• Title/Summary/Keyword: Shield Method

Search Result 426, Processing Time 0.036 seconds

The Usefulness Evaluation of Radiation Shielding Devices in PET Scan Procedures (PET 검사 프러시저별 방사선 차폐기구의 유용성 평가)

  • Kim, Yeong-Seon;Seo, Myeong-Deok;Lee, Wan-Kyu;Jeong, Yo-Cheon;Kim, Sang-Wook;Seo, Il-Teak;Song, Jae-Beom
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.14 no.2
    • /
    • pp.65-76
    • /
    • 2010
  • Purpose: he use of PET scanners and the number of patient in Korea have been increased for recent several years dramatically. For this reason, technologists have more possibilities to be exposed to the radiation. The hospitals using PET scanners should make an effort to reduce the radiation exposure dose. The purpose of this study was to evaluate the radiation exposure does when using radiation shielding devices. The evaluation was performed through questionnaire survey and experiment. Materials and Methods: First, the technologists who had experience working in PET center in 2008-2009 were surveyed with questionnaire and TLD Figures, personal opinion of utilization of radiation shielding devices are analyzed. Second, we measured the shielding rate of shielding devices which have been using in PET study procedures. We divided the procedures into four steps; distribution, moving, injection of $^{18}F$-FDG and patient setup. Results: First, the results of this survey, using of L-block+Syringe shield, L-block, Syringe shield, No shield during the injection, were each 58.5%, 20%, 9%, 12.3%. The TLD values according to utilization of radiation shield, using both L-block+Syringe Shield and L-block showed the lower TLD values, and Syringe shield only or No shield showed the higher TLD values. Second, the results of experiments according to PET study procedures measured the shielding rates as follows. The shielding rates during the distribution using L-block, L-block+Apron shield were measured 97.4%, 97.7%. The shielding rates during the $^{18}F$-FDG delivery to the injection room using mobile Syringe shield, Syringe holder, Syringe shield carrier were each 81.7%, 98.9%, 99.7%. The shielding rates during the injection using Syringe shield, L-block, L-block+Syringe shield were measured each 51.9%, 98.3%, 98.7%. The shielding rates of Apron were measured in each 30, 60, 90, 120, 150 cm distance. The measurement were each 16.9%, 14.2%, 16.6%, 17.1%, 18.1%, 18.6%. Conclusion: The most effective method for radiation shielding is to using L-block during the $^{18}F$-FDG distribution and Syringe shield carrier during in moving $^{18}F$-FDG. For the $^{18}F$-FDG injection, L-block+Syringe shield have to be used. The shielding effect of Apron has shown average 16.4%. According to the survey of questionnaire, the operators recognized well risk of the radiation exposure but, tended ignore in working. The radiation dose according to recognition of radiation exposure risk was not relevant. but radiation dose according to utilization of radiation shield lower the more use it. The main reason of no use of shielding devices is cumbersome, 55% of the respondents answered. I'm sure, by use of radiation shield in all PET procedure, radiation exposure will be reduced considerably.

  • PDF

A Study on Surface Settlement Prediction Method of Trenchless Technology Pipe Jacking Method (비개착 강관압입공법의 지표침하 예측방법 연구)

  • Chung, Jeeseung;Lee, Gyuyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.11
    • /
    • pp.29-37
    • /
    • 2015
  • Non-excavation method is needed to secure the stability of existing structures during construction. Therefore, prediction of ground settlement is essential. Causes of settlement when using steel pipe indentation method are leading pipe-steel pipe gap, excessive excavation and soil-steel pipe friction etc. Also they are similar to the causes of settlement when using Shield TBM during construction. In this study, ground settlement during steel pipe indentation is predicted by the Gap Parameter Method and Volume Loss Method which are kinds of Shield TBM prediction Method. and compared with those of prediction methods by conducting field test. As a result, Volume Loss Prediction Method is the most similar to the field tests. However, It is needed to additional studies, such as decision of the factors and adaptability for total settlement predictions of non-excavation method.

Calculation and field measurement of earth pressure in shield tunnels under the action of composite foundation

  • Chi Zhang;Shi-ju Ma;Yuan-cheng Guo;Ming-yu Li;Babak Safaei
    • Geomechanics and Engineering
    • /
    • v.34 no.1
    • /
    • pp.17-27
    • /
    • 2023
  • Taking a subway shield tunnel in a certain section of Zhengzhou Metro Line 5 as an example, the field tests of shield cutting cement-soil monopile composite foundation were carried out. The load and internal force of the tunnel lining under the action of composite foundation were tested on-site and the distribution characteristics and variation laws of earth pressure around the tunnel under the load holding state of the composite foundation were analyzed. Five different load combinations (i.e., overburden load theory + q0, Terzaghi's theory + q0, Bierbaumer's theory + q0, Xie's theory + q0, and the proposed method (the combination of compound weight method and Terzaghi's theory) + q0) were used to calculate the internal force of the tunnel structure and the obtained results were compared with the measured internal force results. The action mode of earth pressure on the tunnel lining structure was evaluated. Research results show that the earth pressure obtained by the calculation method proposed in this paper was more consistent with the measured value and the deviation between the two was within 5%. The distribution of the calculated internal force of the tunnel structure was more in line with the distribution law of field test data and the deviation between the calculated and measured values was small. This effectively verified the rationality and applicability of the proposed calculation method. Research results provided references for the design and evaluation of shield tunnels under the action of composite foundations.

