크로스도킹은 물류센터의 운영 개념으로써 입고트럭에 의해 배달된 물품이 재고로써 보관됨이 없이 즉시 고객의 수요에 따라 재분류되어 출고트럭에 적재되어 고객에게 배달되는 프로세스로 구성된다. 본 연구에서는 임시보관 장소를 보유한 크로스도킹 시스템의 총 운영시간을 최소화하기 위한 입고 트럭과 출고 트럭의 일정계획 수립을 위한 수학적 모델을 개발하였다. 본 연구에서 개발한 모델의 적용으로 물류센터 내에서의 자재 취급 빈도 및 시간이 감소하여 제품 손상을 최소화 시키는 효과가 기대된다.
In competitive electricity markets, each GenCo establishes generator maintenance schedule and submits to ISO those. Then, ISO reviews and arranges maintenance schedule of each GenCo to meet the standard for reliability. This paper presents the new optimization model which can apply to competitive electricity markets. The object of this model is to minimize schedules variation of each GenCo and to satisfy system reliability.
Journal of Korean Institute of Industrial Engineers
/
v.28
no.4
/
pp.344-350
/
2002
An alternative to traditional production planning and control systems such as MRP and JIT is the drum-buffer-rope(DBR). Using the DBR system, companies can achieve a large reduction of work-in-process (WIP) and finished-goods inventories (FGI), significant improvement in scheduling performance, and substantial earnings increase. The purpose of this paper is to analyze the effect of the DBR system in a serial production line. Using Markov process, we modeled a DBR system with three stages. For the model developed, we analyze the system characteristics and then present an optimization model for system design. The system performance is also analyzed through sensitivity analysis.
There are many occasions on which the critical decisions should be made in software projects. Those decisions are basically related to estimating and predicting project parameters such as costs, efforts, and duration. The project managers are looking for methods to make better decisions. The decisions about project parameters are recommended to be performed based on historical data of Similar projects. The measures of the tasks in past projects may have different shapes of distributions. we need to add those measures to get a predicted project measures. To add measures with different shapes of distribution, we need to use Monte Carlo Simulation. In this paper, we suggest applying Monte Carlo Simulation for supporting decision makings in software project. We implemented best-fit case and scheduling estimations with Cristal Ball, a commercial product of Monte Carlo simulation and showed how the suggested approach supports those critical decision makings.
Proceedings of the Korea Information Processing Society Conference
/
2018.10a
/
pp.641-644
/
2018
열간 자유 단조는 고온으로 가열한 강피에 압력을 가하여 원하는 형상을 빚는 공정이다. 가열로에서 여러 개의 강피를 동시에 가열하며 목표 온도에 도달하면 꺼내어 다음 공정을 진행한다. 이때 가열로에 투입하는 소재의 조합과 후단 공정을 위해 소재를 꺼내는 순서가 가열로의 에너지 효율에 영향을 끼친다. 본 논문에서는 열간 자유 단조의 에너지 효율을 높이기 위한 비용 예측 모형 기반 작업 계획 최적화 방안을 제안한다. 유전 알고리즘을 이용하여 가열로 강피 조합을 최적화하며 각 설비별 작업 할당 규칙에 따라 전체 작업 계획을 수립한다. 시뮬레이션 기반으로 후보 작업 계획을 평가하여 계획을 최적화 하며 이를 위해 각 설비별 공정 소요 시간 및 에너지 사용량 예측 모형을 이용한다. 예측 모형은 공정 데이터를 기반으로 기계 학습 알고리즘을 적용하여 학습한다. 또한 주기적인 재계획을 통해 예측의 불확실성으로 인해 작업의 진행이 계획대로 이루어지지 않는 문제점을 해결하고자 한다.
Linear Programming(LP) is the term used for defining a wide range of optimization problems in which the objective function to be minimized or maximized is linear in the unknown variables and the constraints are a combination of linear equalities and inequalities. LP problems occur in many real-life economic situations where profits are to be maximized or costs minimized with constraint limits on resources. While the simplex method introduced in a later reference can be used for hand solution of LP problems, computer use becomes necessary even for a small number of variables. Problems involving diet decisions, transportation, production and manufacturing, product mix, engineering limit analysis in design, airline scheduling, and so on are solved using computers. This technique is called Sequential Linear Programming (SLP). This paper describes LP's problems and solves a LP's problems using the neural networks.
