• Title/Summary/Keyword: Scheduling

Search Result 4,868, Processing Time 0.034 seconds

Design and Implementation of a Non-Face-to-Face Oriented Location-Based Service Software (비대면 지향의 위치-기반 서비스 소프트웨어 설계 및 구현)

  • Park, Hyuk Gyu;Won, Dong Hyun;Shin, Kwang Sung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.10a
    • /
    • pp.580-581
    • /
    • 2021
  • There are various Location-Based Services(LBS) that apply GPS technology in mobile devices such as smart-phone and tablet. In this paper, we designed non-face-to-face oriented LBS software in the reality that non-face-to-face services are increasing due to COVID-19. The proposed model searches location information for trading goods or services and utilizes information identified in real time. The proposed scheduling and priority control algorithm provides efficient service allocations and simulation was performed based on web/app to verify this. While commercialized LBS platforms focus on used goods transactions, the designed method is different in that it provides non-face-to-face services and not-direct transactions between individuals. It provides a wide range of transactions and services to users such as small business owners and franchises.

  • PDF

AI Scheduler using AWS and Raspberry Pi (AWS와 라즈베리 파이를 활용한 AI 스케줄러에 대한 연구)

  • Jeon, Ji-won;Lim, Chae-yean;Jung, Byung-ho;Lee, Sung-Jin;Moon, Sang-ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.10a
    • /
    • pp.370-372
    • /
    • 2021
  • According to the Clinical Research Center for Dementia, 840,000 Koreans aged 65 or older had dementia patients, with a prevalence rate of 10.39%. The prevalence rate is one in 10 elderly people, but difficult for families to take care of them all day. Judged that possible to manage the conditions and schedules of elderly people living alone by utilizing AI speaker system where schedule management is stored. This paper implements modules for AI schedulers in patients with dementia. Configured to link AWS, a remote IOT, inside the raspberry pi, and to output the schedule to speakers using a calendar from Google API. Through this study, judged that ease of scheduling will help manage and schedule dementia patients.

  • PDF

A Simulation-based Genetic Algorithm for a Dispatching Rule in a Flexible Flow Shop with Rework Process (시뮬레이션 기반 유전알고리즘을 이용한 디스패칭 연구: 재작업이 존재하는 유연흐름라인을 대상으로)

  • Gwangheon Lee;Gwanguk Han;Bonggwon Kang;Seonghwan Lee;Soondo Hong
    • The Journal of Bigdata
    • /
    • v.7 no.1
    • /
    • pp.75-87
    • /
    • 2022
  • This study investigates a dynamic flexible flow shop scheduling problem under uncertain rework operations for an automobile pipe production line. We propose a weighted dispatching rule (WDR) based on the multiple dispatching rules to minimize the weighted sum of average flowtime and tardiness. The set of weights in WDR should be carefully determined because it significantly affects the performance measures. We build a discrete-event simulation model and propose a genetic algorithm to optimize the set of weights considering complex and variant operations. The simulation experiments demonstrate that WDR outperforms the baseline dispatching rules in average flowtime and tardiness.

Research on Urban Air Mobility Operations Optimization Research Trends (도심항공교통(Urban Air Mobility) 운영 최적화 연구 동향에 관한 연구)

  • Jibok Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.701-706
    • /
    • 2023
  • The Korean government and industry have presented a roadmap for the commercialization of UAM services and are promoting it in earnest. In order to introduce full-scale UAM services, there are various issues to be solved, such as the development of high-performance aircraft, the design of network bases and corridors, the optimization of operation management, and the establishment of related laws and systems. In this study, in terms of optimizing operation management, we will examine research trends by field, focusing on Korea, and derive research topics that need to be solved in the future. Korean researchers have suggested that research is centered on UAM service usage fees, usage intentions and acceptance models, and vertiport location selection, but operational optimization studies such as service order acceptance, aircraft repositioning, and battery charging and maintenance scheduling are needed in the future.

Study of Reliability Analysis Based Power Generation Facilities Maintenance System - Focused on Continuous Ship Unloader - (신뢰성 분석 기반 발전설비 점검계획 수립 시스템 연구- 석탄 하역기를 중심으로 -)

  • Hwang Seong Hwan;Kim Yu Rim;Kang Sung Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.315-327
    • /
    • 2023
  • Purpose: Recently, research has continued to predict the time of failure of the facility through measurement data obtained by attaching a sensor to the facility. However, depending on the facility, it may be difficult to attach a sensor. The purpose of this study is to propose a power generation maintenance plan system based on failure record data obtained from Continuous Ship Unloader, one of the facilities that is difficult to attach sensors. Methods: This study uses data collected from 2012 to 2022 from the 'CSU-1B' model among Continuous Ship Unloader operated by Korea Midland Power Co., LTD. By fitting fault record data to the Weibull distribution, appropriate maintenance cycles and ranges for each target facility subsystem are derived. In addition, maintenance group between subsystems is selected through Euclidean distance, a metric often used for time series data similarity. Through this, a system for establishing an maintenance plan for power generation facilities is proposed. Results: The results of this study are as follows. For the 17 subsystems of the Continuous Ship Unloader, proper maintenance cycles and ranges were determined, and a total of four maintenance groups were chosen. This resulted in the creation of an power generation maintenance plan system and the establishment of an maintenance plan. Conclusion: This study is a case study of power generation facilities. We proposed a maintenance plan system for Continuous Ship Unloader among power generation facilities.

