• Title/Summary/Keyword: Scheduled Speed

Search Result 80, Processing Time 0.034 seconds

Train Performance Characteristics of Korean Rubber-Tired AGT System by TPS (TPS를 이용한 한국형 고무차륜경량전철(K-AGT)의 성능특성 분석)

  • Lee Dong-Hyong;Goo Dong-Hoe
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.799-804
    • /
    • 2005
  • In this work, the characteristics of train performance of Korean rubber-tired AGT system(K-AGT) are evaluated by using TPS(Train Performance Simulation) and these results are compared to those of other LRT(Light Rail Transit) systems. The performance characteristics of K-AGT was analyzed by comparing the scheduled speed and the energy consumption in case of station interval change and rail track condition change in, the scheduled construction line. In the scheduled construction line, scheduled speed of K-AGT was no difference with other systems and energy consumption was less than other LRT's. In case station intervals are increased, scheduled speed of K-AGT shows similar increasing rate and in curved and graded track conditions K-AGT has no difference in scheduled speed with other systems. As a simulation result by track condition change, when the track which is smaller than curved line of 250m dominates more than $50\%$ in whole track, K-AGT is similar to other systems to the point of scheduled speed and there is advantage in energy consumption.

  • PDF

An Improved High-Resolution Rotor Position Estimation Using Gain Scheduled Speed Observer in PMSM Drives with Hall-Effect Position Sensors (홀-이펙트 위치센서를 갖는 PMSM 드라이브에서 이득 스케줄 속도관측기에 의한 향상된 고 해상도 회전자 위치추정)

  • Kim, Sam-Young;Byun, Hang-Gil;Ko, Bong-Jin;Park, Seung-Yub
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1809-1815
    • /
    • 2010
  • This paper presents an improved method for high-resolution rotor position estimation in the permanent magnet synchronous motor (PMSM) drives with low-resolution Hall-effect sensors. The proposed method adopts a gain-scheduled full-order speed observer. Since the quantized position signal, which is obtained from Hall-effect sensors, is basically used as the input of the observer, the sixth-order harmonics are essentially included in the estimated position. To eliminate the harmonic components, the quantized position is linearized by a linear extrapolation based on the estimated average speed and futhermore the speed-depentent observer gain scheduling strategy is developed. The observer gain is also scheduled by considering the motor acceleration to improve the dynamic performance according to the changes of the motor speed and load. Several experiments are performed for 800W PMSM drive and the results demonstrate the effectiveness of the proposed method.

The Robust Speed Control on Automatic Train Operation Considering Unknown Running Resistance (열차자동운전에 있어서 미지의 주행저항을 고려한 강인한 속도제어)

  • Byun, Yeun-Sub;Wang, Jong-Bae;Park, Hyun-June
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.50 no.3
    • /
    • pp.114-119
    • /
    • 2001
  • An automatic train operation(ATO) system executes the operation of constant speed travelling and fixed point parking by using microprocessors instead of driver's manual operation. This paper describes the mathematical model for the train considering unknown disturbances which consist of start resistance, travelling resistance, slope resistance, curve resistance, and so on. The speed controller of ATO system is designed by considering the disturbances. The simulation is executed to verify the speed control and fixed point parking performance and to compare its performance with that of a PID-type ATO control system under disturbances. Simulation results show that the control performance of gain scheduled control scheme for ATO system is better than that of the conventional PID controller.

  • PDF

Study of the Metropolitan Rapid Transport System to Minimize Sidetrack Construction (대피선 최소화를 고려한 광역철도 급행화 방안 연구)

  • Kim, Moo Sun;Kim, Jungtai;Kim, Taesik;Park, Sung Soo;Hong, Jae Sung;Cho, Yong Hyeon;Min, Jai Hong
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.5
    • /
    • pp.402-409
    • /
    • 2013
  • In metropolitan railway systems, the average commuting time keeps increasing as the scheduled speed increases, and this leads to a decline of rail service usage and competitiveness. Therefore, effective express operation for urban trains is required to improve the scheduled speed. In this study, based on the obtainable time shortening efficiency and economic viability, several express operations are suggested for urban railways and these suggestions are compared by considering high performance trains with acceleration/deceleration and maximum speed improvement. As a result, the optimum express system, which can minimize the cost for sidetrack construction, is suggested.

