• Title/Summary/Keyword: Simpson's formula

Search Result 14, Processing Time 0.016 seconds

The Thickness Effect on the Determination of Fracture Toughness Jic (파괴인성치 Jic 결정에 대한 시험편 두께의 영향에 관한 연구)

  • 고성위
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.24 no.2
    • /
    • pp.83-93
    • /
    • 1988
  • Recent Experimental results show that the J integral can be effectively used to obtain a valid parameter for predicting plane strain and plane stress fracture. However, only a few research results have been reported for the effect of thickness where the plane strain state can not be assumed. A purpose of this study is to find the behavior of fracture touhness and tearing modulus varing the specimen thickness. The type of specimen in the present study is compact tension (CT). The thicknesses of the low carbon steel specimens that are used in the experiments are 5, 10, 15, 20 and 25mm. The measurement of crack length is taken by optical measurements method. From the study, the followings are found; 1) The fracture toughness and the tearing modulus which are obtained by using Yoon's and Simpson's formula show more conservative than that by using Rice's and Merkel's. 2) The fracture toughness is increase in specimen thickness which is reached 15mm. Beyond this thickness the fracture toughness is decreased in specimen thickness. 3) In the case of CT specimen with the thickness ranging from 5 to 25mm, the tearing modulus which is applied the same J integral equation is almost constant. 4) By using Yoon's formula, the correlation of the plane slress fracture toughness J sub(C) with specimen thickness B is expressed as the following formula. J sub(C)/J sub(IC)=1.7-15.1(B/W)+112.9(B/W) super(2) -301.3(B/W) super(3) +260.6(B/W) super(4)

  • PDF

A Study on Calculation of Readjustment Height of Urban Region by Geo-spatial Information System - Focused on the Region of YOUNGDO-GU, PUSAN- (지형공간정보체계를 이용한 도시지역의 정지표고 산정에 관한 연구 -부산시 영도구 지역을 중심으로-)

  • 박운용;차성렬;신상철
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.12 no.1
    • /
    • pp.119-129
    • /
    • 1994
  • Geo-spatial information system covers a wide range of applications and technologies and is of great potential interest to many users in government, industry and science. In many civil engineering problems it is necessary to model a landform in order to be able to removed or to be brought in to make the site ready for the proposed developed. The earthwork volume, could be calculated by the trapezoidal formula, Simpson's 1/3 and 3/8 rules. And slope is defined by a plane tangent to the surface as modelled by the digital terrain model at any given point and comprises two components namely, gradient, the maximum rate of change altitude, and aspect, the compass direction of this maximum rate of change. The thesis is the earthwork volume could be counted, readjustment height, slope and aspect analysis of various derived products can be obtained form geo-spatial informations.

  • PDF

A Study on the Earthwork Volume Decision using the Spline Interpolation (Spline보간법을 이용한 토공량결정에 관한 연구)

  • 문두열
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.3
    • /
    • pp.305-313
    • /
    • 2000
  • The calculation of earthwork plays a major role in plan or design of many civil engineering projects, and thus it has become very important to advanced the accuracy of earthwork calculation. Current methods used for estimating the volume of pit excavation assumes that the ground profile between the grid points is linear(trapezoidal rule), or nonlinear(simpson's formulas). Generally speaking. the nonlinear profile formulas provide better accuracy than the linear profile formulas. However, all the formulas mentioned have a common drawback to ground profile, such as sharp corners or the grid points of any two straight lines. In this paper, mathematical model for a searching examination the drawbacks of the current methods is presented. Also, the presented formular, the spot height method, and chamber formulas, chen and lin method are compared with the volumes of the pits in these examples. As a result of this study, algorithm of a proposal area formula by spline method should provide a better accuracy than the spot height method, chamber formulas, chen and lin method. The mathematical model mentioned make an offer maximum accuracy in estimating the volume of a pit excavation.

  • PDF

Development of the Model for Total Quality Management and Cost of Quality using Activity Based Costing in the Hospital (병원의 활동기준원가를 이용한 총체적 질관리 모형 및 질비용 산출 모형 개발)

  • 조우현;전기홍;이해종;박은철;김병조;김보경;이상규
    • Health Policy and Management
    • /
    • v.11 no.2
    • /
    • pp.141-168
    • /
    • 2001
  • Healthcare service organizations can apply the cost of quality(COQ) model as a method to evaluate a service quality improvement project such as Total Quality Management (TQM). COQ model has been used to quantify and evaluate the efficiency and effectiveness of TQM project through estimation between cost and benefit in intervention for a quality Improvement to provide satisfied services for a customer, and to identify a non value added process. For estimating cost of quality, We used activities and activity costs based on Activity Based Costing(ABC) system. These procedures let the researchers know whether the process is value-added by each activity, and identify a process to require improvement in TQM project. Through the series of procedures, health care organizations are service organizations can identify a problem in their quality improvement programs, solve the problem, and improve their quality of care for their costumers with optimized cost. The study subject was a quality improvement program of the department of radiology department in a hospital with n bed sizes in Metropolitan Statistical Area (MSA). The principal source of data for developing the COQ model was total cases of retaking shots for diagnoses during five months period from December of the 1998 to April of the 1999 in the department. First of the procedures, for estimating activity based cost of the department of diagnostic radiology, the researchers analyzed total department health insurance claims to identify activities and activity costs using one year period health insurance claims from September of the 1998 to August of the 1999. COQ model in this study applied Simpson & Multher's COQ(SM's COQ) model, and SM's COQ model divided cost of quality into failure cost with external and internal failure cost, and evaluation/prevention cost. The researchers identified contents for cost of quality, defined activities and activity costs for each content with the SM's COQ model, and finally made the formula for estimating activity costs relating to implementing service quality improvement program. The results from the formula for estimating cost of quality were following: 1. The reasons for retaking shots were largely classified into technique, appliances, patients, quality management, non-appliances, doctors, and unclassified. These classifications by reasons were allocated into each office doing re-taking shots. Therefore, total retaking shots categorized by reasons and offices, the researchers identified internal and external failure costs based on these categories. 2. The researchers have developed cost of quality (COQ) model, identified activities by content for cost of quality, assessed activity driving factors and activity contribution rate, and calculated total cost by each content for cost for quality, except for activity cost. 3. According to estimation of cost of quality for retaking shots in department of diagnostic radiology, the failure cost was ₩35,880, evaluation/preventive cost was ₩72,521, two times as much as failure cost. The proportion between internal failure cost and external failure cost in failure cost is similar. The study cannot identify trends on input cost and quality improving in cost of qualify over the time, because the study employs cross-sectional design. Even with this limitation, results of this study are much meaningful. This study shows possibility to evaluate value on the process of TQM subjects using activities and activity costs by ABC system, and this study can objectively evaluate quality improvement program through quantitative comparing input costs with marginal benefits in quality improvement.

  • PDF