• Title/Summary/Keyword: Slope reinforcement

Search Result 286, Processing Time 0.023 seconds

Analysis of the Waterproof and Reinforcement Effect according to Slope Improvement of Aging Reservoir using Supplementary Cementitious Material (시멘트 대체재료를 사용한 노후 저수지의 사면 개량에 따른 차수 및 보강 효과 분석)

  • Song, Sang-Huwon;Cho, Dae-Sung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.1
    • /
    • pp.30-39
    • /
    • 2022
  • In this study, laboratory test, program analysis, and test construction in the field were performed to utilize Supplementary Cementitious Material (SCM) developed by recycled resources for slope reinforcement as slope improvement material for aging reservoir, and the results were analyzed. As results of the laboratory test, it was analyzed that the mixing ratio of SCM was appropriate by 9 %, and the coef. of permeability was decreased by about 10,000times, indicating a value close to that of the waterproof material applied in Korea. In addition, as a result of program analysis and test construction, it was analyzed that seepage did not occur in the part of reinforced using SCM and showed a higher safety facto r than domestic criteria. Therefore, since it shows sufficient waterproof and reinforcing effects in aging reservoir, it is judged that the slope improvement using SCM can replace the cement for repair and reinforcement method.

Stability Analysis of Marine Structure Foundation Constructed by Deep Mortar Piles (심층몰탈파일로 조성된 항만구조물 기초의 안정성 검토)

  • 천병식;여유현;김경민;양진석;김도식
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.228-233
    • /
    • 2001
  • In this case study, under conideration of field situations, such as increase of water level, height increment of the marine structure, dredging and backfill, the stability analysis of sliding and lateral flow of the marine structure in OOOharbor was carried out, and foundation reinforcement methods was presented. based on the results of site investigation, the stability analysis of slope sliding and lateral flow was performed as following. In section BH-1, 2, the analysis was performed in two cases that the marine structure was heightened and filled, and not heightened and filled. In section BH-1, 4, heightened and filled. The analysis results showed that the stabilities of slope sliding and lateral flow in section BH-1, 2, 3, 4 were unstable. After additional reinforcements with Deep Mortar Pile, the stabilities in section BH-1, 2, 3, 4 were evaluated as efficiently large.

  • PDF

A Case Study on the Slope Reinforcement by Improved Steel Pipe Nailing (개량 강관네일링 공법을 이용한 사면 보강사례 연구)

  • Choi, Dong-Nam;Lim, Heui-Dae;Song, Young-Su;Lee, Kyu-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.1 s.79
    • /
    • pp.54-60
    • /
    • 2007
  • This paper describes typical design and construction practice for in-situ ground reinforcement technique using improved steel pipe pressure grouting. A case history is presented to illustrate the benefit gained by application of the technique. This technique was applied to cut slopes developed in the construction of auxiliary spillway of 00 dam. Applicable conditions, method of survey, slope stability analysis and construction are given in this parer. As for the construction method, a procedure is given and the main points are the control of construction work. As a result of the pull-out test, it is shown that seel pipe nailing is particularly useful for stabilizing rock slope.

A Stability Analysis of Geosynthetics Reinforced Soil Slopes II - Evaluation of Required Reinforcement Tensile Force - (토목섬유 보강 성토사면의 안정해석 II. - 소요 보강재 인장력 평가 -)

  • Kim Kyeong-Mo;Kim Hong-Taek;Lee Eun-Soo;Kim Young-Yoon;Ahn Kwang-Kuk
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.8
    • /
    • pp.107-116
    • /
    • 2005
  • Generally, when the stability of the geosynthetic reinforced soil slopes is analyzed, the required tensile forces of each reinforcement layers are calculated from total reinforcement forces which are necessary to retain the equilibrium state of slip mass in which the slip surfaces are assumed to be a linear or bilinear. It is assumed that the reinforcement forces are increased or constant with depth. However, according to the instrumented field data and laboratory model test results, the maximum tensile strain of reinforcement in a reinforced soil slope is developed in a certain elevation, not a bottom of the slope. In the concept of reinforced soil, postulated failure surfaces are the traces of the position in which the reinforcement tensile forces are maximum in the layer, and the reinforcement tensile forces are related to the stress state on the postulated failure surface. Therefore, in this study, based on the distribution of normal stress on the slip surface, a new method for the evaluation of required tensile forces is suggested and a number of the instrumented field data are analyzed by newly suggested method. As a result, it is shown that the newly suggested method produces relatively accurate reinforcement tension forces.

Model experiments for the reinforcement method of agricultural reservoirs by overtopping

  • Lee, Young-Hak;Lee, Dal-Won;Heo, Joon;Ryu, Jung-Hyun
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.1
    • /
    • pp.163-171
    • /
    • 2020
  • In this study, a large laboratory model experiment was conducted with the aim of developing an embankment reinforcement method to prevent overtopping, which is the main cause for the failure of agricultural reservoirs. The model experiment was carried out with concrete and asphalt as a permanent reinforcement method and with geomembrane as the emergency method at a deteriorated homogeneous reservoir. Under the non-reinforced conditions, the pattern of the failure appeared in several scour directions from the downstream slope as the overtopping began, and the width and depth of the erosion were magnified as it gradually moved to the dam crest. Under the conditions reinforced with asphalt and concrete, the overtopping was stabilized. In the case of the concrete reinforcement, it was found that the slope of the riprap boundary exhibited downward erosion by the current; thus, it was necessary to construct an extension up to the riprap joint of the upstream and downstream sides to prevent the expansion of the failure. Under the conditions reinforced with the geomembrane sheet, the overtopping was stabilized, and no seepage was found that required the emergency reinforcement method. Asphalt, concrete, and geomembrane sheet reinforcements have been shown to be capable of delaying failure for about 1 hour and 40 minutes compared to the non-reinforcement conditions. The reinforcement method is considered to be a very effective method to prevent disasters during overtopping. The pore water pressure can be used as useful data to predict the risk of failure at an embankment.