Proceedings of the Korea Information Processing Society Conference
/
2019.10a
/
pp.939-941
/
2019
단조는 강괴를 고온으로 가열하고 원하는 형상으로 만드는 공정이다. 가열로에 강괴를 장입하여 가열하고, 고온의 강괴에 프레스, 절단 공정을 적절히 반복하여 원하는 형상으로 만든다. 형상이 완성된 강괴의 경도 및 강도를 조절하기 위해 열처리 공정을 진행한다. 열처리로에 여러 개의 강괴를 장입하여 가열하기 때문에 에너지 비용이 많이 소모된다. 열처리 공정 비용은 열처리 공정의 종류와 장입되는 강괴들의 특성 및 수량 등에 따라서 결정된다. 열처리로에 장입할 강괴 조합을 최적화함으로써 비용을 최소화시킬 수 있다. 따라서 본 논문에서는 비용 예측 모형을 이용하여 열처리로 작업 계획을 최적화하는 방안을 제안한다. 비용 예측 모형은 IoT 인프라를 기반으로 수집한 공정 데이터를 이용하여 학습한다. 다양한 열처리로 작업 계획은 학습한 모형 기반의 시뮬레이션을 통해 평가하여 유전 알고리즘을 기반으로 최적화한다. 최적의 열처리로 작업 계획을 수립함으로써 공정 비용을 최소화하고 에너지 효율을 극대화할 수 있다.
Journal of Korean Society of Industrial and Systems Engineering
/
v.23
no.54
/
pp.77-85
/
2000
One form of job shop scheduling problem in contemporary automated manufacturing such as flexible manufacturing systems (FMS's) is presented which we call the FMS dispatching priority problem. The FMS dispatching priority problem seeks the best dispatching priority of parts and operations, and is essentially a combinatorial optimization problem. Because of the complicated mechanism of the system, the performance of a given dispatching priority must be evaluated via simulation. Simulated annealing have been applied to the problem, and it is found that appropriate parameter setting will be desirable to get good, if not the optimal, solutions within a limited amount of time under the presence of heavy computational burden due to simulation. More specifically, experiments reveal that initial temperature is the single most important factor among other parameters and factors, and that the appropriate initial temperature depends on the allowable computer time in such a way that the less time one can afford to spend, the lower the appropriate initial temperature should be.
IEMEK Journal of Embedded Systems and Applications
/
v.14
no.2
/
pp.63-69
/
2019
Recently, ultra-low latency flash storage devices such as Z-SSD and Optane SSD were introduced with the significant technological improvement in the storage devices which provide much faster response time than today's other NVMe SSDs. With such ultra-low latency, $10{\mu}s$, storage devices the cost of context switch could be an overhead during interrupt-driven I/O completion process. As an interrupt-driven I/O completion process could bring an interrupt handling overhead, polling or hybrid-polling for the I/O completion is known to perform better. In this paper, we analyze tail latency problem in a polling process caused by process scheduling in data center environment where multiple applications run simultaneously under one system and we introduce our adaptive polling selection technique which dynamically selects efficient processing method between two techniques according to the system's conditions.
IEMEK Journal of Embedded Systems and Applications
/
v.16
no.3
/
pp.113-117
/
2021
The data gathering delay and the network lifetime are important indicators to measure the service quality of wireless sensor and actuator networks (WSANs). This study proposes a dynamically cluster head (CH) selection strategy and automatic scheduling scheme of collectors for prolonging the network lifetime and shorting data gathering delay in WSAN. First the monitoring region is equally divided into several subregions and each subregion dynamically selects a sensor node as CH. These can balance the energy consumption of sensor node thereby prolonging the network lifetime. Then a task allocation method based on genetic algorithm is proposed to uniformly assign tasks to actuators. Finally the trajectory of each actuator is optimized by ant colony optimization algorithm. Simulations are conducted to evaluate the effectiveness of the proposed method and the results show that the method performs better to extend network lifetime while also reducing data delay.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.