• Title/Summary/Keyword: Site Risk

Search Result 1,338, Processing Time 0.029 seconds

A Study on the Hazard Area of Bunkering for Ammonia Fueled Vessel (암모니아 연료추진 선박의 벙커링 누출 영향에 관한 연구)

  • Ilsup Shin;Jeongmin Cheon;Jihyun Lee
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.7
    • /
    • pp.964-970
    • /
    • 2023
  • As part of the International Maritime Organization ef orts to reduce greenhouse gas emissions, the maritime industry is exploring low-carbon fuels such as liquefied natural gas and methanol, as well as zero-carbon fuels such as hydrogen and ammonia, evaluating them as environmentally friendly alternatives. Particularly, ammonia has substantial operational experience as cargo on transport ships, and ammonia ship engines are expected to be available in the second half of 2024, making it relatively accessible for commercial use. However, overcoming the toxicity challenges associated with using ammonia as a fuel is imperative. Detection is possible at levels as low as 5 ppm through olfactory senses, and exposure to concentrations exceeding 300 ppm for more than 30 min can result in irreparable harm. Using the KORA program provided by the Chemical Safety Agency, an assessment of the potential risks arising from leaks during ammonia bunkering was conducted. A 1-min leak could lead to a 5 ppm impact within a radius of approximately 7.5 km, affecting key areas in Busan, a major city. Furthermore, the potentially lethal concentration of 300 ppm could have severe consequences in densely populated areas and schools near the bunkering site. Therefore, given the absence of regulations related to ammonia bunkering, the potential for widespread toxicity from even minor leaks highlights the requirement for the development of legislation. Establishing an integrated system involving local governments, fire departments, and environmental agencies is crucial for addressing the potential impacts and ensuring the safety of ammonia bunkering operations.

Perception Survey Study on High-level Radioactive Waste: Targeting Local Residents in Gijang-gun, Busan (고준위방사성폐기물에 대한 인식 조사 연구: 부산 기장군 지역 주민을 대상으로)

  • Yeon-Hee Kang;Sung Hee Yang;Yong In Cho;Jung-Hoon Kim
    • Journal of the Korean Society of Radiology
    • /
    • v.17 no.6
    • /
    • pp.947-955
    • /
    • 2023
  • This study was conducted to investigate the awareness of spent nuclear fuel among residents in nuclear power plant areas and use it as basic data for establishing a disposal facility for high-level radioactive waste. 204 questionnaires collected online were analyzed using SPSS Window Ver 28.0. To verify differences between groups, t-test and one-way ANOVA were performed. And correlation analysis was conducted to confirm the relationship between variables. As a result, first, risk perception regarding nuclear-related accidents showed statistically significant differences depending on gender and educational level. The position on the construction of a permanent disposal facility for spent nuclear fuel showed a statistically significant difference depending on gender, education, and age, and the perception of the importance of each evaluation standard for establishing a spent nuclear fuel management plan showed a statistically significant difference depending on education and age. In terms of trust in information-providing institutions, trust in the National Assembly was found to be the lowest. Second, the results of the correlation analysis between variables showed that local residents are aware that an alternative to the current disposal of spent nuclear fuel is needed, and that financial support for the construction of a permanent disposal facility is needed. Therefore, in order to build a high-level radioactive waste disposal site, it is believed that it is necessary to increase trust in the government, collect opinions from local residents, and provide economic support.

Correlations between the group velocity of time-reversed Lamb waves and cortical bone properties in tibial cortical bone in vivo (생체 내 경골의 피질골에서 시간역전 램파의 군속도와 피질골 특성 사이의 상관관계)

  • Kang Il Lee
    • The Journal of the Acoustical Society of Korea
    • /
    • v.42 no.6
    • /
    • pp.559-564
    • /
    • 2023
  • It is known that change in the bone strength of cortical bone constituting the outer shell of long bones such as the tibia or radius due to aging and osteoporosis is a risk factor for fracture. In this study, the group velocity of time-reversed Lamb waves generated in tibial cortical bone in vivo was measured using a time reversal method, and the correlations of the group velocity with the cortical bone thickness (cTh) and cortical bone mineral density (cBMD) closely related to the bone strength were investigated. It was found that the group velocity of time-reversed Lamb waves measured in the right tibia of 7 subjects showed a very high correlation, r = 0.90 (p < 0.0001), with the cTh and a relatively low correlation, r = 0.69 (p < 0.0001), with the cBMD. A limitation of this in vivo study is that the group velocity of time-reversed Lamb waves was measured for a normal group consisting of only 7 healthy adults. In the future, if the clinical usefulness of the time-reversed Lamb wave is demonstrated by follow-up studies on normal and osteoporotic groups consisting of a large number of healthy adults and osteoporotic patients, respectively, it is expected to improve the reliability of quantitative ultrasound technology for osteoporosis diagnosis. In addition, it is necessary to expand the skeletal site for measuring the group velocity of time-reversed Lamb waves not only to the tibia but also to the femur or radius.

