• 제목/요약/키워드: Scheduling simulation Transportation and installation (T&I)

검색결과 1건 처리시간 0.01초

모노파일 해상풍력발전의 이송과 설치를 위한 일정계획 및 비용분석 시뮬레이션 (Scheduling and Cost Estimation Simulation for Transportation and Installation of the Offshore Monopile Wind Turbines)

  • 김보람;손명조;장왕석;김태완;홍기용
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.193-209
    • /
    • 2015
  • For reasons such as global warming, depletion of fossil fuels and the danger of nuclear energy the research and development of renewable energy is actively underway. Wind energy has advantages over another renewable energy in terms of location requirements, energy efficiency and reliability. Nowadays the research and development area is expanded to offshore because it can supply more wind reliability and free from noise pollution. In this study, the monopile offshore wind turbine transportation and installation (T&I) process are investigated. In addition, the schedule and cost for the process are estimated by discrete event simulation. For the simulation, simulation models for various means of T&I are developed. The optimum T&I execution plan with shortest duration and lowest cost can be found by using different mission start day and T&I means.