• Title/Summary/Keyword: Sewage effluent standard

Search Result 46, Processing Time 0.025 seconds

Optimal Management Scheme for Phosphorus Discharged from Public Sewage Treatment Plant Located in Upstream Basin of Paldang Lake (팔당호 상류수계에 위치한 공공 하수종말처리시설의 총인 배출 최적관리)

  • Woo, Younggug;Park, Eunyoung;Jeon, Yangkun;Jeong, Myungsuk;Rim, Jaymyung
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.2
    • /
    • pp.200-209
    • /
    • 2011
  • The purpose of the study is to optimally manage sewage treatment plant with analysis of phosphorus contribution and improvement of water quality contributing rate in the effect of inflowing point of effluent and Pal-Dang lake after reducing T-P discharge from large scale public sewage treatment plant at upstream of Pal-Dang lake. Also, this study, for enforcement of T-P in effluent, plans optimal management of effluent T-P through examining propriety of environmental, technological, and economical aspect such as water quality standard of domestic and foreign T-P and related policy. In regarding optimal management of T-P discharged from public sewage treatment plant located in upstream of Pal-Dang lake, the study drew following conclusions. With the optimal management of public sewage treatment plant, it showed that a pollution level became higher in the order of Sumgang E in South-Han river, C in Dalcheon, B1 B2, A in North-Han river, and J in Kyungancheon, and it is required reduction of T-P first. The highest value in analysis of benefit-costs from sewage treatment plant in the selected research area was Kyungan B, and the others are with the order of Jojong A, Bokha A, Kyungan A, and Yanghwa A. With result of this study, all 14 areas are required more enforced phosphorus treatment. The study resulted that the most top priority areas were Hangang F, Sumgang B, and Gyungan A, top priority areas were Bokha A, Dalcheon B, and Cheongmi A, priority areas were Hangang E, Heukcheon A, Gyungan B, and Jojong A, and potential areas were Sumgang A, Yanghwa A, Dalcheon A, and Hangang D. It seems to be appropriate to apply 0.2 mg/L of T-P treatment for water supply source reservation, 0.5 mg/L for the other areas by locally, and 0.2~0.5 mg/L for biological nitrogen phosphorus treatment method and 0.5~1 mg/L for Conventional Activated Sludge by technologically. Also, it may be appropriate to apply 0.2 mg/L for the most top priority area(I), 0.3 mg/L for the top priority area(II), 0.4 mg/L for priority area(III), and 0.5 mg/L for potential area(IV) by the separation of priority area.

Advanced Wastewater Treatment Process Using Aerobic Granular Sludge (AGS-SBR) (호기성 그래뉼 슬러지를 이용한 하수고도처리기술(AGS-SBR))

  • Choi, Han Na;Mo, Woo Jong
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.1
    • /
    • pp.47-54
    • /
    • 2021
  • Aerobic granular sludge (AGS) can be classified as a type of self-immobilized microbial aggregates measuring more than 0.2 mm. It offers the option to simultaneously remove COD, N, and P that occur in different zones inside a granule. Also, AGS is characterized by high precipitability, treatability with high organic loading, and high tolerance to low temperature. In this study, a sequencing batch reactor inoculated with AGS (AGS-SBR) is a new advanced wastewater treatment process that was proven to grow AGS with integrated nutrient removal and low C/N ratio. A pilot plant, AGS-SBR with a capacity of 225 ㎥/d was installed at an S sewage treatment plant in Gyeonggi-do. The results of the operation showed that the water quality of the effluent indicated that the value of BOD5 was 1.5 mg/L, CODMn was 11.4 mg/L, SS was 6.2 mg/L, T-N was 13.2 mg/L, and T-P was 0.197 mg/L, and all of these values reliably satisfied an effluent standard (I Area). In winter, the T-N treatment efficiency at a lower temperature of less than 11℃ also showed reliability to meet the effluent standard of the I Area (20 mg/L or less). Analysis of microbial community in AGS showed a higher preponderance of beneficial microorganisms involved in denitrification and phosphorus accumulation compared with activated sludge. The power consumption and sludge disposal cost were reduced by 34.7% and 54.9%, respectively, compared to the domestic SBR type sewage treatment plant with a processing capacity of 1,000 ㎥/d or less.

