Ministry of Environment has been promoting BTL business of the sewer rehabilitation which continues from 2005 up to now. Sewer rehabilitation is classified into three parts : wastewater pipe rehabilitation, rainwater pipe rehabilitation and drainage equipment rehabilitation. Drainage equipment rehabilitation is that drainage pipe connects wastewater pipe directly without water-purifier. In the drainage equipment construction, it is inevitable to have the damage of ground structures(wall, gate and U drain, etc) when an open excavation method is used. Therefore it is necessary to develop non-excavation method to connect drainage pipe and wastewater pipe like jacking method to avoid the damage of ground structure. This paper has conducted an analysis of the non-excavation method using a boring machine attached to backhoe, which is issued the verification certificate of environmental technology according to the Development of and Support for Environmental Technology Act, article.7. The index set in this analysis was sectionalized to the condition of construction, the grade of drainage pipe, the size of excavated hole, the amount of waste cement concrete and asphalt concrete and the benefit effect compared to open excavation method.
Interceptor sewer is installed underground near to the river side mostly ofstate-owned land and the management efficiency of public sewage disposal facilities is decreasing as too much infiltration/inflow(I/I) and river flow to interceptor sewer are caused by broken or deteriorated sewer. This also affects the sewer pipeline project and decreases its efficiency. Therefore, the aim of this study is to investigate interceptor sewer which has influence on the reduction of the project effect. The investigation were performed for three study areas. The study includes the investigation of current condition of interceptor sewer(sewer extension, pipe diameter, pipe type, installed year, installed locations, etc), investigation of inside of sewer by CCTV accompanied by pumping and dredging works where required, investigation of inside of manholes by eyes, calculation of pollutant load using the results of investigation of flow quantity and quality. Multipoint investigations were simultaneously performed for flow quantity at confluence area and other investigations were also performed for flow quantity and BOD for interceptor sewer and comparison of pollutant load, investigation of infiltration/inflow(I/I) caused by deterioration of interceptor sewer. As the result of the study, a main reason for reduced effect of sewer pipe improvement project was analyzed as the low-density sewage and I/I in public seweage treatment Facility due to deteriorated and unmanaged interceptor sewers.
Geographic information system (GIS) sewer network data are a fundamental input material for urban inundation modeling, which is important to reduce the increasing damages from urban inundation due to climate change. However, the essential attributes of the data built by a local government are often missing because the purpose of building the data is the maintenance of the sewer system. Inconsistent simplification and supplementation of the sewer network data made by individual researchers may increase the uncertainty of flood simulations and influence the inundation analysis results. Therefore, it is necessary to develop a basic algorithm to convert the GIS-based sewage network data into input data that can be used for inundation simulations in consistent way. In this study, the format of GIS-based sewer network data for a watershed near the Sadang Station in Seoul and the Oncheon River Basin in Busan was investigated, and a missing data supplementing algorithm was developed. The missing data such as diameter, location, elevation of pipes and manholes were assumed following a consistent rule, which was developed referring to government documents, previous studies, and average data. The developed algorithm will contribute to minimizing the uncertainty of sewer network data in an urban inundation analysis by excluding the subjective judgment of individual researchers.
I/I(Infiltration/Inflow) characteristics should be studied to achieve I/I reduction which is a main object of sewer rehabilitation. However, The scientific and practical studies which are based on actual survey within the country are not thorough going enough. The earlier studies were limited because of a short research period and specific region. Thus, In this study, a formula is deduced by intensive correlation analysis between defective number and I/I volume in sewer pipe. It can be used as preliminary data when the project established for cost-effective pipe rehabilitation. The study shows that the researched region have a faulty point at every 9.3m on average and prove correlation between defective number and I/I volume in sewer pipes. Thus, this study can improve the investigation system and estimate the volume of the pipe rehabilitation, when site investigations for rehabilitation have been conducted.
