sang-Yub;Kim Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.549-552
    • /
    • 2003
  • Small & medium-sized construction companies(SMCC), they has lot's of problem like poor finance, a lack of specialists, and a shortage of professional skill. So the basic condition of SMCC is not good for small construction companies. In this situation, moreover SMCC has been influenced by big-sired construction companies(BCC) difficult after the crisis of economics of Korea, IMF. Therefore it is necessary that we strengthen competitive power of SMCC for survival. This research is about project management for SMCC. We analized information system which is developed from SI corporation and BCC. As this research, we want to build and organize project information management system for SMCC. This will make SMCC have more competitiveness and increase productivity efficiency, skill for information management of project given.

  • PDF

Characterization of Runoff Properties of Non-point Pollutant at a Small Rural Area considering Landuse Types (토지이용 특성을 고려한 소규모 농촌유역의 비점오염물질 유출특성 해석)

  • Bae, Sang-ho;Kim, Weon-jae;Yoon, Young H.;Lim, Hyun-man;Kim, Eun-ju;Park, Jae-roh
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.4
    • /
    • pp.654-663
    • /
    • 2010
  • Attention has increasingly focused on the pollutant load discharged from rural area since the enforcement of total maximum daily loads (TMDLs) in korea. As one of the methods to control the inflow of pollutant load during wet weather events, local governments are attempting to apply non-point source control facility. To design those facilities appropriately, it is essential to understand the runoff characteristics of pollutants such as TSS, $BOD_5$, $COD_{Cr}$, TP and TN. In the paper, the quantitative analyses for pollutant runoff characteristics were examined in a small rural watershed with the area of about 53 hectares. For a dry weather day and wet weather events, variation patterns of dry weather flow and runoff characteristics of wet weather flows were monitored and investigated. The runoff model using XP-SWMM reflecting the landuse types of the watershed in detail was simulated to perform the sensitivity analyses for several factors influencing on their hydrograph and pollutographs. As a result, for the case of medium and small rainfall events (i. e. total rainfall of 35.8 and 17.5 mm), the impervious area including green house, roof and road which covers relatively low portion of total area (i. e. 16%) caused substantial first flush and the majority of total runoff load. Therefore, it has been concluded that the runoff characteristics of each pollutant and distribution of impervious area should be considered for the establishment of the control strategy of non-point pollutant runoff at a rural area.

The Effect of Job Embeddedness in Small and Medium Sized Construction Companies on Turnover Intention through Organizational Commitment (중소건설기업의 직무배태성이 이직의도에 미치는 영향 : 조직몰입을 매개로)

  • Choi, Young-cheol;Hwang, Chan-gyu;Kim, Ji-hyung
    • Journal of Venture Innovation
    • /
    • v.5 no.3
    • /
    • pp.41-55
    • /
    • 2022
  • The purpose of this study is to investigate the effect of Job Embeddedness of members of small and medium-sized construction companies on turnover intention through organizational commitment, targeting employees of small and medium-sized construction companies located in Seoul, Gyeonggi, and Incheon. The significance sampling method was applied as the sampling method, and the number of cases used in the final analysis was 316, and the input data was processed using the SPSS 20.0 program for statistical analysis. As a result of analysis, First, it was found to have a significant negative(-) effect on the turnover intention in suitability and sacrifice as sub-factors of Job Embeddedness of small and medium-sized construction company members, and the correlation between linkage and turnover intention was not significant. Second, it was found to have a significant positive(+) effect on the organizational commitment in suitability, links and sacrifice as sub-factors of job embeddedness of small and medium-sized construction company members. Third, organizational commitment was found to have a significant negative(-) effect on turnover intention. Fourth, organizational commitment was found to completely mediate the relationship between job commitment and turnover intention. Therefore, it was found that the higher the Job embeddedness of the members of small and medium-sized construction companies, the more influential the turnover intention. This suggests that it can have a negative effect on turnover intention by improving the suitability of values pursued by individual members of the organization, work passion, and attachment to the organization.