Correlation analysis between TOC and organic matter indices in influent and effluent of public sewage treatment facilities (공공하수처리시설 유입수 및 방류수에서 TOC와 유기물질 관리지표간의 상관성 분석)

  • Son, Dong-Jin;Jeong, Dong-Hwan;Park, Kyoo-Hong
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.4
    • /
    • pp.122-129
    • /
    • 2021
  • As the total organic carbon (TOC) becomes a new water quality standard as an organic matter (OM) index for public sewage treatment facilities (PSTFs) in Korea from 2021, a comparison study needs to be conducted by examining the correlation between TOC and the existing OM indices (DOC, BOD5, CODMn, CODCr). 500 PSTFs were categorized by process configuration and capacity, and correlation between OM indices in influent and effluent was analyzed. The CODMn/TOC showed higher correlation than other OM indices. This results can be used to basic data for various research associated with TOC.

Characteristics and Management Plan of Water Quality at the Water Pollution Deterioration Area of the Upper Stream of Gapcheon (갑천 상류부의 수질오염 우려구간 수질특성 및 수질관리방안)

  • Jang, Yuho;Son, Bongho;Chu, Shaoxiong;Lim, Bongsu
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.5
    • /
    • pp.399-408
    • /
    • 2019
  • The average annual water quality at Yongchon Bridge, Bonggok 2 Bridge, and Gasuwon Bridge in upstream of Gapcheon in 2018 was Ib grade (good) in organic matters, including BOD and TOC compared to the local environmental standard in Daejeon. However, their monthly changes for TOC partially exceeded the standard during the busy farming season at Bonggok 2 Bridge and Gasuwon Bridge. Although the annual average TP was within the standard, the monthly change at Bonggok 2 Bridge partially exceeded the standard. For Dugyecheon, the annual average water quality in 2018 at Umyeon-dong Bridge and Wonjeong Bridge, which are downstream of the Gyeryong public sewage treatment plant, exceeded the local environmental standard in BOD. COD was exceeded, and TP was within the standard. It seemed that the causes of deteriorated water quality downstream of Dugyecheon were discharges of agricultural water from agricultural land and effluent from the Gyeryong public sewage treatment plant. Assuming the pollution load of 100% based at the Mulangil point of the mainstream of Gapcheon, the ratio of BOD load and TOC load were as high as 58% and 47%, respectively. At the basin of Bonggok 2 Bridge and Mulangil, the loads downstream of Dugyecheon including the Gyeryong public sewage treatment plant were as high as 43% for TN and 56% for TP, respectively, indicating that Dugyecheon had a major impact on the water quality at the mainstream of Gapcheon.

Economic Assesment of Phosphorus Control System for Reject Water using a Integral Type Slow Mixing/Sedimentation Tank and Fiber Filter (일체형 완속교반침전조와 섬유여과기를 이용한 반류수 인 제어시스템의 경제성 연구)

  • Kim, Mi-Ran;Kim, Jeong-Sook;Jang, Jeong-Gook
    • Korean Chemical Engineering Research
    • /
    • v.55 no.6
    • /
    • pp.822-829
    • /
    • 2017
  • As a method to reduce the total phosphorus in sewage treatment plant, we applied the integral type slow mixing/sedimentation fiber filtration system to compare the control methods for the sewage effluent and the reject water. It was analyzed that about 92.4 kg T-P/day should be removed in order to satisfy the final concentration of phosphorus of 0.2 mg T-P/L, which is reinforced effluent standard. Therefore the total phosphorus removal efficiency should be 96% for sewage effluent and 69.2% for reject water (dehydrated filtrate) respectively. The system operation cost to achieve the target of total phosphorus removal efficiency was assessed. It has been found that the treatment cost of the reject water containing high concentration of phosphorus with a low flow rate is reduced to about 1/2.4 of the coagulant cost and about 1/120 of the electricity cost, compared to that of the sewage effluent treatment. Also the economics of the integral type slow mixing/sedimentation fiber filtration system and the general coagulation and sedimentation system were compared. It was evaluated that the development system was more economical because the installation area of the integral type slow mixing/sedimentation fiber filtration system was about 1/7 smaller than that of the general coagulation and sedimentation system, and the annual operation cost including the required amount of coagulant and electricity cost of the development system was lowered about 1/1.7 than that of the general system.

