• Title/Summary/Keyword: Sequence Maintenance

Search Result 113, Processing Time 0.024 seconds

Design & Implementation of Extractor for Design Sequence of DB tables using Data Flow Diagrams (자료흐름도를 사용한 테이블 설계순서 추출기의 설계 및 구현)

  • Lim, Eun-Ki
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.17 no.3
    • /
    • pp.43-49
    • /
    • 2012
  • Information obtained from DFD(Data Flow Diagram) are very important in system maintenance, because most legacy systems are analyzed using DFD in structured analysis. In our thesis, we design and implement an extractor for design sequence of database tables using DFD. Our extractor gets DFDs as input data, transform them into a directed graph, and extract design sequence of DB tables. We show practicality of our extractor by applying it to a s/w system in operation.

Load Redistribution of Prestressed Concrete Girder Bridges during the Bearing Replacement

  • Park, Sun-Kyu;Kim, Hyeong-Yeol;Kim, Jung-Hyuk
    • KCI Concrete Journal
    • /
    • v.11 no.3
    • /
    • pp.141-151
    • /
    • 1999
  • In the replacement of bearing system of bridges, the jacking work to secure work spaces may cause damage of the superstructure, hence the behavior of superstructure by the jacking force must be considered. Especially, in prestressed concrete I-type girder bridges, considering the stress concentration at the girder and the load redistribution of superstructure, the allowable jacking force and jacking sequence have to be determined. In this study, an analytical method is proposed to calculate the jacking force and overall jacking sequence for the replacement of bearing system without any damage to the superstructure. The stress concentration at the girder and load redistribution of the deck due to jacking force are considered to compute the allowable jacking force for each girder and overall jacking sequence for girders in the deck. Using the solution algorithm developed in this study, the optimum jacking sequence and required jacking force for the prestressed concrete I-type gilder bridge having the standard sections are calculated.

  • PDF

A Study on the Automatic Assembly/Disassembly Procedure for Generating Maintenance Guideline (정비절차 생성을 위한 자동 분해/조립절차 연구)

  • Heo, Gilhwan;Lee, Won;Kwon, Kisang
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.18 no.5
    • /
    • pp.594-601
    • /
    • 2015
  • The purpose of this research is to propose a maintenance support system for deciding assembly sequence of the product and appropriate tools that are used to assembly and disassembly of parts in the product when geometric properties of the product. The digital maintenance system (DMS) is developed to generate the maintenance guideline and the initial experiment is conducted especially for an underwater weapon system with cylindrical structure. DMS considers four factors to find the efficient assembly and disassembly procedure automatically: (1) assembly tree, (2) properties of each part, (3) distance from the center of the product, and (4) volume. Based on the factors, DMS simulate the movement of each tool virtually and the properties of tools are investigated to find an appropriate tool for using assembly and disassembly of each part in the product. The proposed approach integrates modeling, simulation, data configuration, and virtual reality to allow a development of preliminary maintenance guidance.

Development of Bridge Management System for Next Generation based on Life-Cycle Cost and Performance (생애주기 비용 및 성능을 고려한 차세대 교량 유지관리기법 개발)

  • Park, Kyung-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.167-174
    • /
    • 2007
  • This study proposes a practical and realistic method to establish an optimal lifetime maintenance strategy for deteriorating bridges by considering the life-cycle performance as well as the life-cycle cost. The proposed method offers a set of optimal tradeoff maintenance scenarios among other conflicting objectives, such as minimizing cost and maximizing performance. A genetic algorithm is used to generate a set of maintenance scenarios that is a multi-objective combinatorial optimization problem related to the and the life-cycle cost and performance as separate objective functions. A computer program, which generates optimal maintenance scenarios, was developed based on the proposed method. The subordinate relation between bridge members has been considered to decide optimal maintenance sequence. The developed program has been used to present a procedure for finding an optimal maintenance scenario for steel-girder bridges on the Korean National Road. Through this bridge maintenance scenario analysis, it is expected that the developed method and program can be effectively used to allow bridge managers an optimal maintenance strategy satisfying various constraints and requirements.

  • PDF

Screening of cDNAs Encoding Secreted and Membrane Proteins in the Nervous System of Marine Snail Aplysia kurodai

  • Kim, Min-Jeong;Chang, Deok-Jin;Lim, Chae-Seok;Park, Woo-Jin;Kaang, Bong-Kiun
    • Animal cells and systems
    • /
    • v.7 no.2
    • /
    • pp.133-137
    • /
    • 2003
  • Secreted proteins and membrane proteins play key roles in the formation, differentiation, and maintenance of multicellular organisms. In this study, we undertook to characterize these protein types in the central nervous system of the marine snail Aplysia kurodai using a yeast-based signal sequence trap method. One hundred and three cDNA clones were obtained by screening 300,000 clones from the signal sequence trap cDNA library. Of these, twelve were identical to previously identified Aplysia genes, 19 were related to known proteins in other organisms, and 54 clones were novel. These 54 new genes had high signal peptide scores or were found likely to contain a transmembrane domain sequence. Only 18 of the 103 clones proved to be false positive. The study demonstrates that the signal sequence trap method is an effective tool for Isolating Aplysia genes encoding secreted and membrane proteins.

