• Title/Summary/Keyword: Skyline Analysis

Search Result 58, Processing Time 0.023 seconds

A Study on the Correlation between Spatial Distance and Cognitive Intensity of High-rise Buildings - Focusing on High-rise Buildings of More than 30 Stories in Seoul - (초고층 랜드마크의 공간적 거리 및 인지강도와의 상관성 분석 - 서울시 30층 이상 고층건물을 대상으로 -)

  • Byeon, Jae-Sang;Im, Seung-Bin;Joo, Shin-Ha
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.4
    • /
    • pp.90-104
    • /
    • 2007
  • Landmarks like high-rise building are one of the important elements for the enhancement of city identity and provides the hierarchy of city streets, playing a central and symbolic role in cities. Research on physical attribute of landmarks, such as height, distance, location and shape, which are suitable for a city scale, can help a city create a distinct image and maintain comprehensible structure. To achieve this purpose, it is necessary to understand the spatial and cognitive characteristics of a landmark for the establishment and management of it. The results of this study can be summarized as follows: 1. The level of representativeness of a landmark increases in proportion to the degree of cognitive intensity on it. The relation between representativeness and cognitive intensity can be explained as the log-function as follows: Log(the number of people who respond "It has representativeness")=$-1.2579+1.5908{\times}$(cognitive intensity); 2. There are a few differences based on the attributes of respondents: while gender has no distinct influence, residential period and age show statistically meaningful influence on cognitive intensity of a vertical landmark Cognitive intensity of an individual landmarks especially, differs according to the class of main users. Because of frequent changes in occupation or employment, respondents consider the distance from a residential area more important than the distance from a working area in evaluating cognitive intensity of landmarks; 3. landmark can be classified into two kinds: a district landmark and an urban landmark A district landmark is closely connected with physical attributes of the landmark itself, such as distance, size and height. An urban landmark is mainly related to cognitive attributes such as the image and identity of a city as a whole. As a result, the landmark analysis data in this research provides spatial order and identity in a city. It is difficult to establish and reinforce the image of a city as a single element ike a landmark. However, withy steady follow-up research, this study could be seen as a systematic and logical model to improve urban landscape and image.

Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers (저층·고층 아파트가 혼합배치된 단지에서 공기단축이 건설사업비에 미치는 영향 분석)

  • Bang, Jong-Dae;Chun, Young-Soo;Jun, Myoung-Hoon;Kim, Sa-Rang;Lee, Do-Heun
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.415-421
    • /
    • 2012
  • In case of Korean housing complex, there became more mixed arrangement of buildings with different number of layers for a variety of urban skyline, recently. For example, around 33% of the construction sites of 'A' public corporation have gaps of more than 4 layers between high-rise buildings and low-rise ones in the same site, according to the survey. Generally, construction duration of the housing complex is estimated based on the layers of the highest building. Due to this baseline, whole construction duration could be extended so that the project cost could be increased. Therefore, framework duration of higher-rise buildings should be reduced to secure the feasibility of the project. On the other hands, these shortenings could adversely harm the feasibility in some cases because there are a wide range of combinations of the buildings with different number of layers in designing housing complex. Therefore, this study shows the results of analysis on effects of framework time shortening on the cost in housing complex project. Moreover, this could set the baseline of checking possibilities in condensing the construction duration of projects with buildings of different layers by supplying comprehensive database.

Harvesting Cost of Tree-length Thinning in a Larix leptolepis Stands (낙엽송 간벌작업에서 전간수확시스템의 작업비용 분석)

  • Cho, Koo-Hyun;Cho, Min-Jae;Han, Han-Sup;Han, Sang-Kyun;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.2
    • /
    • pp.221-229
    • /
    • 2015
  • The purpose of study was to broaden our knowledge on the productivity and cost of thinning operations which has become increasingly practiced in Korea. The thinning operations were conducted in a 40-year old larch (Larix leptolepis) stand, including chainsaw felling and processing at the stump, followed by yarding tree-length logs using a Koller K301-4 tower yarder. The logs were further processed and sorted into 1.8 m and 3.6 m log piles at the landing. We used a standard time study method to evaluate key variables that affect the productivity of thinning operations. The total stump-to-pile operational cost was $41,707won/m^3$. The highest cost activity was the yarding phase which cost $20,083won/m^3$ (48.2% of the total cost), followed by the costs of processing treelength materials into marketable log lengths ($12,143won/m^3$; 29.1%), and then by the costs of sorting/piling the processed logs ($5,039won/m^3$; 12.1%). It was interesting to see that felling and processing trees at the stump had low costs at $1,315won/m^3$ (3.2%) and $3,127won/m^3$ (7.5%), respectively. We used the detailed time study data to develop regression equations which were to predict yarding productivity. Our analysis showed that harvesting system cost was highly sensitive to the number of logs, yarding distance and lateral distance per turn, respectively.