Sewage Treatment Using a Double Media Reed Constructed Wetland (복층여재 갈대 인공습지에 의한 생활하수 처리)

  • Seo, Jeoung-Yoon
    • Journal of Wetlands Research
    • /
    • v.16 no.4
    • /
    • pp.379-388
    • /
    • 2014
  • A sewage was treated using a serially combined vertical(VFCW) and horizontal flow double media (sand and zeolite for VFCW and sand and waste oyster-shell for HFCW) reed constructed wetland(HFCW) with intermittent feeding (see Fig. 1). The sewage was fed into the reed constructed wetland for 10 minutes every 6 hours at the hydraulic load of $314L/m^2{\cdot}day$. The summarized results were as follows: pH values in the effluent depended very heavily on oyster-shell height filled in the HFCW. They were maintained at less than pH 6.24 when the height of the oyster-shell layer was 200 mm. Influent DO(oxygen demand) values(average 0.19 mg/L) were increased in the VFCW(average 7.65 mg/L) and decreased again in the HFCW(average 6.49 mg/L). They were higher in the winter than in the summer. The OTR(oxygen transfer rate) was $57.15g\;O_2/m^2{\cdot}day$ in the VFCW and $5.65g\;O_2/m^2{\cdot}day$ in the HFCW. The removal efficiency of $NH_4{^+}$-N was 80.17%(6.01 $NH_4{^+}$-N mg/L in the effluent). It was lower than that in the case where only zeolite was filled in the reed constructed wetland. But it was expected that treated sewage effluent using a double media reed constructed wetland with 300 mm zeolite layer could stably meet the Korean treated sewage effluent standard(20 mg T-N/L). Average removal efficiencies were SS 88.09%, BOD 88.12%, $COD_{Cr}$ 83.11%, $COD_{Mn}$ 85.58%, T-N 57.21%, $NH_4{^+}$-N 80.17%, T-P 86.73%. Nearly, The concentration of $NO_3{^-}$-N in the effluent of the VFCW was decreased in that of the HFCW. More than half of T-N in the effluent was $NO_3{^-}$-N(7.92 mg/L) but the concentration of $NO_2{^-}$-N in the effluent was average 0.90 mg/L. The removal efficiencies of T-P were 93.24%, 86.30% and 55.44% at the height of the oyster-shell-filled constructed wetland of 800 mm, 500 mm and 200 mm, respectively and therefore, they were proportional to oyster-shell height filled in the HFCW.

A Study on the Removal of Grease and Oill in the Treatment Plant (하수처리장의 유지제거에 대한 연구)

  • 박재효
    • Journal of Environmental Health Sciences
    • /
    • v.7 no.1
    • /
    • pp.1-7
    • /
    • 1981
  • During 20 days from November 4 to 28, 1980, the quantities of grease and oil, BOD (biological oxygen demand), COD (chemical oxygen demand), SS (suspended solid) were measured at Grit Chamber, Primary Sedimentation Tank, Secondary Sedimentation Tank in Chung Gye Chun sewage treatment plant. The results were as follows. 1. The average of grease and oil quantities were 251mg/l at Grit Chamber, 185mg/l at Primary Sedimentation Tank, 47mg/l at Secondary Sedimentation Tank. 2. In the secondary treatment for the removal of grease and oil, the removed quantities of grease and oil were increased according to increasing the quantities of influent grease and oil. The regression equation were as follows G.O.removed=0.731 G.O. influent+3.235 (r=0.887) 3. The average of grease and oil removal rate was 76.4% and the standard deviation of grease and oil removal rate daily was 10.6%. 4. G.O. (grease and oil) and BOD, COD, SS showed significant correlationship at Grit Chamber, Primary Sedimentation Tank, Secondary Sedimentation Tank. (P<0.05). 5. In the secondary treatment, effluent grease & oil and other parameters were analyzed by means of Stepwise multiple regression. Multple regression equation for estimates of effluent grease and oil were as follows. $GO_E=-9.1637+2.0380 SS_E+0.068 SS_I$ (r=0.778) 6. The correlative parameters for the effluent grease and oil seem to be the influent SS and the effluent SS. 7. It was estimated that the removal of grease and oil would be improved by means of improvement of suspended solids removal efficiency but it is necessary to inquire further into the study.

