The river-bed variation and the sediment transport in an alluvial stream are very complicated physical phenomena, especially in a stream where the dam construction prevents the supply of earth and sand from upper tributaries Therefore, the mathematical modeling is needed to establish. The purpose of this study is to apply river-bed variation to the Han River downstream by the conception of gradually varied unsteady flow instead of that of steady flow in order to decrease errors. For the variation and forecast of river-bed, the numerical analysis has been made in this study by way of discharge variation and river-bed variation. In conclusion, the numerical analysis shows that river-bed variation, sediment transport , and their forecast have similarity to natural phenomena and that river-bed variation is greatly affected in sediment transport by discharge variation and retention time(duration). Therefore, the errors of numerical analysis can be reduced by the application of flood data instead of continuous discharge data.
Journal of The Geomorphological Association of Korea
/
v.24
no.1
/
pp.13-24
/
2017
This study analyzes altitude changes of riverbed at 6 bridges in the upper and lower reaches of Yeongju Dam in Naeseong River, from 2009 to 2016 just before and after the dam construction. For 5 years from November 2010 to December 2015 when the dam was under construction, approximately 0.091m of the riverbed altitude in average more than twice before the dam construction was lowered, because of the effects of riverbed excavation for riverside maintenance in the upper reaches and transport limitation of flow and sediment by the dam in the lower reaches. Between November 2009 and December 2016 when the dam was in pre-construction and post-construction stages, respectively, the most sites in this study in the upper and lower reaches showed lowering in the riverbed altitudes. On the other hand, the riverbed around Hoeryongpo closed to the river mouth seems to be influenced by channel changes in Nakdong River rather than by the dam construction.
Process of resuspension and accumulation well explaines the characteristics of surface sediment size distribution and suspended material in Deukryang Bay. Most of the surface sediments of the bay show asymmetric unimodal size distribution, which is found also in sediments from western part of the inner shelf mud area between Keomundo and Yokchido islands. Investigation of the size curves indicates that surface sediment in Deukryang Bay is a deposit of suspended coastal sediment transported east along southern coast of Korea. The distribution pattern of coarse sit fraction content in the surface sediment is very similar to that of computed current velocity (Lee, 1994), suggesting that fine sediment on the bed may reassumed and accumulate repeatedly due to shallow depth and strong tidal current in Deukryang Bay. The process of repeated resuspension and accumulate repeatedly due to shallow depth and strong tidal current in Deukryang Bay. The process of repeated resuspension and accumulation seems to be responsible not only to the asymmetric size distribution of the surface sediment, but also to the amount of suspended material in the bay. The difference of suspended material concentration between surface and near bottom water in summer is two times as large as that the in winter. This seems to derive from the fact that stratification of water mass prevails in summer, while total water mass is vertically mixed in winter. It was found that the most important factors to decide distribution of suspended material in Deukryang Bay are the physical properties of water mass such as current velocity and stratification, and water depth, in part with the supply of suspended sediment by rivers.
Magazine of the Korean Society of Agricultural Engineers
/
v.17
no.3
/
pp.3840-3847
/
1975
With 30 excisting reservoirs in the Chin-Young area, the Sedimentation of the reservoirs has been calculated by comparing the present capacity with the original value, which revealed its reduced reservoir capacity. The reservoirs has a total drainage area of 3l4l ha, with a total capacity of 43.23 ha-m, and are short of water supply due to reduction of reservoir capacity, Annual sedimentation in the reservoir is relation to the drainage area, the mean of annual rainfall, and the slop of drainage area. The results of obtained from the investigation are summarized as follows: (1) A Sediment deposition rate is high, being about 7.03㎥/ha of drainage area, and resulting in the overage decrease of reservoir capacity by 16.1%. This high rate of deposition coule be mainly attributed to the serve denudation of forests due to disorderly cuttings of tree. (2) An average unit storageof 116mm as the time of initial construction is decreased to 95.6mm at present. This phenomena cause a greater storage of irrigation water, sinceit was assumed that original storage quantity itself was already in short. (3) A sediment deposition rate as a relation to the capacity of unit drainge area is as follow: Qs=1.27(C/A)0.6 and standard deviation is 185.5㎥/$\textrm{km}^2$/year. (4) A sediment deposition rate as a relation to the mean of annual rainfall is as follow: Qs=21.9p10.5 and the standard deviation is 364.8㎥/$\textrm{km}^2$/year. (5) A sediment deposition rate as a relation to the mean slop of drainage area is follow: Qs=39.6S0.75 and the standard deviation is 190.2㎥/$\textrm{km}^2$/year (6) Asediment deposition rate as a relation to the drainage area, mean of rainfall, mean of slope of drainage area is: Log Qs=0.197+0.108LogA-6.72LogP+2.20LogS and the standard deviation is 92.4㎥/$\textrm{km}^2$/year
Park, Misook;Lee, Jaeyong;Jung, Sungmin;Park, Chang-Keun;Chang, Kun;Kim, Bomchul
Journal of Korean Society on Water Environment
/
v.28
no.3
/
pp.418-425
/
2012
Dam construction in a river can change its hydrological pattern and trap sediments, which results in ecological changes in the downstream. It is a common phenomenon in the downstream of dams to have decreased sediment flow and increased periphyton. Artificial floods and sediment application are suggested as mitigation practices in order to simulate natural process of flood; transporting sediment and sloughing periphyton off. In this study the effects of artificial floods on periphyton were examined by applying sand artificially and discharging water from a dam (Yangyang Dam, Korea). The study area has been suffering from turbidity problems caused by shore erosion of the dam. The accumulation of inorganic sediments and increase of periphyton on the river bottom are the major factors of habitat deterioration in the downstream reaches. Artificial flood and artificial addition of sand was performed in summer and the effects were measured. Piles of applied sands were washed off easily by discharge and it enhanced the periphyton sloughing effect. The removal efficiency of periphyton was 50 ~ 80% within the 2 km reach from the dam. In conclusion artificial floods and sand application can be a good mitigation measure for the habitat rehabilitation after a dam construction in streams.
