• 제목/요약/키워드: School building site

검색결과 297건 처리시간 0.022초

Joint Reasoning of Real-time Visual Risk Zone Identification and Numeric Checking for Construction Safety Management

  • Ali, Ahmed Khairadeen;Khan, Numan;Lee, Do Yeop;Park, Chansik
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.313-322
    • /
    • 2020
  • The recognition of the risk hazards is a vital step to effectively prevent accidents on a construction site. The advanced development in computer vision systems and the availability of the large visual database related to construction site made it possible to take quick action in the event of human error and disaster situations that may occur during management supervision. Therefore, it is necessary to analyze the risk factors that need to be managed at the construction site and review appropriate and effective technical methods for each risk factor. This research focuses on analyzing Occupational Safety and Health Agency (OSHA) related to risk zone identification rules that can be adopted by the image recognition technology and classify their risk factors depending on the effective technical method. Therefore, this research developed a pattern-oriented classification of OSHA rules that can employ a large scale of safety hazard recognition. This research uses joint reasoning of risk zone Identification and numeric input by utilizing a stereo camera integrated with an image detection algorithm such as (YOLOv3) and Pyramid Stereo Matching Network (PSMNet). The research result identifies risk zones and raises alarm if a target object enters this zone. It also determines numerical information of a target, which recognizes the length, spacing, and angle of the target. Applying image detection joint logic algorithms might leverage the speed and accuracy of hazard detection due to merging more than one factor to prevent accidents in the job site.

  • PDF

심곡서원의 조영과정과 배치에 관한 연구 - 사료 및 발굴조사결과를 중심으로 - (On the Site Plan and History of Simgok seowon Confucian Academy)

  • 이승연;이상해
    • 건축역사연구
    • /
    • 제19권3호
    • /
    • pp.71-87
    • /
    • 2010
  • Sewon was a new type of private academy established by a class landed Confucian scholars known as sarim. During Joseon dynasty, sewon had dual functions as a shrine and a place of learning. The site plan of seowon appeared mainly two types of site plan according to the indications of the age and school. This paper was done to analyze the site plan and construction history of Simgok seowon with historical materials and excavation investigation result. Simgok seowon is dedicated to Jo Gwang-jo(1482~1519). This private Confucian academy was founded in 1605 as a small shrine, which was destroyed in 1636. Thereafter, when the shrine received a royal warrant naming as Simgok seowon in 1650, the new site for the seowon was chosen, which is currently located in Gyeonggi-do Yongin-si Sanghyeon-ri 203. Since then, buildings of Simgok seowon was constructed and repaired couple of times. Through the investigation, it was found that the site plan of Simgok seowon was originally a type of 'jeonjaehudang', that is, dormitory building between the lecture hall and the outer gate, or dormitory building is in front and lecture hall is in behind.

External exposure specific analysis for radiation worker in reuse of containment building for Kori Unit 1

  • Byon, Jihyang;Park, Sangjune;Kim, Yangjin;Ahn, Seokyoung
    • Nuclear Engineering and Technology
    • /
    • 제54권5호
    • /
    • pp.1781-1788
    • /
    • 2022
  • The containment building Kori Unit 1 may require sequential steps for full decommissioning. This study assumes that the containment building is to be used as an auxiliary building that handles nuclear power systems and materials during decommissioning before conversion into a greenfield. Through the derivation of guidelines and dose evaluation, it was confirmed whether the radiation workers were satisfied with the ALARA decision. The specific modeling of the external radiation exposure was performed based on the facility investigation procedures. The external radiation specific derived concentration guideline levels (DCGLs) for radiation workers in containment building were obtained using the RESRAD-BUILD code and were applied to the VISIPLAN 3D ALARA Planning Tool code to calculate the working dose and check worker safety. The derivation of site-specific and realistic DCGLs and dose evaluation via 3D modeling can contribute to the scenario development for the decommission and remediation of containment building.

초등학교 입지특성에 따른 교지 이용에 관한 조사연구 (A study on the Use of site related to the site characteristics of the Elementary School in GwangJu-city)

  • 강만호;정주성;주석중
    • 교육시설
    • /
    • 제11권4호
    • /
    • pp.15-24
    • /
    • 2004
  • The purpose of this study is to suggest some alternative on site planning of elementary school through investigating the effects of geographical and urban environment on the site. For this, we selected and surveyed 35 schools in Gwangju. The results of this study are as follows. 1) We cannot find out the differences from the use of elementary schools sites on slopes of sites. However, the sunken space between H type buildings in the site slopes facing east or west and the placing the playground on the north side of the site slopes facing north have some problems 2) The number of adjacent road and surrounding environment didn't show any effect. To separate between cars and pedestrians, we need some plans to block cars on the pedestrian gateway and it is much better to intensify the parking area near the school gate that cars come in and out. 3) The degree of satisfaction on the outdoor facilities of these cases shows low level. Therefore, to use the site of schools efficiently, we should secure the spacious playground and make plans to provide some spaces around school building for the static activities of students and teachers. 4) Most of all, the site which is suitable for educational environment should be selected. and also Special Code on the urban plan should be established to develop this one.