A Study on the Establishment of Visual Landscape Impact Factors for Natural Landscape Management (자연경관관리를 위한 시각적 경관영향 요소 설정에 관한 연구)

  • Shin, Min-Ji;Shin, Ji-Hoo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.4
    • /
    • pp.135-146
    • /
    • 2018
  • A Visual landscape planning and management system has been introduced and implemented by each ministry so as to solve the problems of visual landscape destruction due to recognition on the value of natural landscape of beautiful territory and various development projects. At present, this system emphasizes the importance of the visual and perceptual aspect of the landscape however, there is a lack of techniques required for comprehensively predicting, evaluating, and managing it. Furthermore, sustainable landscape management after the completion of development projects has been inadequately carried out, as the focus has been only on consultation in the planning process of the development project in institutional performance. To this end, we presented objective and standardized criteria to predict and judge the effects of development projects on landscapes before project implementation. During the implementation of the development project, the influence of the visual landscape becomes accumulated in the construction progress stage. There is a need to identify the main viewpoints and to examine the continuous changes in the landscape-influencing factors, owing to the remarkable influences on the landscape, such as the change in the topography and the change caused by the artificial structure. During the stage of managing the influence on the visual landscape after the completion of the project, the influence on landscape should be monitored by measuring the change in the continuous landscape-influencing factors and determining the extent to which the actual reduction plan has been implemented. These processes should be performed continuously to maintain the quality of the visual landscape. The change in the landscape caused by the development project is shown to cause relatively greater visual damage than other factors composing the landscape owing to the influence of the artificial factors including the structure or the building. This shows that not only detailed examination of the visual impact before the development project but also continuous management is required during and after the development project. For this purpose, we derived eight landscape-influencing factors including form/shape, line, color, texture, scale/volume, height, skyline, and landscape control point. The proposed considering to be of high utilization in that it has a clear target of the landscape influencing factors.

A Study on the Planting Improvement and Original Landscape of Gyeonghoeru Area in Gyongbokkung Palace (경복궁 경회루 권역의 식생경관원형과 개선에 관한 연구)

  • Kim, Choong-sik;Jeong, Seul-ki
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.6
    • /
    • pp.17-25
    • /
    • 2018
  • This study was conducted to calculate the optimum height of trees, estimating a model for the prediction of tree growth for the landscape improvement of the Gyeonghoeru area. For the verification of measures for management, this study conducted a photographic survey of the Gyeonghoeru area and used the Pressler's formula to examine the growth rate of the pine forest of Mansesan. The results of the study are as follows. First, as a result of a field survey and landscape analysis, trees in the Gyeonghoeru area are large ones with more than a diameter at breast height of 30cm, except for weeping cherry trees and persimmon trees, and especially, it is necessary to manage them or replace with small trees through the landscape of Mansesan, which screens the landscape and pruning the trees in the terraced flower garden in the north. Second, as a result of a measurement of the growth rate of trees, for 10 years on average, they grew up by 14% in source diameter and 5% in tree height 5% in south of Mansesan and by 7% in source diameter and 2.4% in tree height in the north of Mansesan. Furthermore, when a simulation was prepared based on the measured growth rate of trees, it was found out that 20 years later, on the landscape on the second floor of Gyeonghoeru, the pine forest of Mansesan would cut off the skyline of Mt. Inwang-san. Third, this study analyzed a landscape improvement simulation and proposed a plan for tree management to take a view of the landscape of the Gyeonghoeru area. This study has a significance that it drew an efficient planting maintenance policy, considering the landscape characteristics of the Gyeonghoeru area.

Downscaling of Sunshine Duration for a Complex Terrain Based on the Shaded Relief Image and the Sky Condition (하늘상태와 음영기복도에 근거한 복잡지형의 일조시간 분포 상세화)

  • Kim, Seung-Ho;Yun, Jin I.
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.18 no.4
    • /
    • pp.233-241
    • /
    • 2016
  • Experiments were carried out to quantify the topographic effects on attenuation of sunshine in complex terrain and the results are expected to help convert the coarse resolution sunshine duration information provided by the Korea Meteorological Administration (KMA) into a detailed map reflecting the terrain characteristics of mountainous watershed. Hourly shaded relief images for one year, each pixel consisting of 0 to 255 brightness value, were constructed by applying techniques of shadow modeling and skyline analysis to the 3m resolution digital elevation model for an experimental watershed on the southern slope of Mt. Jiri in Korea. By using a bimetal sunshine recorder, sunshine duration was measured at three points with different terrain conditions in the watershed from May 15, 2015 to May 14, 2016. The brightness values of the 3 corresponding pixel points on the shaded relief map were extracted and regressed to the measured sunshine duration, resulting in a brightness-sunshine duration response curve for a clear day. We devised a method to calibrate this curve equation according to sky condition categorized by cloud amount and used it to derive an empirical model for estimating sunshine duration over a complex terrain. When the performance of this model was compared with a conventional scheme for estimating sunshine duration over a horizontal plane, the estimation bias was improved remarkably and the root mean square error for daily sunshine hour was 1.7hr, which is a reduction by 37% from the conventional method. In order to apply this model to a given area, the clear-sky sunshine duration of each pixel should be produced on hourly intervals first, by driving the curve equation with the hourly shaded relief image of the area. Next, the cloud effect is corrected by 3-hourly 'sky condition' of the KMA digital forecast products. Finally, daily sunshine hour can be obtained by accumulating the hourly sunshine duration. A detailed sunshine duration distribution of 3m horizontal resolution was obtained by applying this procedure to the experimental watershed.