Dam sediment can be predicted from the two methods: the one is a physical analysis based on the hydrjulic mechanism and the other is an empirical approach using observed data as a design factor. The former can be used to estimate short-term phenomena by mathematical methods. the latter can be used for deriving long-term design parameters such as dead storage calculation. Monthly reservoir operation is possible with the sluicing efficiency curve based on empirical data. The optimal sediment management can be carried out using the information variable which traces deposit sediments corresponding to the reservoir storage. The idea can provide an optimal operation strategy to save effective storage varying with time. This study presents a methodology for the long-term sediment prediction using sluicing efficiency curve. An application is conducted for estimating accumulated sedment deposit and water supply capability ofr the Fenhe dam in the Yellow rever of China.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.25
no.2
/
pp.76-93
/
2013
The hydrodynamics in the Youngsan River Estuary has changed due to coastal developments such as the estuary dam and two tidal barriers. As the freshwater discharge is artificially controlled, the circulation pattern is different from those of natural estuaries and the river-born sediment supply is restricted. 3D numerical modeling system EFDC was applied to investigate the sediment transport pattern and budget in summer with river floods. The real-time driving forces and the fluvial sediment discharges from the watershed modeling were assigned for the simulation period. The size classes of sand, silt and clay were adopted based on the grain-size distribution of bottom sediments. The modeling results were calibrated and validated with the observed tides, tidal currents and suspended sediment concentrations. The suspended sediments are transported to the offshore at surface layer, whereas upstream toward the dam at mid- and bottom layers in August 2011. The characteristic estuarine circulation induced by the freshwater discharge from the dam, causes the deposition of silt-sized sediments on the whole and the sustained suspension of clay-sized sediments.
The Anaerbic Anoxic/oxic process is one of the biological treatment methods to remove nitrogen and phosphorus effectively which are nutritional elements for eutrophication. Supernatant of primary sediment of Anaerobic digester is used as a carbon source instead of methanol methanol supply in usual A$_{2}$/O process. The efficiency of the following treatment processes are as follow : 1) Changing recycle ratio in the usual A$_{2}$/O process without the stage of Anaerobic digester. 2) Changing recycle ratio in the usual A$_{2}$/O process with the supernatant supply of the Anaerobic digester. In the result of comparison, changing recycle ratio is almost no effect in the removal of phosphorus, however the effect of removal in nitrogenous substance are remarkable, and the effect of Anaerobic digester is not as effective as expected because the BOD removed in the digester partly, the rate of phosphorus to the BOD exceed pertinent range.
International conference on construction engineering and project management
/
2009.05a
/
pp.1615-1617
/
2009
The water resources project of 320 Ha second stage reclamation, in which including an University City, out of 800 Ha Ndata Farm, Malawa, had been under studied in this research. The challenge of C value of runoff coefficient was obtained as 0.8, by introducing the attenuation factors method, proposed by second author, an IDF dimensionless method customary used in Taiwan, proposed by the third author, is translated further to solve the project design rainfall; Rational Method, thus, obtains 11.5 CMS as the 5 year recurrence storage. The final job, completed by the third author's on-site performance, includs field alignments and discussions with the trustee, Malawa President H. E. Dr. Bingu Wa Mutharika, when a special concern of anti-theft. In order to provide sufficient supply up to an amount of 44,000 M3 during April to November, the sketch package includes 6 measurements: one water barrage, one sluice gate, one intake, one sediment reservoir, one water reservoir, and 3199 Km long gravity-driving hydraulic pipe.
Journal of the Korean Society of Clothing and Textiles
/
v.38
no.5
/
pp.755-768
/
2014
This study explores the situation of domestic production and import of dyes as well as type of dye supplier and type of dyer in the Joseon Dynasty based on an analysis of relevant documents. The findings are as follows. Many kinds of natural dyes and natural mordant were produced in the Joseon Dynasty. Some were imported from other countries when in short supply or for diplomatic reasons. As the government organization in charge of the dyes supply and demand, the Jeyonggam was cooperated with the Gongin merchants. As private merchants, there existed Hwapijeon merchants and Cheongramgye merchants. Cheongramgye merchants were both the producer and the seller of indigo sediment. There existed two types of dyers, such as government-operated dyers and private dyers. The Yeomjang (master dyers) and Yeommo (female dyers) were subjugated to government departments in the early part of Joseon Dynasty, but gradually allowed to pursue self-profit. The Yeomga was the private dye house that existed in the early period of the Joseon Dynasty. Ladies and female servants were also allowed to dye for family use or to help in livelihoods. Jeonyeomga was a branch specialized in indigo dyeing. Lastly, the Yoemgye were the merchants of dyed paper and textiles as well as dyers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.