• Title/Summary/Keyword: Ship owner

Search Result 90, Processing Time 0.026 seconds

A Study on the optimal Size and Speed of Common Bulk Carrier (일반살화물선의 경제성 평가에 관한 연구 (속력 및 적화톤수를 중심으로))

  • 양시권;손성빈
    • Journal of the Korean Institute of Navigation
    • /
    • v.6 no.1
    • /
    • pp.19-39
    • /
    • 1982
  • There may be a lor of studies on the economic design of ship for the most favorable combination of design basis on the owner's request. However, there are few on the economical ship's size and speed for the ship owner's stand point. This paper describes on the optimal ship's size and speed to the given marine commercial environments for the owner's requirement to the shipyard. As the result of the paper, the criterion curve of bulk carrier will also be used to assess existing ships for their profitability.

  • PDF

A Study on the Effect of Topside and Interface on Hull in Whole Ship Analysis of Ship Type Offshore Structure (Ship Type 해양 구조물 전선 해석 시 Topside와 Interface가 Hull에 미치는 영향 연구)

  • Seo, Joon-Gyu;Kang, Ho-Yun;Park, Jung-Ki
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.58 no.5
    • /
    • pp.314-321
    • /
    • 2021
  • In the existing whole ship analysis, topside was modeled as mass element. However recently, the topside is modeled as beam element due to the owner's requirement to improve the maturity of the whole ship FE model. To follow the owner'srequirement, detailed information for topside drawing and modeling, which may delay analysis schedule, is needed. However, it is hard to respond effectively to this matter due to the lack of study on the topside from the hull perspective. Therefore in this study, the effect of the topside on the hull is investigated when the topside is modeled as a mass element or beam element respectively. In addition, the interface modeling method is analyzed to verify modeling method used in the existing whole ship analysis. The results indicate that the interface and topside modeling method used in existing whole ship analysis are appropriate. This conclusion will be the technical basis for responding to owner's requirement about the topside modeling method.

Legal Issues on the Diving Apparatus Fishery: The case of contract responsibility and accountability at the time of ship collision (잠수기 어업과 관련한 법률상의 쟁점 -약정책임과 선박충돌시의 법정책임을 중심으로-)

  • Heo, Gyeom;Shin, Hyeon-Ok;Lim, Seok-Won
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.26 no.3
    • /
    • pp.647-655
    • /
    • 2014
  • In this research, unlike other fishing, the diving apparatus fishery is that the diver is engaged in fishing for profits. Because it is unique fishery, conflicts can be occurred in members. So, the purpose of this research is to define the contractual relationship between the parties of the diving apparatus fishery. For example, the relationship between the owner and diver and the owner and fishing ship crew. In addition, civil liability of default on the obligation was reviewed. Also, because the trouble was occurred by illegal fishing, criminal liability of ship crash caused by illegal diving apparatus fishery was considered. As a result, It is important to notifying the necessity of some method for the status of diver and fishing ship crew in diving apparatus fishery. moreover, It is need to educate the risk of illegal fishery for the parties of diving apparatus fishery.

A Study on the Relation of the Design and Operating Economy for Bulk Carrier (散積貨物船의 設計와 運航經濟性과의 評價에 關한 硏究)

  • 박명규;최학선
    • Journal of the Korean Institute of Navigation
    • /
    • v.16 no.2
    • /
    • pp.1-19
    • /
    • 1992
  • A Study for the relation between design parameters in conceptual stage and freight cost in operation of ocean-going bulk carrier was presented by economic criterial. Ship design procedure was followed to traditional method and programmed. The measure of merit is the Required Freight Rate(RFR). Parametric method used insteady of optimization technique due to easy to illustrate the results. Calculation results to the relation ship dimension, speed and operating cost in this paper show the influence of oil price is very important. Particularly, when oil price estimated as go up, owner choose a ship which lengh is long , breadth/draft is near 2.0 and speed is low. This program is useful for shipyard, consultant officer and owner all together.

  • PDF

The Study of Synthetic Material Bush (Railko Bush) Application on Large Container Vessel (대형 컨테이너 선박의 합성수지계열 RAILKO BUSH 적용 연구)

  • Lim, Jae-Hun;Park, Kun-Woo;Kim, Kyung-Ho
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2008.09a
    • /
    • pp.46-53
    • /
    • 2008
  • Recently, the synthetic material stern tube bush has been applied by ship owner's requirement because the synthetic material has a merit. That is to say, when stern tube seal is damaged and sea water comes into stern tube, it can work without problem because of water lubricating property. However, the material also has a demerit of temperature rise problem when some factors meets on synthetic material, for example, not sufficient lubrication oil supply and not proper shaft alignment and so on. As known in the world, the RAILKO bush is rampant for synthetic material by some ship owner because of the above mentioned reason. However, the bush has several accidents on large container vessel. Unfortunately or fortunately our yard has a chance to apply the RAILKO bush owing to requirement of specific ship owner. Therefore, it is much more required to approach the accurate shaft alignment analysis. In line with this reason, we had a shaft alignment calculation considering hull deformation and hull flexibility (hull stiffness). Also, in the calculation, we had considered dynamic condition which is reflected he propeller thrust forces and moments and oil film stiffness on the shaft alignment calculation. According to he shaft alignment calculation, bearing slope was applied on the tern tube bush and was measured. The RAILKO bush should be applied the running in procedure according to maker's recommendation for performing the oil film on the bush surface. Finally, the vessels were delivered successfully without any problem with AILKO bush as shown on his paper.