Computer Vision-based Continuous Large-scale Site Monitoring System through Edge Computing and Small-Object Detection

  • Kim, Yeonjoo;Kim, Siyeon;Hwang, Sungjoo;Hong, Seok Hwan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1243-1244
    • /
    • 2022
  • In recent years, the growing interest in off-site construction has led to factories scaling up their manufacturing and production processes in the construction sector. Consequently, continuous large-scale site monitoring in low-variability environments, such as prefabricated components production plants (precast concrete production), has gained increasing importance. Although many studies on computer vision-based site monitoring have been conducted, challenges for deploying this technology for large-scale field applications still remain. One of the issues is collecting and transmitting vast amounts of video data. Continuous site monitoring systems are based on real-time video data collection and analysis, which requires excessive computational resources and network traffic. In addition, it is difficult to integrate various object information with different sizes and scales into a single scene. Various sizes and types of objects (e.g., workers, heavy equipment, and materials) exist in a plant production environment, and these objects should be detected simultaneously for effective site monitoring. However, with the existing object detection algorithms, it is difficult to simultaneously detect objects with significant differences in size because collecting and training massive amounts of object image data with various scales is necessary. This study thus developed a large-scale site monitoring system using edge computing and a small-object detection system to solve these problems. Edge computing is a distributed information technology architecture wherein the image or video data is processed near the originating source, not on a centralized server or cloud. By inferring information from the AI computing module equipped with CCTVs and communicating only the processed information with the server, it is possible to reduce excessive network traffic. Small-object detection is an innovative method to detect different-sized objects by cropping the raw image and setting the appropriate number of rows and columns for image splitting based on the target object size. This enables the detection of small objects from cropped and magnified images. The detected small objects can then be expressed in the original image. In the inference process, this study used the YOLO-v5 algorithm, known for its fast processing speed and widely used for real-time object detection. This method could effectively detect large and even small objects that were difficult to detect with the existing object detection algorithms. When the large-scale site monitoring system was tested, it performed well in detecting small objects, such as workers in a large-scale view of construction sites, which were inaccurately detected by the existing algorithms. Our next goal is to incorporate various safety monitoring and risk analysis algorithms into this system, such as collision risk estimation, based on the time-to-collision concept, enabling the optimization of safety routes by accumulating workers' paths and inferring the risky areas based on workers' trajectory patterns. Through such developments, this continuous large-scale site monitoring system can guide a construction plant's safety management system more effectively.

  • PDF

Improvement Index and Characteristic for the Safety Management Level of Domestic Construction Companies (국내 건설회사의 안전관리수준 향상지수 및 특성 분석)

  • Son, Chang-Baek;Lee, Dong-Eun;Choi, Seung-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.4
    • /
    • pp.51-56
    • /
    • 2007
  • In order to present basic data for the balancing improvement of safety management level in domestic construction companies the improvement index and characteristic of safety management level are offered by comparing the year 2006's safety level with the year 2001's one. The companies under concern are classified into 51 large scale companies and 61 middle and small scale ones. The safety management level of both head office and construction sites is improved for all companies without regard to the scale. Specially, the improvement index of middle and small scale companies shows the higher rate than large ones and head office higher than construction sites.

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

Causes of Schedule Delays in Building Construction Projects in Vanuatu

  • Kim, Dae Young;Chi, Seokho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.641-651
    • /
    • 2015
  • With its recent tourism boom, Vanuatu, a small country in the South Pacific, is experiencing an increasing demand for construction. However, it has been struggling with persistent schedule delays in their construction projects due to a variety of reasons. In an attempt to respond to this situation, this paper aims to identify the major causes of schedule delays in building construction in Pacific island countries, with a focus on Vanuatu. To collect data on the factors affecting schedule delays, face-to-face interviews were conducted. Based on these, seven major causes of schedule delays, as selected by the majority of the participants, were identified and discussed to provide perceptive insights for future improvement opportunities. This paper attempts to help contractors with limited resources better understand the major causes of schedule delay in Vanuatu and achieve better performance in building projects.