A Study on Site investigation for Cut Slope Management Manual preparation (절토사면 유지관리 매뉴얼 작성을 위한 현장조사에 관한 연구)

  • Ji, Young-Hwan;Chang, Buhm-Soo;Kim, Yong-Soo;Lee, Jong-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.825-830
    • /
    • 2005
  • Cut slope and facility of management investigation is the protection of humans and properties. it is very important the prevention of disaster facility and the damage of the slope protection facility. It is very difficult to forecast slope stability, disaster possibility and collapse. It will be able to minimize the damage which it prepare against slope facility and cut slope of deformable investigation and collapse and the disaster. therefore those deformable investigation is important. Investigations execute upheaval, crack, sliding for slope and cut slope reinforcement. Investigation executes forecast in place where the construction problem, the effect which the damage in road traffic or the contiguity facility.

  • PDF

A Relative Study on Safe Factor by Different Analyses of Slope Stability (EPS공법에 의한 측방유동 저감효과에 관한 해석적 연구)

  • An, Joon-Hee;Jang, Jeong-Wook;Park, Choon-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1181-1186
    • /
    • 2006
  • This study analyzed the reductive effect of lateral flow by the section and height of reinforcement of EPS. The conclusions of the study are as follows. (1) The lateral flow increased as the section of reinforcement decreased. The reinforcement section that satisfied the allowable range of the lateral flow turned out to beapproximately 80% of the standard reinforcement section. (2) As reinforcement height was decreasing, the lateral flow increased. The reinforcement heigh that satisfied the allowable range of the lateral flow turned out to be approximately 50% of the total lateral height of abutment.

  • PDF

A Case Study on the Slope Collapse and Reinforcement Method of the Phyllite Slope (천매암 지역에서의 비탈면 붕괴 원인규명 및 보강대책 사례연구)

  • Cho, Younghun;Lim, Daesung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.8
    • /
    • pp.83-93
    • /
    • 2010
  • The purpose of this study is to present emergency rehabilitation, cause and the countermeasure of reinforcement about reinforced retaining wall and the slope collapse of the phyllite ground. The study area is broken easily because this area has rock mass discontinuity such as stratification, foliation, joint and fold. And this area consists of the ground where it happens easily to the failure of structure like reinforced retaining wall because of the phyllite ground sensitive to weathering. Counterweight fill in front of reinforced retaining wall was performed as emergency rehabilitation about displacement of reinforced retaining wall and the failure at the rear of slope on phyllite ground. After that, additional displacement didn't occur. Boring and geophysical exploration were launched to present emergency rehabilitation and develop the long-term method of reinforcement. This could grasp anticipated range of the failure section and identify internal and external factors of the cause of the slope collapse. Several methods of reinforcement were suggested by conducting the numerical analysis. When conducting design and construction of major structures at the ground which has complex discontinuities, the precise site investigation should be conducted. During construction, immediate action for over-displacement should be taken by performing the periodic measurement.

Strength and Ductility of R/C Columns with Welded Reinforcement Grids(II) - Focused on Comparisons with Columns Confined by Conventional Reinforcement (용접 띠철근으로 보강된 철근콘크리트 기둥의 강도와 연성(II) - 보편적인 띠철근 보강 기둥과의 비교를 중심으로)

  • ;Murat Saatcioglu;Mongi Grira
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.561-568
    • /
    • 1997
  • Conventional confinement reinforcement for rectangular columns consist of closely spaced perimeter hoops, overlapping hoops, and crossties. One of the potential alternatives to conventional reinforcement is a welded reinforcement grid, prefabricated to required size and volumetric ratio of transverse reinforcement. An experimental investigation was carried out to investigate the strength and deformability of reinforced concrete columns confined with welded reinforcement grids. The comparisons of the envelopes of experimental force-displacement hysteric relationships for columns confined by welded grids with analytically generated force-displacement curves for columns confined with conventional ties. In general, inelastic deformability beyond the peak, as indicate by the slope of the cuvers, was similar to those indicated by columns with conventional ties. The superior performance of columns with welded grids may be attributed to the improved confinement characteristics of grids associated with increased rigidity of welded ties.

  • PDF

Experimental Study on Load Transfer Characteristic by Adjacent Slope Excavation in a Jointed Rock Mass (절리암반에서 근접 사면굴착에 의한 하중전이특성에 대한 실험적 연구)

  • Lee, Jin-Wook;Lee, Sang-Duk
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.321-328
    • /
    • 2009
  • A optimal reinforcement in the joint rock slope excavation adjacent to an existing tunnel would be influenced by excavation distance from the tunnel, slope angel, and joint conditions but has been empirically determined so far. In this study, large scale model tests were conducted to find out the relationship between load translation on the excavation surface and bebavior of the tunnel according to excavation steps of the jointed rock slope. Consequently, two main parameters, joint dip and sloped angle were investigated in those model tests. From the test results, it was found that tunnel deformation was the largest one when the excavation of joints located closer to the tunnel crown or invert. Stability of the slope and the tunnel were varied in a certain excavation stage related to the angle of slope. In the future, based on results of this study the reinforcement method for the tunnel and slope safety in a jointed rock mass will be demonstrated.