A Comparative Study of the Flexible Moving Block System and the Fixed Block System in Urban Railway (도시철도에 있어 이동폐색방식과 고정폐색방식의 상호비교 연구)

  • Jeong, Gwangseop;Park, Jeongsoo;Won, Jaimu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.723-730
    • /
    • 2006
  • Recently, The flexible moving block system in train operation has been introduced to the worldwide rail transportation markets. This paper is a comparative study of the conventional fixed block systems effects and the flexible moving block system on train operating time saving. Based on the literature review, the new algorithm is developed. It is to calculate the optimum headway time of the train. The proposed algorithm can overcome some of the existing algorithm problems, such as the limits of the data and unaware of the rail characteristic. The total travel time saving effect has been analyzed by applying the skip stop scheduling system to the each block system. The results of this study indicated that the total travel time is approximately 40% decreased and the schedule velocity is approximately 24% improved when the moving block system is applied. The results of this study could be used as a theoretical basis for the selection of rail signal system in Seoul's subway number 2 line.

Strategies to improve irrigation water management for rice production in Pulangui River Irrigation System

  • Siem, Paul Roderick M.;Ahmad, Mirza Junaid;Choi, Kyung-Sook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.509-509
    • /
    • 2022
  • Rice has always been the anchor of food security in the Philippines and the government is adamant about sustaining rice production by ensuring reliable irrigation water availability. Among the numerous irrigation schemes, the importance of the Pulangui River Irrigation System (PRIS) is undeniable, as it is the largest and primary irrigation source for rice production areas which are considered the food basket in Northern Mindanao. However, the ageing irrigation structures, unlined canals, long-standing water delivery systems, and climate change are compromising the performance of PRIS; and every year, during the dry and wet season, the maximum rice irrigable area is not achieved. From the field-scale water management perspective, untimely irrigation application, an unregulated roster of turn for irrigation among farmers, and the traditional practice of flooding the rice fields are the main causes of substantial water losses in conveyance, distribution, and farm application of irrigation water. Hence, proper irrigation scheduling is crucial to cultivate the maximum irrigable area by ensuring equity among the farmers and to increase the water use efficiency and yield. In this study, the FAO single crop coefficient approach was adopted to estimate rice water requirements, which were subsequently used to suggest appropriate irrigation schedules based on the recommended field-scale rice cultivation practices. The study results would improve the irrigation system management in the study area by facilitating in regulating the canal water flows and releases according to suggested irrigation schedules that could lead to increased benefited area, yield, and water efficiency without straining the available water resources.

  • PDF

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

A Framework of Building Knowledge Representation for Sustainability Rating in BIM

  • Shahaboddin Hashemi Toroghi;Tang-Hung. Nguyen;Jin-Lee. Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.437-443
    • /
    • 2013
  • Recently, sustainable building design, a growing field within architectural design, has been emerged in the construction industry as the practice of designing, constructing, and operating facilities in such a manner that their environmental impact, which has become a great concern of construction professionals, can be minimized. A number of different green rating systems have been developed to help assess that a building project is designed and built using strategies intended to minimize or eliminate its impact on the environment. In the United States, the widely accepted national standards for sustainable building design are known as the LEED (Leadership in Energy and Environmental Design) Green Building Rating System. The assessment of sustainability using the LEED green rating system is a challenging and time-consuming work due to its complicated process. In effect, the LEED green rating system awards points for satisfying specified green building criteria into five major categories: sustainable sites, water efficiency, energy and atmosphere, materials and resources, and indoor environmental quality; and sustainability of a project is rated by accumulating scores (100 points maximum) from these five major categories. The sustainability rating process could be accelerated and facilitated by using computer technology such as BIM (Building Information Modeling), an innovative new approach to building design, engineering, and construction management that has been widely used in the construction industry. BIM is defined as a model-based technology linked with a database of project information, which can be accessed, manipulated, and retrieved for construction estimating, scheduling, project management, as well as sustainability rating. This paper will present a framework representing the building knowledge contained in the LEED green building criteria. The proposed building knowledge framework will be implemented into a BIM platform (e.g. Autodesk Revit Architecture) in which sustainability rating of a building design can be automatically performed. The development of the automated sustainability rating system and the results of its implementation will be discussed.

  • PDF

Resource Allocation for Performance Optimization of Interleaved Mode in Airborne AESA Radar (항공기탑재 AESA 레이다의 동시운용모드 성능 최적화를 위한 자원 할당)

  • Yong-min Kim;Ji-eun Roh;Jin-Ju Won
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.5
    • /
    • pp.540-545
    • /
    • 2023
  • AESA radar is able to instantaneously and adaptively position and control the beam, and this enables to have interleaved mode in modern airborne AESA radar which can maximize situational awareness capability. Interleaved mode provides two or more modes simultaneously, such as Air to Air mode and Sea Surface mode by time sharing technique. In this interleaved mode, performance degradation is inevitable, compared with single mode operation, and effective resource allocation is the key component for the success of interleaved mode. In this paper, we identified performance evaluation items for each mode to analyze interleaved mode performance and proposed effective resource allocation methodology to achieve graceful performance degradation of each mode, focusing on detection range. We also proposed beam scheduling techniques for interleaved mode.