Study on the Betterment of Construction Capacity in SHIELD Method (쉴드 공법의 시공성 개선에 관한 연구)

  • 김민성;한건모
    • Journal of Ocean Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.3-9
    • /
    • 1998
  • According to the developement of cities, electric wires and commuinication lines which are currently above the ground effect on the bad. Nowadays, it is necessary to build up underground facilities because the construction is increasing. Excavation work has been dominant even though the inconvenient things occurred, for example a civil appeal, a traffic obstacle, safety and spoiling the fine view because of the cost or period of the construction work. But the congestion of cities are more and more serious. Therefore shield-method is the way to escape from congestion. I considered all the construction fields which are in progress or finished.

  • PDF

Basic Experiment Using Taguchi method for Vertical Wind Turbine with Wind-shield (다구찌 기법을 이용한 윈드실드 수직축 풍력 터빈의 기초 실험 연구)

  • Hong, Cheol-Hyun;Seo, Seong-Ho
    • Journal of Ocean Engineering and Technology
    • /
    • v.25 no.3
    • /
    • pp.85-89
    • /
    • 2011
  • This study aimed to develop a wind turbine system for the domestic wind environments. The Taguchi method was applied to obtain the optimal design for a wind turbine with a wind-shield. The design parameters were defined to look for the shape of the wind turbine. Optimal parameters were determined on the basis of the analyzed level averages of the characteristics. According to the test results to which the optimal parameters were applied, the rpm improved. It was also found that a windshield 3/4 the size contributes to improving the efficiency of existing turbines.

Applicability estimation for cable assembling method of shield tunnel using field test construction (현장 조립 시험시공을 통한 쉴드터널 강연선 체결 기술의 적용성 평가)

  • Kim, Dong-Min;Ma, Sang-Joon;Lee, Young-Sub
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.11-23
    • /
    • 2015
  • In this study, the new segment assembling method using cable tensible force was developed to improve the problem of bolt assembling method of shield tunnel. In the field test construction, cable assembling method reduced the assembling time of segment in comparison with bolt assembling method because of guide role of segment shear-key. In the result of measuring the necessary time for segment assembling process, it took 420sec to assemble one segment in bolt method and 400sec to assemble one segment in cable method, but in case of using the cable automatic feeder, it could reduce the necessary time as 60sec in comparison with bolt assembling method. The cable automatic system modeling using BIM, that connected shield TBM also will be utilized in the area of design TBM, excavation plan, method process understanding, construction management and so on.

Development of a trench shield machine for the near-surface railway construction (저심도 철도 건설을 위한 트렌치 쉴드 장비 개발연구)

  • Lee, So-Oh;Sagong, Myung;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.175-187
    • /
    • 2015
  • In this paper, the development of trench shield machine for near-surface railway construction were presented. The Near-surface railway can be constructed by cut and cover construction method, because it is installed at the depth of 5~7 m below roads. The cut and cover construction method mostly use temporary supports. The limitation of the cut and cover method is high installation cost and long construction period. To overcome these disadvantages, development of the trench shield machine is proposed and expected to shorten the construction time and cost of near-surface railway system. The sliding retaining wall of trench shield equipment replaces the role of temporary support (solider piles and lagging) and excavator equiped to the bottom front of the machine shorten the excavation time. This paper deals with design of the bit attached to the excavator and required capacity of the motor.

A Prediction Method for Ground Surface Settlement During Shield Tunneling in Cohesive Soils (점성토 지반에서의 실드 터널 시공에 따른 지표침하 예측 기법)

  • Yoo, Chung-Sik;Lee, Ho
    • Geotechnical Engineering
    • /
    • v.13 no.6
    • /
    • pp.107-122
    • /
    • 1997
  • This paper presents a ground surface settlement prediction method for shield tunneling in cohesive soils. In order to develop the method, a parametric study on shield tunneling was performed by using a threetimensional elasto-plastic finite element analysis, which can simulate the construction procedure. By using the results of the finite element analysis, the ground movement mechanism was investigated and a base which relates the ground surface settlement and iuluencing factors was formed. The data base was then used to formulate semi -empirical equations for both surface settlement ratio above tunnel face and imflection point by means of a regression analysis. Furthermore, a prediction method for transverse and longitudinal surface settlement profiles was suggested by using the leveloped equations in conjunction with the normal probability curve. Effectiveness of the developed method was illustrated by comparing settlement profiles obtained by using the developed method with the results of finite element analysis and measured data. Based on the comparison, it was concluded that the developed method can be effectively rosed for practical applications at least within the conditions investigated.

  • PDF

Structural Analysis of Thruster Heat Shield for Satellite Propulsion System (인공위성 추진시스템용 추력기 열차폐막의 구조해석)

  • Lee, Kyun-Ho;Kim, Jeong-Soo;Han, Cho-Young
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.468-472
    • /
    • 2003
  • MRE-1 dual thruster module(DTM) which will be installed to the present under development KOMPSAT(Korea Multi-Purpose Satellite) can provide reliable and cost-effective means of propulsive control for attitude and maneuvering control system. Thruster heat shield, one of the main components of DTM, is designed to intercept the radiative heat exchange between thruster and satellite during firing. The inside diameter of the current configuration will be decreased a little compared with that of the previous one due to manufacturing method change. Therefore, the possibility of interference between thruster and heat shield due to configuration change is investigated through structural analysis and their results are described in this paper.

  • PDF