A Study on the Methodology for Analyzing the Effectiveness of Traffic Safety Facilities Using Drone Images (드론 영상기반 교통안전시설 효과분석 방법론 연구)

  • Yong Woo Park;Yang Jung Kim;Shin Hyoung Park
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.5
    • /
    • pp.74-91
    • /
    • 2023
  • Several that analyzed the effectiveness of traffic safety facilities a method of comparing changes in the number of accidents, accident severity, speed through traffic accident data before and after installation or speed data collected from vehicle detection systems (VDS). , when traffic accident data is used, it takes a long time to collect because must be collected for at least one year before and after installation. , the road environment may change during this period, such as the addition of other traffic safety facilities in addition to the facilities to be analyzed. , the location of the VDSs for speed data is often different from the location where analysis is required, and there is a problem in that the investigators are exposed to the risk of traffic accident during on-site investigation. Therefore, this study a case study by establishing a methodology to determine effectiveness video images with a drone, extracting data using a program, and comparing vehicle driving speeds before and after speed reduction facilities. Vehicle speed surveys using drones are much safer than observational surveys conducted on highways and have the advantage of tracking speed changes along the vehicle, it is expected that they will be used for various traffic surveys in the future.

Assessment of Safety Climate Metrics in Construction Safety Management (건설 안전관리를 위한 Safety Climate 평가요인별 중요도 분석 연구)

  • Han, Bum-Jin;Kim, Taehui;Son, Seunghyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.607-618
    • /
    • 2023
  • Pervasive research underscores the direct correlation between an enhanced safety climate and a marked reduction in accidents. The intricacies of safety climate are governed by three pivotal strata: organizational management, on-site operations, and the broader enterprise framework. Within an organizational context, sustaining optimal performance across these layers poses a considerable challenge, often attributable to the constraints of available managerial bandwidth. It becomes imperative, then, to conceive a phased enhancement blueprint for the safety climate. To orchestrate this blueprint with precision, a discerning understanding of the hierarchy of safety climate metrics is essential, which subsequently guides judicious managerial resource allocation. This investigation is anchored in elucidating the hierarchical significance of safety climate metrics through the Analytical Hierarchy Process(AHP). Implementing the AHP framework, both a questionnaire was disseminated and a subsequent analysis undertaken, culminating in the extraction of relative priorities of safety climate determinants. Consequent to this analysis, "workers' safety prioritization and risk aversion" emerged as the foremost dimension, holding a significance weight of 0.1900. Furthermore, within the detailed elements, "unwavering adherence to safety mandates amidst demanding operational constraints" ranked supreme, manifesting a weight of 0.6663. The findings encapsulated in this study are poised to be foundational in sculpting improvements at an institutional level and devising policies, all with the end goal of fostering an exemplar safety climate within construction arenas.

Time-series Change Analysis of Quarry using UAV and Aerial LiDAR (UAV와 LiDAR를 활용한 토석채취지의 시계열 변화 분석)

  • Dong-Hwan Park;Woo-Dam Sim
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.27 no.2
    • /
    • pp.34-44
    • /
    • 2024
  • Recently, due to abnormal climate caused by climate change, natural disasters such as floods, landslides, and soil outflows are rapidly increasing. In Korea, more than 63% of the land is vulnerable to slope disasters due to the geographical characteristics of mountainous areas, and in particular, Quarry mines soil and rocks, so there is a high risk of landslides not only inside the workplace but also outside.Accordingly, this study built a DEM using UAV and aviation LiDAR for monitoring the quarry, conducted a time series change analysis, and proposed an optimal DEM construction method for monitoring the soil collection site. For DEM construction, UAV and LiDAR-based Point Cloud were built, and the ground was extracted using three algorithms: Aggressive Classification (AC), Conservative Classification (CC), and Standard Classification (SC). UAV and LiDAR-based DEM constructed according to the algorithm evaluated accuracy through comparison with digital map-based DEM.

Analysis of Infrared Characteristics According to Common Depth Using RP Images Converted into Numerical Data (수치 데이터로 변환된 RP 이미지를 활용하여 공동 깊이에 따른 적외선 특성 분석)

  • Jang, Byeong-Su;Kim, YoungSeok;Kim, Sewon;Choi, Hyun-Jun;Yoon, Hyung-Koo
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.3
    • /
    • pp.77-84
    • /
    • 2024
  • Aging and damaged underground utilities cause cavity and ground subsidence under roads, which can cause economic losses and risk user safety. This study used infrared cameras to assess the thermal characteristics of such cavities and evaluate their reliability using a CNN algorithm. PVC pipes were embedded at various depths in a test site measuring 400 cm × 50 cm × 40 cm. Concrete blocks were used to simulate road surfaces, and measurements were taken from 4 PM to noon the following day. The initial temperatures measured by the infrared camera were 43.7℃, 43.8℃, and 41.9℃, reflecting atmospheric temperature changes during the measurement period. The RP algorithm generates images in four resolutions, i.e., 10,000 × 10,000, 2,000 × 2,000, 1,000 × 1,000, and 100 × 100 pixels. The accuracy of the CNN model using RP images as input was 99%, 97%, 98%, and 96%, respectively. These results represent a considerable improvement over the 73% accuracy obtained using time-series images, with an improvement greater than 20% when using the RP algorithm-based inputs.

