• Title/Summary/Keyword: Shaft cable tunnel

Search Result 7, Processing Time 0.019 seconds

A Study for Application Ventilation System of Underground cable Tunnel (II) (지하 전력구 터널의 환기시스템 적용에 관한 연구 (II))

  • Kim, Kyoung-Yul;Oh, Ki-Dae;Kim, Dae-Hong;Kim, Jong-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.778-783
    • /
    • 2008
  • In this paper, numerical method was calculated on evaluation of underground ventilation system to keep servicing a fresh air. The tunnel length for simulation is 18.2 km with various located seven ventilation shaft. Generally, owing to thermal generation in cable tunnel under about 50 m depths, cable tunnel ventilation system is more important than that of other tunnels. So, we conducted that the effects of ventilation systems was simulated depending on the difference of electrical power tunnel length, the number of shaft tunnel, forced ventilation and duct was or not. Test results show that the main conditions in order to enhance the underground cable tunnel are that ventilation systems have to be designed with forced ventilation and with duct.

  • PDF

Blasting Design for Large Shaft in Urban Area Considering Noise and Vibration -Singapore Transmission Cable Tunnel EW2- (소음 및 진동을 고려한 도심지 내 대단면 수직구 발파설계 사례 -싱가포르 Transmission Cable Tunnel EW2 공구-)

  • Kim, Julie;Lee, Hyo;Kim, Dave;Ko, Tae-Young;Lee, Simon
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.55-63
    • /
    • 2013
  • With increasing needs in power, Singapore is requiring stronger power transmission. Singapore Transmission Cable Tunnel is underground tunnel for transmission system installation such as 400 kV cable. This Transmission Cable Tunnel is 35 km long in total. The North-South Transmission Cable Tunnel is 18.5 km long and there is a total of three (3) contracts; NS1, NS2 and NS3 in respect of the design and construction. The East-West Transmission Cable Tunnel is 16.5 km long, and also there is a total of three (3) contracts; EW1, EW2 and EW3. Among of them, SK E&C has been awarded and operating contract EW2 and NS2. In scope of works, each contract has 3 to 4 shafts which connect aboveground and underground high volt cable and those shafts are used as TBM launching shafts during construction. Transmission Cable Tunnel is undercrossing middle of Singapore and most of shafts are located in urban area. Thus, optimal blasting design satisfying high blasting efficiency as well as blasting vibration limit of Singapore is highly required. Blasting design for large shaft of Singapore Transmission Cable Tunnel follows blasting vibration limits in Singapore and reflects our blasting engineering skills. With Singapore Transmission Cable Tunnel Contract EW2, it is expected that our excellent blasting engineering and performance skills can be delivered to the world.

Numerical Analysis for Shotcrete Lining at SCL Tunnel in NS2 Transmission Cable Tunnel Project in Singapore (싱가포르 케이블터널 프로젝트 NS2현장 SCL 터널에서의 숏크리트 라이닝의 변형거동 특성)

  • Kwang, Han Fook;Kim, Young Geun
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.185-194
    • /
    • 2017
  • This technical paper is a study on the unique displacements of Shotcrete Lining at the mined tunnel during excavation period through deep consideration with real time data from monitoring instrumentations correlation with the numerical analysis to identify the rock stresses and the rock spring points at the working face of the Conventional tunnelling by the Drill and Blast, based on the geological face mapping results of the project NS2, Transmission cable tunnel project in Singapore. The created geometry of numerical model was prepared to the real mined tunnel construction site including, vertical shaft, construction adit, tunnel junction area, and 2 enlargement caverns. The convergence measurements by the monitoring instrumentation were performed during the tunnel excavation and shaft sinking construction stages to guarantee the safety of complicated underground structures.

Case Study of Estimate the Response Displacement for the Seismic Design of Shaft Cable Tunnel (수직전력구 내진설계를 위한 응답변위 산정에 대한 사례 조사)

  • Kim, Yong-Min;Jeong, Sang-Seom;Kim, Young-Ho;Kwon, Young-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.634-639
    • /
    • 2009
  • The response displacement method is the most frequently used method for the seismic design of underground structures. Underground structures under seismic loading will tend to deform with the surrounding ground, and thus the structure is designed to accommodate the free-field deformation without loss of its structural integrity. This method is pseudo-static method, and response displacement of surrounding ground are most important steps. In this study, the single cosine method and the equivalent linear analysis are applied to estimate the response displacement of the real sites, and the results of the each method are compared. Response analysis was also performed with respect to bedrock depth. As a results, Equivalent linear analysis result was larger than single cosine method. And, the relative displacement becomes lager according to depth of the bedrock.

