• Title/Summary/Keyword: Site Risk

Search Result 1,338, Processing Time 0.032 seconds

Potential Human Health and Fish Risks Associated with Hypothetical Contaminated Sediments Using a Risk Assessment Model ($TrophicTrace^{(R)}$) (위험평가모형($TrophicTrace^{(R)}$)을 이용한 가상 해양오염퇴적물의 쥐노래미와 인체 영향 예비평가)

  • Yang, Dong-Beom;Hong, Gi-Hoon;Kim, Kyung-Ryon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.1
    • /
    • pp.60-70
    • /
    • 2011
  • The sediment removal index derived from the chemical contaminants, $CI_{HC}$, is currently in use to identify and define the spatial extent of the contaminated sediments in the sea. In order to analyze the sensitivity of the ecological and human risk associated with contaminated sediment, we evaluated five hypothetical contaminated sediments, whose $CI_{HC}$ values are identical but consisted of different contaminant contents, using $TrophicTrace^{(R)}$ model dedicated to evaluate sediment risk, against the resident greenling (Hexagrammos otakii) and humans by calculating No-Observed-Adverse-Effect-Level based Toxicity Quotient (NOAEL TQ) and Lowest-Observed-Adverse-Effect-Level based Toxicity Quotient (LOAEL TQ), and cancer risks and hazard indices (HI), respectively, based on the site conceptual model and exposure assumptions of fish ingestion to human receptor populations. NOAEL and LOAEL TQ values varied as much as a factor of 2 among 5 hypothetical sediments. Chemical element specific contribution to the carcinogenic risk and HI varied also greatly in these sediments. The reason for this significant dissimilarity in ecological and human risk stems from the different risk of each contaminant to the resident fish and human receptor. When the conceptual food web model is constructed for the target biological species for a given site, the ecological and human risk analysis considering trophic transfer of contaminants will add a ecosystem based tool for the management of contaminated sediments.

Estimation of the Relative Risk of the Elderly with Different Evacuation Velocity in a Toxic Gas Leakage Accident (독성물질 누출 시 대피 속도 차이에 따른 고령자의 상대적 위험도 산정)

  • Lee, H.T.;Kwak, J.;Park, J.;Ryu, J.;Lee, J.;Jung, Seungho
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.6
    • /
    • pp.13-21
    • /
    • 2019
  • Leakage accidents in businesses dealing with hazardous chemicals can have a great impact on the workers inside the workplace, as well as residents outside the workplace. In fact, there were cases where hazardous chemicals leaked from many businesses. As a result, the Chemicals Control Act(CCA) was enacted in 2015, the Ministry of Environment introduced an Off-site Risk Assessment(ORA). The purpose of the ORA is to secure safety from the installation of the design of the workplace facilities so that chemical accidents of hazardous chemical handling facilities do not cause human or physical damage outside the workplace. In general, the ORA qualitatively determines where a protected facility is within the scope of the accident scenario. However, elderly who belong to the sensitive group is more sensitive than the general group under the same chemical accident effect, and the extent of the damage is serious. According to data from the Korea National Statistic Office, the number of elderly people is expected to increase steadily. Therefore, a quantitative risk analysis considering the elderly is necessary as a result of a chemical accident. In this study, accident scenarios for 14 locations were set up to perform emergency evacuation due to toxic gas leakage of Cl2(Chlorine) and HF(Hydrogen Fluoride), and the effects of exposure were analyzed based on the evacuation velocity difference of age 20s and 60s. The ALOHA(Areal Locations of Hazardous Atmospheres) program was used to calculate the concentration for assessing the effects. The time of exposure to toxic gas was calculated based on the time it took for the evacuation to run from the start point to the desired point and a methodology was devised that could be applied to the risk calculation. As a result of the study, the relative risk of the elderly, the sensitive group, needs to be determined.

