• Title/Summary/Keyword: Small Construction

Search Result 2,470, Processing Time 0.027 seconds

Stream Eco-corridor Restoration by Out-aged Small Dam Removal - Focused on Gokreung River Gokreung 2 Small Dam Removal - (기능을 상실한 보 철거를 통한 하천생태통로 복원 - 곡릉천 곡릉2보 철거를 대상으로 -)

  • Ahn, Hong Kyu;Woo, Hyoseop;Rhee, Dong Seop;Kim, Kyu Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.2
    • /
    • pp.40-54
    • /
    • 2008
  • Small and large dams are installed in the course of a stream for maintaining the water level of the stream or obtaining agricultural water. Currently about 18,000 of them are installed in Korea to supply water. However, the environmental problems of small dams are well known : the interruption of stream eco-corridors, deterioration of water quality in the upper reaches of the small dam, changes in the habitats of riparian organisms, damages to the stream scenery. In a very few of these small dams artificial eco-corridors like fishways are installed, but the number is very minimal.Accordingly, to efficiently restore stream eco-corridors by removing these small dams, it will be necessary to closely examine physical impacts, such as changes in the riverbed and changes in the shape of the stream caused by the removal, chemical impacts, such as changes in water quality, and transport and accumulation of contaminated sediments and biological impacts, such as changes in the habitats of organisms, and develop related technologies in advance, and have these technologies verified through demonstration application in the sites. In this study, we analyzed the physical, chemical and ecological impacts of the removal of the above-mentioned small dams, and conducted a research on the demonstration small dam removal project for a spot investigation. As a result, the small dam removal will restore the eco-corridor, there by improving the habitat of fishes and crustaceans. The number of major underwater organisms inhabiting the Gokreungcheon, such as Korean spotted sleepers, Chinese minnows, Microphysogobio yaluensis, Abbottina rivularis, stone morokos, striped shinners, long-nosed barbels, and Chinese mitten crabs, is expected to increase, and the food chain in the ecosystem will improve so that species diversity will improve as well.

A Comparative Study on the Safety Management Level of Construction Companies (건설회사의 안전관리수준에 관한 비교연구)

  • Son, Chang-Baek;Hong, Sung-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.4
    • /
    • pp.160-167
    • /
    • 2002
  • In order to prepare effective safety management program, the evaluation of safety management level must be implemented. But research efforts on the safety management in Korea are limited to evaluate large construction companies. This study is initiated with the purpose of understanding safety management system in medium- and small-sized construction companies. The study performed questionnaire survey with 54 large companies, 46 medium- and small-sized ones. Employing 'Management Safety Health Index' of Maekyung Economic Institute, 34 questionnaire items were chosen by 9 associated experts. Based on the questionnaire survey, analyses were performed to compare safety management level between large companies as well as medium- and small-sized ones.

Analysis of worker's Ageing in Small-size Construction Sites in Busan (부산지역 소규모 건설현장 근로자의 고령화 실태조사 및 개선방안)

  • Lee, Sang-Ho;Huh, Young-Ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.12
    • /
    • pp.51-56
    • /
    • 2018
  • Due to the aging of economically active population in the world, the average age of workers in the domestic construction industry is also steadily increasing. This study analyzes the aging of construction workers in small-size construction sites in Busan, where the aging of the economically active population is the most severe in Korea. As a result of the study on the aging of construction workers in six construction sites with a construction cost of less than 500 million won in Busan, it was found that 65% of the workers were over 50 years of age. In addition, several experts interviews and survey revealed that 'securing welfare facilities for construction workers' and 'diminishing prejudice about the construction industry" were the most urgent and effective methods to overcome the aging problems. The results of this study can be served as basic data to solve the aging problems in the industry.

Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents (특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발)

  • Kang, Sang-Chan;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

A Study on Improvement Plans for Special Safety & Health Education Considering Small and Medium-sized Construction Sites (중소규모 건설현장을 고려한 특별안전보건교육의 개선방안에 대한 연구)

  • Hyeokrak Choi;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.473-478
    • /
    • 2023
  • The construction business has a high accident rate among all the industries, and it accounts for 68% of the total accident rate for the small and medium-sized construction sites where a safety manager is not appointed,. Thus, through effective safety management and education of the construction sites, the accident rate can be significantly reduced. This study proposed a plan to improve the system suitable for small and medium-sized construction sites by integration with the basic safety & health education system. Through previous research and survey, the improvement points of special safety & health education at small and medium-sized construction sites, and the preference for integration with basic safety & health education were analyzed.