Analysis of Roadbed Performance Corresponding with 400km/h Speed Increase of HSR (고속 증속에 따른 노반구조의 요구수준 분석)

  • Choi, Chan-Yong;Eum, Ki-Young;Lee, Seung-Hyeok
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2479-2486
    • /
    • 2011
  • Honam's high speed railway line that was designed as the most suitable with corresponding 350km/h for concrete track will be scheduled train operation in 2015. In this study, It was reviewed the performance level of standardized design section for the soil structure with 350km/h and also analyzed the demand level for roadbed structure corresponding with 400km/h speed up of HSR.

  • PDF

Korea's G7 Project - Broadband Integrated Service Digital Network(B-ISDN)- Completion Target Year 2001 (2001년 완성목표의 우리나라 G7 Project - 광대역종합통신망(B-lSDN) -)

  • 조규심
    • Journal of the Korean Professional Engineers Association
    • /
    • v.27 no.2
    • /
    • pp.42-54
    • /
    • 1994
  • Nowadays communication network is steadily changing from a main body of telephone to a network which is creating new services such as multimedia etc. Jhis article introduces a bud of new service and new network which are able to sustain the above service. Including Korea, world advanced countries have been digitatizing their network with N-ISDN (narrowband ISDN) by e.g. 64K b/s and 1.5M b/s. New service by N-ISDN are extraordinary, though it can not solve all kinds of services. To solve these problems, a solving platform should be constituted. B-ISDN(broadband ISDN), as a platform has to be built to deal with almost all uinds of services, whatever the communication speed, communication mode or communication quality may be. Korea Telecommunication Authority(KTA) opened the narrowband ISDN(N-ISDN) at the end of 1993. This was one step previous opening of the broadband ISDN(B-ISDN) service scheduled to be rendered in 2001. B-ISDN, receiving and transmitting by far more information with high speed than the N-NSDN does, is one of G-7 Progects which the Korean government is driving foreward to raise the national scientific power to seven advan ced countries. This is also linked with an extremely high speed information network scheduled to be built by the Ministry of Communications in 2015.

  • PDF

A Current Collection Performance On-line Test Plan in Korea High Speed Train Development Project (고속전철 기술개발사업 본선 시운전 집전시험계획)

  • 조용현;최강윤;백광선
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.156-162
    • /
    • 2001
  • Current collection performance on-line tests for a Korean High Speed Train being developed in G7 project is scheduled to start in June, 2002. In this paper, preparatory efforts for measuring contact forces which is regarded as one of major measuring items in the test are introduced. Specifically speaking, review of frequencies related with contact force fluctuations, brief of contact force measuring algorithm, review of measuring instrument specifications and development of a data acquisition program are presented.

  • PDF

The opening of Gyeongbu high-speed railway project phase II (between Daegu and Busan) (기획특집: 경부고속철도 2단계사업 (대구~부산)개통)

  • Rim, Hyoung-Gyu
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.6
    • /
    • pp.27-30
    • /
    • 2010
  • Gyeongbu high-speed railway project which comprises the construction of the new line with 417.5km between Seoul and Busan is one of the biggest national projects with approx. 20-trillion-won project cost. The construction was started in June 1992 and afterward phase I (between Seoul and Daegu) was opened in April 2004 and phase II (between Daegu and Busan, 169.5km) is scheduled for opening in the end of October 2010. It is assured that the opening of the entire sections of Gyeongbu high-speed railway will significantly increase productivity and efficiency by improving the land utilization with the promotion of personal and material exchanges induced by the reduction of travel time between regions. Especially, Gyeongbu high-speed railway will be the opportunity to boost speed-up of Korea railway.

  • PDF

Enhancement of Roll Stability by Speed-Adaptive Robust Control (속도감은 강건제어에 의한 롤 운동 특성개선)

  • Kim, Hyo-Jun;Park, Yeong-Pil
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.4
    • /
    • pp.167-175
    • /
    • 2001
  • This paper presents design of active roll controller of a vehicle and experimental study using the electric actuating roll control system. Firstly, parameter sensitivity analysis is performed based on 3DOF linear vehicle model. The controller is designed in the frame work of gain-scheduled H$\infty$ control scheme considering the varying parameters induced by laden and running vehicle condition. In order to investigate a feasibility of an active control system, experimental work is performed using hardware-in-the -loop setup which has been constructed by the devised electric actuating system and the full vehicle model with tire characteristics. The performance is evaluated by experiment using hardware-in-the -loop simulation under the conditions of some steer maneuvers and parameter variations.

  • PDF