DEVELOPMENT OF MOBILE APPLICATION BASED RFID AND BIM FOR DEFECT MANAGEMENT ON CONSTRUCTION FIELD

  • Oh-Seong Kwon;Hwi-Gyoung Ko;Hee-Taek Park;Chan-Sik Park
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.7-13
    • /
    • 2013
  • Recently, defect management have been considered as one of the major issues for more large-sized and complicated in domestic construction industry. However, the defect management have not been performed systematically because of special manpower, excessive amount of documents, 2D based inspection work, unclear traditional checklists, complicated work process and difficulty in communicating construction information. Therefore, the construction field manager could not performed the quality inspection and defect management work on time as well as the reliability of recorded quality and defect factors was decreased. The primary objective of this study is develop a Construction Defect Management Application CDMA) using a mobile (smartphone). The application can be sharing a huge information and communication technology based on RFID (Radio-Frequency Identification), BIM (Building Information Modeling) which enables field mangers to efficiently gather the information of defection in construction on-site.

  • PDF

친환경건축물 인증제도 활성화를 위한 정보시스템 개선 연구 (A Study on the Improvement of Green Building Certification Information System)

  • 류수훈
    • 한국디지털건축인테리어학회논문집
    • /
    • 제11권3호
    • /
    • pp.5-16
    • /
    • 2011
  • This study aims for improvement and rebuilding of the 'Green Building Certification Criteria Information System;GBCCIS'. To achieve this, improved information system has developed self-assessment program available on the web and to provide data about the target of Green Building Certification based on the 2010 revised criteria. The target building of Green Building Certification is Apartment, Office, Mixed-Use Building, School, property for sale, accommodation, and other facilities. Also, the information system about the Green building related technologies and techniques to take advantage of offer a variety of information was built. Green Building Certification Criteria web-site Established in this study has information and each menu and contents are linked to organic and high-utilization. Each menu is organized according to the used frequency and the group. Also this web-site is composed of information guide field, core service field, and other field. These improvement of Green Building Certification Criteria Information System can be a positive incentive measures for the activation of Green Building Certification Criteria easily by taking advantage of relevant information by users. And these will be possible to planning development of Green building technologies by introducing the latest Green building construction techniques applicable building. Also, to assess in advance by using self-assessment program in the design phase of building will lead to Green building design and provide the convenience of the application process and through database construction and share information of building assessment resources certified Green Building Certification Criteria will lead to the containment and fair assessment between cation authorities.

Integrating Building Information Modeling and Health and Safety for Onsite Construction

  • Ganah, Abdulkadir;John, Godfaurd A.
    • Safety and Health at Work
    • /
    • 제6권1호
    • /
    • pp.39-45
    • /
    • 2015
  • Background: Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods: In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results: The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion: From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

이동통신회사의 임차료에 영향을 미치는 요인 분석을 통한 임차비용 관리방안 연구 (Lease management in the wireless industry through analysis of factors influencing cell site leases)

  • 이장호;곽춘종
    • 대한안전경영과학회지
    • /
    • 제15권3호
    • /
    • pp.143-150
    • /
    • 2013
  • A cell site lease is a legal agreement by which the owner of a building or a piece of land allows a wireless carrier to use part of it for a cell tower for a period of time in return for money. Wireless carriers spend significant money for cell site leases. This paper tries to find factors affecting cell site leases and management solutions to save lease costs. In other words, this research identifies any factor influencing cell site leases among age, gender, and geographical area in the first problem and determines management priorities using an importance-satisfaction model in the second problem. This paper can provide wireless carriers with effective decision making tools and a basis for negotiation of cell site leases, as they do not have enough bases for negotiation.

Contractors' Perception towards Safety and its Consequences on Construction Workers in Cape Coast Metropolis

  • Mustapha, Zakari
    • 식품보건융합연구
    • /
    • 제5권6호
    • /
    • pp.11-16
    • /
    • 2019
  • The construction environment has been declared as a hazard prone area due to high number of accident and death. The study aims to identify influential factors that contribute to poor safety practices and its consequences on construction workers in Cape Coast Metropolis. Seventy respondents were taken as the sample size for the study. Descriptive analysis was used to analyze the data obtained from the field. Findings show that poor site management, working without safety gadgets, failure to use their Personal Protective Equipment (PPE) and negligence of workers were the main causes of accidents on sites. Poor site management had the highest ranking among the seven variables. Effects of poor safety practices on building construction site and delays in work execution were due to injury of workers, extra cost due to payment of compensation to injured victims, not motivated due to injury of worker and declined reputation of firm. Management team should motivate workers for safe work done, provide adequate PPE for their workers on site and have documented health and safety policy on site. Site authorities and management team should be on site regularly to ensure proper safety practices on construction site.

법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안 (A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects)

  • 박찬석;정일균
    • 대한안전경영과학회지
    • /
    • 제17권1호
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.