• Title/Summary/Keyword: Seoul metro line no.5,6,7,9

Search Result 3, Processing Time 0.019 seconds

A study on estimation of the total loss and damage ratio of maintenance monitoring sensor of subway tunnel (지하철 터널 유지관리 계측센서의 총 손망실율 산정 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.25-31
    • /
    • 2013
  • In this study, the total loss and damage ratio of maintenance monitoring which is installed and operated in the domestic and foreign tunnel structure is researched and analyzed for estimating the loss and damage ratio of maintenance monitoring sensor of subway tunnel. The total loss and damage ratio at the elapsed time of 5-6 years after installation is 14.2% in the Seoul metro line no.5,6 and 7, 14.8% in the section 1 of the Seoul metro line no.9, 13.9% in the Channel tunnel of England and all of them are close to 15%. Therefore, it is reasonable to reflect that the total loss and damage ratio of maintenance monitoring sensor of subway tunnel is estimated provisionally 15% on design, and hence the study of the loss and damage ratio with the number of elapsed years in long-term by the measurement category will be needed.

A Study on the Loss and Damage Ratio of Railroad Tunnel Maintenance Monitoring Sensor (철도터널 유지관리 계측센서의 손망실율 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.262-270
    • /
    • 2018
  • Purpose: This paper investigates and analyzes the loss and damage ratio of maintenance monitoring sensor in metropolitan and high speed railroad tunnel in Korea and abroad. Method: After 5~6 years from the installation, the maintenance monitoring sensor on metropolitan transit tunnels showed the loss and damage ratio from 14.2% to 14.8% in Seoul metro line no. 5, 6, 7, 9, and 13.9% in UK channel tunnel. Based on the result, 15% is thought to be a proper set for the elapsed years, which is 5 years from the installation. Results: The maintenance monitoring sensor on high speed railroad tunnels showed the loss and damage ratio of 60.9% in Ho-Nam high speed railroad on 1 stage after 3 ~ 5 years from the installation, which was approximately 4 times as high as that of Seoul metro line no. 5, 6, 7, 9. Conclusion: Kyung-Bu high speed railroad on 2 stage, after 8~10 years from the installation, showed the loss and damage ratio of 66.8%. Based on the result, it can be inferred that the loss and damage ratio increases drastically after 5~10 years from the installation. Therefore, it is necessary to study on the loss and damage ratio of long term elapsed years, especially more than 10 years from the installation.

Express Train Choice and Load Factor Analysis as Line Extension in Seoul Metro 9 (서울지하철 9호선 2단계 개통에 따른 급행열차 선택 및 혼잡도 변화분석)

  • Kim, Kyung Min;Oh, Suk Mun;Rho, Hag Lae
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.663-671
    • /
    • 2016
  • This paper investigates how to change passengers' preferences for express trains according to line extension in Seoul Metro Line 9. Before-and-after line extension, we traced passengers' path choices using Smart Card data via the method suggested by Kim et al. (2015). We developed two multinomial logit models before-and-after line extension. Transferability test showed that there is no difference between the two models. However, the load factor of the express train increased by 6.7% and the gap between the local and express trains became significantly wider.