Journal of the Korean Society of Hazard Mitigation
/
v.8
no.6
/
pp.7-14
/
2008
The main objective of sewer rehabilitation is to improve its function while eliminating inflow/infiltration (I/I). If we can identify the amount of I/I for an individual pipe, it is possible to estimate the I/Is of sub-areas clearly. However, in real, the amount of I/I for an individual pipe is almost impossible to be obtained due to the limitation of cost and time. In this study, I/I occurrence of each sewer pipe is estimated using AHP (Analytic Hierarch Process) and RPDM (Rehabilitation Priority Decision Model for sewer system) was developed using the estimated I/I of each pipe to perform the efficient sewer rehabilitation. Based on the determined amount of I/I for an individual pipe, the RPDM determines the optimal rehabilitation priority (ORP) using a genetic algorithm for sub-areas in term of minimizing the amount of I/I occurring while the rehabilitation process is performed. The benefit obtained by implementing the ORP for rehabilitation of sub-areas is estimated by the only waste water treatment cost (WWTC) of I/I which occurs during the sewer rehabilitation period. The results of the ORP were compared with those of a numerical weighting method (NWM) which is the decision method for the rehabilitation priority in the general sewer rehabilitation practices and the worst order which are other methods to determine the rehabilitation order of sub-areas in field. The ORP reduced the WWTC by 22% compared to the NWM and by 40% compared to the worst order.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.11
no.2
/
pp.43-51
/
1993
It is very important entity that a map of urban facility is in civic life and development of city. But now, there are many needs of computerization which was used for management of urban facility map because inefficiency was produced due to management of urban facility map by hand. This paper, it was showed that a processing of establishing database in computer by applying GIS. The used sample area in studying in Ansan city in Kyunggi province and a sewer pipe which was in there adapted to establish database in computer. A map of administration district, which is 1:38,000, a map of complex urban planning of city, which is 1:3,000, and the facility map were used for the input of spatial data and the address, the year when sewer pipe was burried, and the quality of pipe, the pipe diameter, and the length of pipe were used as attribute data. Relational structure was used for establishment of database then, searching, analyzing, and processing were possible. Additionary, the result of this studying can be used for replacement of a old sewer pipe, a material quantity which is related with repairement of sewer pipe, and calculation of time, cost by application program framed by Fortran.
It is well known that water leakage from decrepit sewer pipe mainly causes frequent occurrence of ground subsidence in urban area. Thus, laboratory model tests were carried out to investigate ground behaviour according to location of sewer fracture and various relative densities of surrounding soil. The portion of fractured pipe was assumed to be 20% compared to the circumference of pipe, and to be positioned at the top and bottom of the pipe. Ground conditions were made as loose sand ($D_r=30%$) and dense sand ($D_r=70%$). In addition, comparison and analysis with results of model tests were carried out by Finite Element analysis. As a result, not only water leakage from the bottom of pipe (scenario 2) caused greater ground behaviour than leakage from the top of pipe (scenario 1), but also much greater surface settlement occurred when the ground condition is loose.
The occurrence of ground subsidence and sinkhole in downtown areas, which threatens the safety of citizens, has been frequently reported. Among the various mechanisms of a sinkhole, soil erosion through the damaged part of the sewer pipe was found to be the main cause in Seoul. In this study, a random forest model for predicting the occurrence of sinkholes caused by damaged sewer pipes based on sewage pipe information was trained using the information on the sewage pipe and the locations of the sinkhole occurrence case in Seoul. The random forest model showed excellent performance in the prediction of sinkhole occurrence after the optimization of its hyperparameters. In addition, it was confirmed that the sewage pipe length, elevation above sea level, slope, depth of landfill, and the risk of ground subsidence were affected in the order of sewage pipe information used as input variables. The results of this study are expected to be used as basic data for the preparation of a sinkhole susceptibility map and the establishment of an underground cavity exploration plan and a sewage pipe maintenance plan.
This study intends to investigate the characteristics of the foul smell of sewer pipes near large apartment complexes as complaints about offensive odors have drastically increased in urban residential areas. Targeting apartments where people actually complained about foul orders, the study result revealed that components in the smell of the water-purifier tank of the target apartment were very similar to those of sewage treatment plants and night soil treatment plants. Measuring components of odors inside the management layer of tank showed that the concentration of hydrogen sulfide was 10ppm, which is approximately 160 times the safety standard of 0.06ppm; the concentration of mercaptan was 0.9ppm, which is about 220 times the safety standard of 0.004ppm. The source materials of foul odors were discharged outside through ducts, and those households living near outlets producing bad smell complain that it gets worse depending on the air pressure or wind direction and strength, and they could not even open windows. As well, these source materials were transferred by discharge pumps to public sewer pipes outside the apartment complex. While discharge pumps starts operating, they remain on the sewer pipe and then begin to spread over to roads through small openings of manholes on the road. Then, the smell offends passers-by and residents near the road, leading to a lot of complaints. The study results suggest that, among the sources of foul odors in sewer pipes of residential areas, especially those from the water-purifier tank of large apartments, hydrogen sulfide should be the main target for follow-up treatment.
If sewage flows for an extended time at low velocities, solids may be deposited in the sewer. Sufficient velocity or tractive force should be developed regularly to flush out any solids that may have been deposited during low flow periods. This study aims to evaluate the periods (T) during which sewage flow greater than the minimum tractive force maintains on a spot in sewer pipe system with lower tractive force or lower velocity than expected in the design step, when a storage tank installed in a place upsteam pours water into the sewer. The effect to T of design factors of storage tank and sewer pipes was evaluated assuming the uniform flow in sewers. When the area of orifice in the storage tank is $0.062m^2$(or 0.28 m diameter), the maximum T of 31sec was maintained using the usually used preset range of values of several design factors. As the horizontal cross section of storage tank and water depth of storage tank and roughness in sewers increase, T linearly increases. Also, T linearly decreases as the diameter of a sewer pipe increases. Although T gradually decreases as the sewer pipe slope decreases to around 0.005, T decreases sharply when the slope is less than 0.003.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.