The Improvement System of Safety Consulting Engineering for Construction Calamity Prevention (건설재해예방 기술지도의 효과 증진방안)

  • 이찬식;이민우;안홍섭;김일수
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.3
    • /
    • pp.155-162
    • /
    • 1999
  • Small and medium-sized construction sites are most serious in Occupational Safety and Health in the construction industry. The safety consulting engineering has been launched, in 1995, to improve the safety environments and prevent serious injuries and fatalities accidents. The purpose of this study is to analyze the effect of the safety consulting engineering for small and medium-sized construction sites. This study conducts a number of interviews with experienced contractors, consulting engineers, etc. And the questionnaire survey was peformed with 111 respondents. This paper presents several improvements to increase the efficiency of the safety consulting system.

  • PDF

A Study on Corporate Social Responsibility of Construction Companies (건설기업의 사회공헌활동에 관한 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.36-44
    • /
    • 2022
  • This study analyzed Corporate Social Responsibility (CSR hereafter) of construction companies, especially focusing on small-medium companies. Surveys on construction companies' CSR activities and intensive interview with experts were executed to analyze and draw some implications. The empirical results shows that most of construction companies feel keenly necessity of CSR. The level of small-medium companies' awareness is lower than that of large companies'. CEO and board members of small-medium companies are less concerned about CSR yet. Carrying CSR activities co-working with NGO is preferred because of expertise and network. This study also suggests future strategy for CSR in the construction industry, focusing on small-medium companies. First of all it is necessary for small-medium companies to enhance the level of awareness and encourage participation in CSR. Second, it is required to strengthen relation with NGO and share information for CSR. Third, it is really significant to strengthen budget support and secure personnel to activate CSR. The systematic support by gevernment is also important. Lastly, it is essential to mount a publicity campaign and develop various CSR program. The role of 'Construction Industry Foundation for Social Responsibility' is emphasized because small-medium companies have very little room for CSR.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

Guideline for Web 2.0 Cluster based Process and Performance Management System (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 구축에 따른 운영방안 제시)

  • Ong, Ho-Kyoung;Ahn, Jae-Gyu;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.899-904
    • /
    • 2007
  • Process management techniques are highly important in the construction industry. However, indicators or details of assessment which will show process management and its performance are still very insufficient. In particular, it is true that local corporations or small and medium sized companies suffer more difficulties than ones in metropolitan areas. Therefore, it is necessary to prepare a flexible process management and performance assessment system suited to field situations. This study identified problems of local small and medium sized companies, implemented a process and performance management system using the Lean concept, and systemized a web-based system. Also, the study proposed operational strategies so that small and medium construction companies may access and use the system easily. This will ensure the competitiveness of local small and medium sized companies, will pursue visible outcomes such as construction period reduction and construction cost reduction, and will be utilized as data related to performance assessment both during construction progress and after construction.

  • PDF

Implementation of Customized EPM for Collaborative Resource Procurement in Small and Medium Size Plant Construction Enterprises (중소플랜트기업의 협업자원조달을 위한 Customized EPM구현)

  • Nam, Jung-Tai;Kim, Sung-Hun;Han, Young-Geun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.133-141
    • /
    • 2008
  • The need for total enterprise management that covers from accepting orders, design, cost, procurement, manufacture, and delivery has been recently raised in order for efficient project management of small and medium size plant construction enterprises. This trend is reflected in the introduction of EPM(Enterprise Project Management) solutions by some shipbuilding enterprises and large construction corporations. In step with the trend, small and medium size plant construction enterprises are enabled to provide knowledge base in terms of reducing cost and production period and managing portfolio for accepting orders and attaining contract by inducing customized EPM This study presents a design of customized EPM based on a case study of a company. It exhibits a collaborative/collaboration resource-supply model which can be universally applied to small and medium size job-order production enterprises. The research discusses that under the assumption that information is shared internally between departments on planning, supply, manufacture, and quality control in order to create collaborative environment and close participation is created externally between suppliers and orderers, productivity can be improved in cost reduction through planning efficient collaborative supply model.