Development of web-based system for ground excavation impact prediction and risk assessment (웹기반 굴착 영향도 예측 및 위험도 평가 시스템 개발)

  • Park, Jae Hoon;Lee, Ho;Kim, Chang Yong;Park, Chi Myeon;Kim, Ji Eun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.559-575
    • /
    • 2021
  • Due to the increase in ground excavation work, the possibility of ground subsidence accidents is increasing. And it is very difficult to prevent these risk fundamentally through institutional reinforcement such as the special law for underground safety management. As for the various cases of urban ground excavation practice, the ground subsidence behavior characteristics which is predicted using various information before excavation showed a considerable difference that could not be ignored compared to the results real construction data. Changes in site conditions such as seasonal differences in design and construction period, changes in construction methods depending on the site conditions and long-term construction suspension due to various reasons could be considered as the main causes. As the countermeasures, the safety management system through various construction information is introduced, but there is still no suitable system which can predict the effect of excavation and risk assessment. In this study, a web-based system was developed in order to predict the degree of impact on the ground subsidence and surrounding structures in advance before ground excavation and evaluate the risk in the design and construction of urban ground excavation projects. A system was built using time series analysis technique that can predict the current and future behavior characteristics such as ground water level and settlement based on past field construction records with field monitoring data. It was presented as a geotechnical data visualization (GDV) technology for risk reduction and disaster management based on web-based system, Using this newly developed web-based assessment system, it is possible to predict ground excavation impact prediction and risk assessment.

A study on the risk assessment based on the semi-quantitative methodology (준 정량적 방법의 위험성 평가에 대한 연구)

  • Jung, Da-Woon;Oh, Sang-Min;Yoo, Deung-Ryeol;Seo, Jung-Wook;Kim, Du-Ill
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1425-1432
    • /
    • 2011
  • The various risk assessment methodologies have been introduced in the railway industries. The risk assessment suggested by CENELEC are described with two ways; quantitative and qualitative methods. However, in the industry application level, the quantitative method is hard to apply for a project because of somehow complicated or few statistical figures which was driven from the on-site and the qualitative method is too subject to have the confidence of its results fully. In this paper, the state-of-the-art methods which were suggested in Europe recently are introduced and compared to existing quantitative and qualitative methods. Furthermore, the application measures of railway projects are investigated.

  • PDF

Measurement and Analysis of the Dangerous Voltage Around Grounding Electrode for Safety in Substation Ground (변전소 접지설계를 위한 접지전극 주변의 위험전압 측정과 분석)

  • Son, Seok-Geum;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.4
    • /
    • pp.214-219
    • /
    • 2011
  • The substation grounding design,"IEEE Guide for Safety in AC Substation Grounding (ANSI / IEEE Std 80)"has been widely used. Substation grounding design and substation grounding resistance of grounding network site to predict the voltage at the risk of a very important task, which is a ground fault current due to the influx of the ground network and due to rise in the Earth's potential can be applied to human dangerous Voltage within safe tolerances be configured to be the ground because the network. IEEE Std. 80 for the substation construction safety equipment on the ground securing the ground electrode and the mesh around the boundary potential distribution in terms of risk analysis by the touch voltage and the reference was to clean up the definition and the basic steps of the voltage of the voltage limits the risk of peripheral grounding electrode Suppression by the simulator through a new secure from dangerous voltage design techniques were presented.

Quantitative Risk Assessment based on Fault Tree Analysis for Gangform Accident (갱폼 재해의 FTA를 통한 정량적 위험성 산정에 관한 연구)

  • Ham, Young Jong;Kee, Jung Hun;Park, Jong Yil
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.40-47
    • /
    • 2020
  • Although gangform has good workability due to the integration of outer wall forms and working platforms, 22 workers were died from 21 gangform related accidents during 2012 to 2016. Quantitative risk assessment is required for evident based prevention measure selection. In this study, based on 52 accident data from 2004 to the first half of 2019, FTA is conducted for probabilities of direct causes and their contribution to accidents. Three stages are considered; gangform installation, dismantling and lifting, and using. The effectiveness of countermeasures is evaluated through minimum cut set, RAW and RRW. Complete assembly of gangform on the ground level, detailed planning, and fall prevention device are suggested as prevention measures for installation, dismantling and lifting, and using stages, respectively.