  • PDF

On the Study of Blasting Vibration, Sound by Measuring Gage Influence to Exist Crack in 154kV Daeshin Electric Cable Tunnel (154kV 대신 S/S인출 전력구 시험발파 패턴 및 진동, 소음 계측에 의한 기존 CRACK에 미치는 영향 연구)

  • 강대우;박태원
    • Explosives and Blasting
    • /
    • v.16 no.3
    • /
    • pp.25-34
    • /
    • 1998
  • This area is covered in Andesite of high compression strength and located in PUSAN SEO-KU. There are many old houses around shaft site. So, we must have a cautious blasting operation. A total of 40 blasts were test at DAE-SHIN Shaft site to study the magnitude and frequency characterization of blast-induced vibration. The effect of viblating frequency on structual damage and site-specific scaling to define th empirical equations were also discussed. The result can be summarized as follows: 1. Some empirical equations were obtained. $V=K\{{\frac{D}{W}}1/3\}^{-n}$ where the values for n and K are estimated to be -1.407 to -2.202 and 643.3489 to 7283.2104 respectively. 2. Dominant frequencies at short distance are in the range of about 75.0 to 91.8 Hz, with some exceptions of about 50Hz, Frequencies observed at long distance are in the range of 10 to 2Hz. It is apparent the shift of dominant frequency down to lower levels at long distance.

  • PDF

Study on selection and basic specifications design of shield TBM for power cable tunnels (터널식 전력구 쉴드TBM 선정 및 기본설계 사양 제시에 관한 연구)

  • Jung Joo Kim;Ji Yun Lee;Hee Hwan Ryu;Ju Hwan Jung;Suk Jae Lee;Du San Bae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.3
    • /
    • pp.201-220
    • /
    • 2023
  • Power cable tunnels is one of the underground structures meant for electricity transmission and are constructed using shield TBM method when transitting across urban and subsea regions. With the increasing shaft depth for tunnels excavation when the shield TBM excavated the rock mass, the review of selecting closed-type shield TBM in rocks becomes necessary. A simplified shield TBM design method is also necessary based on conventional geotechnical survey results. In this respect, design method and related design program are developed based on combined results of full-scale tests, considerable amount of accumulated TBM data, and numerical simulation results. In order to validate the program results, excavation data of a completed power cable tunnel project are utilized. Thrust force, torque, and power of shield TBM specification are validated using Kernel density concept which estimates the population data. The robustness of design expertise is established through this research which will help in stable provision of electricity supply.

A study on the utilization of abrasive waterjet for mechanical excavation of hard rock in vertical shaft construction (고강도 암반에서 수직구 기계굴착을 위한 연마재 워터젯 활용에 관한 연구)

  • Seon-Ah Jo;Ju-Hwan Jung;Hee-Hwan Ryu;Jun-Sik Park;Tae-Min Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.5
    • /
    • pp.357-371
    • /
    • 2023
  • In cable tunnel construction using TBM, the vertical shaft is an essential structure for entrance and exit of TBM equipment and power lines. Since a shaft penetrates the ground vertically, it often encounters rock mass. Blasting or rock splitting methods, which are mainly used to the rock excavation, cause public complaints due to the noise, vibration and road occupation. Therefore, mechanical excavation using vertical shaft excavation machine are considered as an alternative to the conventional methods. However, at the current level of technology, the vertical excavation machine has limitation in its performance when applied for high strength rock with a compressive strength of more than 120 MPa. In this study, the potential utilization of waterjet technology as an excavation assistance method was investigated to improve mechanical excavation performance in the hard rock formations. Rock cutting experiments were conducted to verify the cutting performance of the abrasive waterjet. Based on the experimental result, it was found that ensuring excavation performance with respect to changing in ground conditions can be achieved by adjusting waterjet parameters such as standoff distance, traverse speed and water pressure. In addition, based on the relationship between excavation performance, uniaxial compressive strength and RQD, it was suggested that excavation performance could be improved by artificially creating joints using the abrasive waterjet. It is expected that these research results can be utilized as fundamental data for the introduction of vertical shaft excavation machines in the future.