  • PDF

Optimal Condition of TOC Removal Parameter for Sewage Effluent using Electrolysis Process (하수방류수 내 TOC 제거를 위한 전기분해공정의 최적 조건)

  • An, Sang-Woo;Jung, Hyuk-Sang;Lee, Hui-Kyung;Ko, Jun-Geol;Myoung, Dae-Won
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.4
    • /
    • pp.23-29
    • /
    • 2017
  • As the Enforcement Ordinance of Environmental Policy Act was revised in 2013, Total Organic Carbon (TOC) was added as an indicative parameter for organic matter in Water and Aquatic Ecosystem Environmental Criteria. Under these imminent circumstances, a regulatory standard is needed to achieve the proposed TOC limitation control water quality from the STP (Sewage Treatment Plant). In this study, a electrolysis utilizing the electrochemical reaction was investigated in lab-scale experiments for the treatment of TOC in sewage effluent. TOC reduction by a electrolysis was investigated response surface methodology using the Box-Begnken methods were applied to the experimental results. A central composite design was used to investigate the effects of the independent variables of electrode space ($x_1$), current density ($x_2$) and electrolyte concentration ($x_3$) on the dependent variables removal efficiency of TOC (y). The optimal conditions for electrolysis were determined: electrode space, current density and electrolyte concentration were 50 mm, $10.3mA/cm^2$ and 0.1M, respectively. Statistical results showed the order of significance of the independent variables to be electrode space > current density > electrolyte concentration.

Automatic T-P Coagulation Control System using an EC in the MSBR Process - Full Scale Study - (MSBR 공정에서 전기전도도를 이용한 인 제거 자동제어시스템 - 현장 적용 중심 -)

  • Jang, Hee-seon;Lee, Ho-sik
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.1
    • /
    • pp.90-96
    • /
    • 2017
  • Many sewage treatment plants have applied the advanced technology of chemical coagulant system to remove phosporus in Korea. However there are some problems for the injection of optimum coagulant dosage. In order to solve these problems, the research related to the more cost-effective automatic total phosphorus coagulation control system using an EC(Electrical Conductivity) have been in progress. This study was conducted by the same process and operation method as the Lab-scale for public small town sewage treatment plant. First, it confirmed the correlation among the EC, PO4-P and coagulant dosage in the Lab-scale MSBR(Membrane Sequencing Batch Reactor) process. Next, it analyzed that correlation coefficient of EC and the coagulant dosage was 0.92 in the Full-scale MSBR process. As a result, not only T-P removal efficiency was doubled but also it satisfied the effluent water quality standard in a stable manner. In addition, by applying the automatic control system using the EC, compared to the fixed coagulant injection system the coagulant dosage could be reduced by 28%.

A Study on Reuse of Reclaimed Water in Jeonbuk Province (전북지역 하수처리수 재이용 방안 연구)

  • Cho, Changwoo;Kim, Jintae;Park, Jeongjae;Song, Juhoon;Lee, Miseon;Jeong, Juri;Ryou, Jaewoong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.5
    • /
    • pp.237-245
    • /
    • 2017
  • This study was aimed at investigating effluent water quality and proposing reuse possibilities for 12 sewage treatment plants discharged more than $5,000m^3/day$ in order to recycle the sewage treatment plant effluent of Jeollabuk-do effectively. Additionally, a laboratory scale test for reprocessing water discharge was performed. Categories of reclaimed sewage water reuse were divided into 7 topics and analyzed a total of 28 items including 16 heavy metals based on water quality standard. As a results, color, BOD, TN, chloride and Electrical Conductivity (EC) exceeded reused water quality standard. In particular, color and TN exceeded in 8 and 5 sewage treatment plants, respectively. The value of chloride and EC were high in sewage treatment plants including the food and industrial wastewater. At 4 sewage treatment plants were possible to reuse without re-treatment. The laboratory scale test was conducted to SandFilter (SF)-Granular Activated Carbon (GAC)-MicroFiltraion (MF)-Reverse Osmosis (RO). Both the removal efficiencies and economic feasibility of total E. coli., color and Suspended Solid (SS) suited in case using the SF-GAC treatment method. The removal of chloride and EC had little effect in the case of SF-GAC-MF system, but RO showed over 90% of removal efficiency. After using SF-GAC process only, the concentration of $UV_{254}$ decreased sharply from 0.3651 /cm to 0.0306 /cm and it showed over 92% of removal efficiency rate. In conclusion, for the effective reuse of sewage discharged water, water quality and the surrounding terrain of treatment plants should be all taken into account. If it needed for the reprocessing, both the selection for treatment and economic combination treatment methods will have to be considered.