Study on the Treesize Prediction Model : A case study of Zelkova serrata, Pinus strobus and Magnolia denudata (주요조경수목의 크기 예측 " 모델 "에 관한 연구 : 느티나무, 스트로브잣나무, 백목련을 대상으로)

  • 김남춘;최준수;문석기
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.16 no.1
    • /
    • pp.27-35
    • /
    • 1988
  • Size characteristics of three widely used landscape trees were analized to establish a methodology of size prediction as time Passes. Tree height, tree width, stem diameter(breast or surface), canopy length and tree age were measured directly and indirectly(by using photograph), and the data were analized by using regression analysis through PC-SAS. The results are summarized as follows : 1. Zelkova serrata MAKINO showed relatively slow growth rate and the tree form was changed as aged. Size predictions were available by using the regression equations listed below : Surface diameter = 0.8293 x AGE Tree height = 0.4109(0.8293 x AGE) - 0.0039(0.7273 x AGE)$^2$Tree width = 0.3240(0.8293 x AGE) - 0.0024(0.1293 x AGE)$^2$Canopy length = 0.1337(0.8293 x AGE) - 0.0020(0.7293 x AGE)$^2$2. Pinus strobus L. showed relatively fast growth rate and the tree form did not change much as aged. Size predictions were available by using the regression equations listed below. Breast diameter = 0.756 x AGE Tree height = 0.7695(0.756 x AGE) - 0.0164(0.75\ulcorner x AGE)$^2$Tree width = 0.4331(0.756 x AGE) - 0.0079(0.75\ulcorner x AGE)$^2$Canopy length = 0.1365(0.756 x AGE) - 0.0032(0.75f x AGE)$^2$ 3. In case of Magnolia denudata DESROUX, tree form was determined relatively earlier than the other two species. Si2e predictions were available by using the regression equations listed below : Surface diameter = 0.88 x AGE Tree height = 0.5412(0.88 x AGE) - 0.0110(0.88 x AGE)$^2$ Tree width = 0.3752(0.88 x AGE) - 7.0061(0.88 x AGE)$^2$Canopy length = 0.1110(0.88 x AGE) - 0.0022(0.88 x AGE)$^2$ This study aimed to find a way to predict size change of landscaping plants. This methodology will be applied to a wide range of landscape plants to provide practical data to landscape designers.

  • PDF

A Study on the Characteristics of Projects Following the Promotion of Private Park Special Projects (민간공원특례사업의 추진에 따른 사업특성에 관한 연구)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.5
    • /
    • pp.112-124
    • /
    • 2021
  • This study was conducted to examine and analyze local governments, park status, project characteristics, and the implementation in detail for private park special projects across the country as a means of responding to the sunsetting of urban parks. As a result of the analysis, first, the private park special project, was found to be mainly implemented in cities with a population of more than 100,000, so there was a limit to the application on military installations or in local small cities. Therefore, rather than applying the special system collectively, it was judged that institutional flexibility, considering the characteristics and size of local government, was needed. Second, the current special projects by the park creation donation collection method shows monotonous development centered on apartment houses, so it is necessary to diversify the development by introducing a park preservation method that purchases and donates park sites. Third, it was found that the area standard needs to be eased to less than 50,000m2 to include parks with high utilization and good accessibility in urban areas of large cities, as the type and area of parks are limited. Fourth, most special projects are mountain parks, which are feared to damage the natural terrain and skyline, so separate ordinances should be established and applied, and development approaches should be made to allow nature and parks to coexist with the setting of detailed building guidelines for each type of facility. The guidelines should include, first, after the nationwide private park special projects are completed, standards for appropriate returns for similar projects should be established, institutional standards such as the recovery of excess profits should be established, and environmental reviews should be conducted. Second, it was found that local governments should institutionalize the composition of private consultations to promote the efficient management of projects through a cooperative system, and third, a roadmap for maintenance after the donation of special parks should be established.