Pushover analysis - result borders due to hinge formation orders

  • Kulkarni, Supriya R.;Narayan, K.S. Babu
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.2
    • /
    • pp.173-187
    • /
    • 2018
  • Performance evaluation of RC frame building by nonlinear static pushover analysis that accounts for elastic and post elastic behavior is becoming very popular as a valid decision making tool in seismic hazard resistant designs. Available literature suggests great amount of interest has shown by researchers in suggesting refinements to geometric and material modelling to bridge the gap between analytical predictions and observed performances. Notwithstanding the attempts gaps still exists. Sequence of plastic hinge formation which has great influence on pushover analysis results is an area less investigated. This paper attempts to highlight the importance of hinge sequence considerations to make analysis results more meaningful. Variation in analysis results due to different hinge sequences have been quantified, compared and bounds on analysis results have been presented.

Transcriptome analysis of the short-term photosynthetic sea slug Placida dendritica

  • Han, Ji Hee;Klochkova, Tatyana A.;Han, Jong Won;Shim, Junbo;Kim, Gwang Hoon
    • ALGAE
    • /
    • v.30 no.4
    • /
    • pp.303-312
    • /
    • 2015
  • The intimate physical interaction between food algae and sacoglossan sea slug is a pertinent system to test the theory that “you are what you eat.” Some sacoglossan mollusks ingest and maintain chloroplasts that they acquire from the algae for photosynthesis. The basis of photosynthesis maintenance in these sea slugs was often explained by extensive horizontal gene transfer (HGT) from the food algae to the animal nucleus. Two large-scale expressed sequence tags databases of the green alga Bryopsis plumosa and sea slug Placida dendritica were established using 454 pyrosequencing. Comparison of the transcriptomes showed no possible case of putative HGT, except an actin gene from P. dendritica, designated as PdActin04, which showed 98.9% identity in DNA sequence with the complementary gene from B. plumosa, BpActin03. Highly conserved homologues of this actin gene were found from related green algae, but not in other photosynthetic sea slugs. Phylogenetic analysis showed incongruence between the gene and known organismal phylogenies of the two species. Our data suggest that HGT is not the primary reason underlying the maintenance of short-term kleptoplastidy in Placida dendritica.

Erection Sequence Analysis of Suspension Bridge Considering to Sliding of Main Cable (주케이블의 슬라이딩을 고려한 현수교의 시공단계 해석)

  • Yhim, Sung-Soon;Kong, Min-Sik;Kim, Byeong-Cheol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.164-172
    • /
    • 2009
  • Anchors and saddles are used to have sufficient geometrical rigidity and make target configuration of main cable of suspension bridge. Neglecting the sliding effect at saddles, points at them have been idealized as fixed nodes in lots of former studies. In general, sliding effects are reported to show significant structural behaviors of main cable and cause to the different responses of bridges. During early erection steps of the suspension bridge, especially, the sliding effect occurs easily because there is large difference of cable tension between main and side span in removing set-back ropes or not applying set-back. This study presents the finite element analysis considering to cable sliding effect and shows the comparison of differences between sliding and non-sliding at election sequence. The analysis of sliding between main cables and saddles needs to obtain more realistic responses because the analysis result can represent unfavorably different responses of bridges. Moreover, the sliding analysis method and results in this study can be used to basic criteria in engineering design and construction steps.

A critical comparison of reflectometry methods for location of wiring faults

  • Furse, Cynthia;Chung, You Chung;Lo, Chet;Pendayala, Praveen
    • Smart Structures and Systems
    • /
    • v.2 no.1
    • /
    • pp.25-46
    • /
    • 2006
  • Aging wiring in buildings, aircraft and transportation systems, consumer products, industrial machinery, etc. is among the most significant potential causes of catastrophic failure and maintenance cost in these structures. Smart wire health monitoring can therefore have a substantial impact on the overall health monitoring of the system. Reflectometry is commonly used for locating faults on wire and cables. This paper compares Time domain reflectometry (TDR), frequency domain reflectometry (FDR), mixed signal reflectometry (MSR), sequence time domain reflectometry (STDR), spread spectrum time domain reflectometry (SSTDR) and capacitance sensors in terms of their accuracy, convenience, cost, size, and ease of use. Advantages and limitations of each method are outlined and evaluated for several types of aircraft cables. The results in this paper can be extrapolated to other types of wire and cable systems.

A Study on Developing the Guideline of Risk Management utilizing BCP technique for Airport Corporation (공항전문기업의 BCP기법을 활용한 위기대응 가이드라인 개발에 관한 연구)

  • Seo, Byung Seok;Shin, Do Hyoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.67-78
    • /
    • 2015
  • The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review