Surgical Outcomes of Cervical Esophageal Cancer: A Single-Center Experience

  • Yoonseo Lee;Jeonghee Yun;Yeong Jeong Jeon;Junghee Lee;Seong Yong Park;Jong Ho Cho;Hong Kwan Kim;Yong Soo Choi;Young Mog Shim
    • Journal of Chest Surgery
    • /
    • v.57 no.1
    • /
    • pp.62-69
    • /
    • 2024
  • Background: Cervical esophageal cancer is a rare malignancy that requires specialized care. While definitive chemoradiation is the standard treatment approach, surgery remains a valuable option for certain patients. This study examined the surgical outcomes of patients with cervical esophageal cancer. Methods: The study involved a retrospective review and analysis of 24 patients with cervical esophageal cancer. These patients underwent surgical resection between September 1994 and December 2018. Results: The mean age of the patients was 61.0±10.2 years, and 22 (91.7%) of them were male. Furthermore, 21 patients (87.5%) had T3 or T4 tumors, and 11 (45.8%) exhibited lymph node metastasis. Gastric pull-up with esophagectomy was performed for 19 patients (79.2%), while 5 (20.8%) underwent free jejunal graft with cervical esophagectomy. The 30-day operative mortality rate was 8.3%. During the follow-up period, complications included leakage at the anastomotic site in 9 cases (37.5%) and graft necrosis of the gastric conduit in 1 case. Progression to oral feeding was achieved in 20 patients (83.3%). Fifteen patients (62.5%) displayed tumor recurrence. The median time from surgery to recurrence was 10.5 months, and the 1-year recurrence rate was 73.3%. The 1-year and 3-year survival rates were 75% and 33.3%, respectively, with a median survival period of 17 months. Conclusion: Patients with cervical esophageal cancer who underwent surgical resection faced unfavorable outcomes and relatively poor survival. The selection of cases and decision to proceed with surgery should be made cautiously, considering the risk of severe complications.

A Study on Monitoring Surface Displacement Using SAR Data from Satellite to Aid Underground Construction in Urban Areas (위성 SAR 자료를 활용한 도심지 지하 교통 인프라 건설에 따른 지표 변위 모니터링 적용성 연구)

  • Woo-Seok Kim;Sung-Pil Hwang;Wan-Kyu Yoo;Norikazu Shimizu;Chang-Yong Kim
    • The Journal of Engineering Geology
    • /
    • v.34 no.1
    • /
    • pp.39-49
    • /
    • 2024
  • The construction of underground infrastructure is garnering growing increasing research attention owing to population concentration and infrastructure overcrowding in urban areas. An important associated task is establishing a monitoring system to evaluate stability during infrastructure construction and operation, which relies on developing techniques for ground investigation that can evaluate ground stability, verify design validity, predict risk, facilitate safe operation management, and reduce construction costs. The method proposed here uses satellite imaging in a cost-effective and accurate ground investigation technique that can be applied over a wide area during the construction and operation of infrastructure. In this study, analysis was performed using Synthetic Aperture Radar (SAR) data with the time-series radar interferometric technique to observe surface displacement during the construction of urban underground roads. As a result, it was confirmed that continuous surface displacement was occurring at some locations. In the future, comparing and analyzing on-site measurement data with the points of interest would aid in confirming whether displacement occurs due to tunnel excavation and assist in estimating the extent of excavation impact zones.

Delayed Bilateral Common Femoral Pseudoaneurysm after Percutaneous Access with Interventional Management: A Case Report (경피적 접근을 통한 시술 후에 발생한 지연성 양측 총대퇴 가성동맥류 및 인터벤션 치료: 증례 보고)

  • Sang Hoon Lee;Doo Ri Kim;Jeong Sub Lee;In Chul Nam;Su Yeon Ko
    • Journal of the Korean Society of Radiology
    • /
    • v.84 no.3
    • /
    • pp.705-712
    • /
    • 2023
  • Common femoral artery pseudoaneurysm is a potentially serious complication of peripheral angiography. There have been few prior reports of simultaneous pseudoaneurysm in both common femoral arteries after percutaneous access. Here we report the case of a 58-year-old male patient who presented with phlegmon or abscess a few days after bilateral femoral access, after which newly developed bilateral femoral pseudoaneurysm with wide neck was observed on CT angiography 2 months after infection treatment. Because the patient refused surgery for pseudoaneurysm, a stent-graft was inserted in the left side, and percutaneous thrombin injection under US guidance with balloon occlusion was performed for the right side. Most pseudoaneurysms occur immediately after the causative procedure. However, there have been some cases in which pseudoaneurysms may occur several weeks or months later; it is therefore necessary to check the risk factors and to carefully observe the hemostasis site.