A GIS-Based Regional Risk Analysis Approach for Bridges (GSIS를 이용한 교량의 안전관리시스템 구축)

  • Kim, Seong-Hun
    • 한국지형공간정보학회:학술대회논문집
    • /
    • 1994.11a
    • /
    • pp.32-42
    • /
    • 1994
  • A GIS-based regional risk analysis program to interactively study the vulnerability of bridges in a regional highway network is described. The analysis utilizes three major components. The use of a GIS system as the integrating environment to display geographic data, to handle inquiries and to display the results of a query. A risk model for bridges which can predict the level of damage due to a particular intensity of ground motion at a bridge site. A ground motion attenuation model to predict the intensity of ground motion at a particular bridge. The interactive components are supported by data files which encode characteristics such as potential earthquake sources and magnitudes, and characteristics of the bridges which are important for damage and failure analysis.

  • PDF

Gastrointestinal Stromal Tumors: A Clinicopathologic and Risk Stratification Study of 255 Cases from Pakistan and Review of Literature

  • Din, Nasir Ud;Ahmad, Zubair;Arshad, Huma;Idrees, Romana;Kayani, Naila
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.12
    • /
    • pp.4873-4880
    • /
    • 2015
  • Purpose: To describe the clinicopathological features of gastrointestinal stromal tumors (GIST) diagnosed in our section and to perform risk stratification of our cases by assigning them to specific risk categories and groups for disease progression based on proposals by Fletcher et al and Miettinen and Lasota. Materials and Results: We retrieved 255 cases of GIST diagnosed between 2003 and 2014. Over 59% were male. The age range was 16 to 83 years with a mean of 51 years. Over 70% occurred between 40 and 70 years of age. Average diameter of tumors was 10 cms. The stomach was the most common site accounting for about 40%. EGISTs constituted about 16%. On histologic examination, spindle cell morphology was seen in almost of 85% cases. CD117 was the most useful immunohistochemical antibody, positive in 98%. Risk stratification was possible for 220 cases. Based on Fletcher's consensus proposal, 62.3 gastric, 81.8% duodenal, 68% small intestinal, 72% colorectal and 89% EGISTs were assigned to the high risk category; while based on Miettinen and Lasota's algorithm, about 48% gastric, 100% duodenal, 76% small intestinal, 100% colorectal and 100% EGISTs in our study were associated with high risk for disease progression, tumor metastasis and tumor related death. Follow up was available in 95 patients; 26 were dead and 69 alive at follow up. Most of the patients who died had high risk disease and on average death occurred just a few months to a maximum of one to two years after initial surgical resection. Conclusions: Epidemiological and morphologic findings in our study were similar to international published data. The majority of cases in our study belonged to the high risk category.

Pathologic Risk Factors and Oncologic Outcomes in Early-stage Cervical Cancer Patients Treated by Radical Hysterectomy and Pelvic Lymphadenectomy at a Thai University Hospital: A 7 year Retrospective Review

  • Ruengkhachorn, Irene;Therasakvichya, Suwanit;Warnnissorn, Malee;Leelaphatanadit, Chairat;Sangkarat, Suthi;Srisombat, Jutatip
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.14
    • /
    • pp.5951-5956
    • /
    • 2015
  • Background: To evaluate the rate of pathologic high-risk factors, intermediate-risk factors, and treatment outcomes in early-stage cervical cancer patients undergoing radical hysterectomy and pelvic lymphadenectomy (RHPL). Materials and Methods: Medical records of stage IA-IIA1 cervical cancer patients who underwent RHPL during the 2006 to 2012 time period and patient follow-up data until December 2013 were reviewed. Results: Of 331 patients, 52 women (15.7%) had pathologic high-risk factors and 59 women (17.8%) had intermediate-risk factors without high-risk factors. All studied patients had an initial complete response. At median follow-up time of 40.9 months (range 1-103.3 months) and mean follow-up time of$ 43.3{\pm}25.3$ months, 37 women had disease recurrence and 4 women had died of disease. The most common site of recurrence was the pelvis (64.8%). Five-year and 10-year disease free survival rates were 96.1% and 91.5%, respectively. Five-year and 10-year overall survival rates were 100% and 99.4%, respectively. Independent factors related to recurrence were pelvic node metastasis (odds ratio [OR], 2.670; 95%CI, 1.001-7.119), and >1/3 cervical stromal invasion (OR, 3.763; 95%CI, 1.483-9.549). Conclusions: The rates of pathologic high-risk and intermediate-risk factors should be considered and disclosed when counseling patients regarding primary treatment by RHPL. Oncologic outcomes of primary surgical treatment for early-stage cervical carcinoma were found to be excellent.

Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.