  • PDF

A Method for Translating Pipe Models from Aveva Marine to SmartMarine3D (Aveva Marine 배관 모델을 SmartMarine3D 배관 모델로 변환하는 방법)

  • Cheon, Sanguk;Lee, Jae-Jun;Cho, Min-Cheol;Lee, Kwang
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.5
    • /
    • pp.329-337
    • /
    • 2013
  • At shipyards, to enable design cooperation with engineering companies or to meet ship owner's requirements, there is a need to translate ship models from one ship CAD system to another ship CAD system. In this paper, a method for translating pipe models from Aveva Marine to SmartMarine3D is introduced. Related data and architecture of translation system are addressed and specific details to be considered during translation are explained. The introduced method has been implemented and tested in a shipyard.

Optimum Design for Vibration Reduction of Compass Deck Structure in Ship (선박 컴퍼스 갑판 구조물의 저진동 최적설계)

  • Kong, Young-Mo;Choi, Su-Hyun;Song, Jin-Dae;Yang, Bo-Suk
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.3
    • /
    • pp.249-258
    • /
    • 2005
  • Recently, the vibration reduction at a local structure such as compass deck has been continuously requested by ship owner and shipbuilder. Because crews are afflicted with vibration, severe vibration problems even bring about a damage of structure. This study conducted to get an optimized stiffener size of compass deck to reduce the vibration level and decrease the weight of structure in ship. NASTRAN external call type optimization software (OptShip) which makes use of NASTRAN as a solver is used as an optimization tool. The results indicate that the optimum design is promising for real applications.

Twin Skeg Hull Form on a 222,000 DWT VLBC (222,000 DWT 쌍동 선미 선형의 개발 보고)

  • D.K.,Kim;D.S.,Kang;H.T.,Hong;T.W.,Kim
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.24 no.4
    • /
    • pp.53-70
    • /
    • 1987
  • The world's largest twin skeg VLBC developed at Samsung shipyard for BHP, Austrailian owner, has been proven as a successful vessel through 1 year's operation record in view of the superior propulsion performances, maneouverability in extremely shallow water and all ship's systems, especially, ship's vibration. The principal technical matter during the design development from the initial design stage to the sea trial has been summarized on this report.

  • PDF

Initial Ship Allocation for the Fleet Systematization (선단구성을 위한 초기배선)

  • 이철영;최종화
    • Journal of the Korean Institute of Navigation
    • /
    • v.8 no.1
    • /
    • pp.1-16
    • /
    • 1984
  • The economical property of a shipping enterprise, as well as other transportation industries, is determined by the difference between the freight earned and expense paid. This study can be regarded as a division of optimizing ship allocation to routes under the integrated port transport system. Fleet planning and scheduling require complicated allocations of cargoes to ships and ships to routes in order to optimize the given criterion function for a given forecast period. This paper deals with the optimum ship allocation problem minimizing the operating cost of ships in a shipping company. Optimum fleet operating for a shipping enterprise is very important, since the marine transportation is a form of large quantity transport requiring long-term period, and there is a strong possibility to bring about large amount of loss in operation resulting from a faulty ship allocation. Where there are more than one loading and discharging ports, and a variety of ship's ability in speed, capacity, operating cost etc., and when the amount of commodities to be transported between the ports has been determined, then the ship's schedule minimizing the operating cost while satisfying the transport demand within the predetermined period will be made up. First of all a formula of ship allocation problems will be established and then will be constructed to solve an example by the Integer Programming application after consideration of the ship's ability, supply and demand of commodity, amount of commodity to be transported, operating costs of each ship etc. This study will give good information on deciding intention for a ship oprator or owner to meet the computerization current with shiping management.

  • PDF

Uncertainty Analysis for Speed and Power Performance in Sea Trial using Monte Carlo Simulation (몬테카를로 시뮬레이션을 이용한 시운전 선속-동력 성능에 대한 불확실성 해석)

  • Seo, Dae-Won;Kim, Min-Su;Kim, Sang-Yeob
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.3
    • /
    • pp.242-250
    • /
    • 2019
  • The speed and power performance of a ship is not only a guarantee issue between the ship owner and the ship-yard, but also is related with the Energy Efficiency Design Index (EEDI) regulation. Recently, International Organization for Standardization (ISO) published the procedure of the measurement and assessment for ship speed and power at sea trial. The results of speed and power performance measured in actual sea condition must inevitably include various uncertainty factors. In this study, the influence for systematic error of shaft power measurement system was examined using the Monte Carlo simulation. It is found that the expanded uncertainty of speed and power performance is approximately ${\pm}1.2%$ at the 95% confidence level(k=2) and most of the uncertainty factor is attributed to shaft torque measurement system.