KITSAT-3, the third satellite of KITSAT series which has been developed for the last four and half years with purely Korean design and implementation technology, was launched successfully at last. All subsystems were tested and validated during the initial operation of the satellite. During the initaial operation phase, the Earth imaging camera on board KITSAT-3 acquisited several tens of scenes all over the world and transmitted the image data to ground station. The quality of images and the reliability of data transmission-reception system were tested qualititively and quantititively, respectively. In this paper, we summarize the camera, data handling, on-board memory, and image data transmission system of KITSAT-3 as well as the image receiving and archiving system in ground station. The error rate of image data transmission and reception was tested during the initial operation phase. The average data transmission error rate satisfied the initial requirement of less than 1%. The error rate will be reduced through the continuous work of test and stabilization of the ground system hardware.
The MSC is a remote sensing instrument with very high performance that is to be installed on KOMPSAT2 satellite. The MSC consists of EOS (Electro-Optic Subsystem), PMU (Payload Management Unit) and PDTS (Payload Data Transmission Subsystem). PMU controls and monitors all the other payload units by sending commands and collecting telemetry. PMU is in charge of interfacing between payload system and satellite bus system. PMU gets commands from ground-station via OBC (On-Board Computer) that is a main controller of the satellite bus system and sends telemetry to the ground-station via OBC. There is a processor module, called SBC (Single Board Computer) in the PMU. The SBC is a main controller of the MSC system. The main roles of the SBC are payload mission management, command validation and execution, telemetry collection and monitoring, ancillary data handling, event reporting, power control of payload sub-units and communication with these units. Intel's 80486DX2 processor has been used for the SBC. Due to the fact that the SBC plays important roles for imaging mission execution and handles a lot of control data that is required for payload operation, it is required to make analysis of the CPU load when it is in maximum operation mode. In this paper, the analysis and measurement results of the SBC throughput in the maximum operation mode.
As determined single coaxial cable for the interface between satellite and ground station in COMS RF compatibility test, RF supporting unit was required to allow signals in different frequency-band to be exchanged in the single coaxial cable. In addition, the path loss between satellite and ground station in normal operation should be simulated through two RF supporting units connected to the ends of single coaxial cable. As an effort to design RF supporting unit, level diagram was firstly conducted on the basis of measured data for each element. From the level diagram, it was found that single coaxial cable connected with two RF supporting units properly represented the path loss between satellite and ground station After RF supporting unit was integrated on aluminum plate, it was tested that input signal level at each test cap linked with MODCS and TC&R was tunable within the required dynamic range. RF supporting unit, now completely integrated, will be applied in the upcoming COMS RF compatibility test.
A conceptual study about the angle information based orbit determination technique for a geostationary satellite was performed. With an assumption that the simultaneous observing of the earth and nearby stars is possible, we confirmed that the view angles between the earth and stars can be use as inputs for orbit determination process. By the MA TLAB simulation with least square method, the convergence is confirmed. This conceptual study was performed with the COMS for instance. This technique will be able to use as a back-up of ground station's orbit determination or a part of autonomous satellite operation.
In this paper, requirements of Meteorological Administration about Meteorological Image. (MI) of Communications, Ocean and Meteorological Satellite (COMS) is analyzed for the design of COMS ground station and according to the analysis results, the distribution image size of each observation area suitable for satellite Field Of View (FOV) stated at the requirements of meteorological administration is determined and the precise satellite FOV and the size of distribution image is calculated on the basis of the image size of the determined observation area. The results in this paper were applied to the detailed design for COMS ground station and also are expected to be used for the future observation scheduling and the scheduling of distribution of user data.
Journal of Satellite, Information and Communications
/
v.10
no.3
/
pp.102-108
/
2015
With the constantly increasing demand of domestic and oversea satellite images, there is also a growing demand to rapidly acquire images after the satellite image collection planning of KOMPSAT-2/3/5. Therefore, it has been increasing to use the korea ground station and oversea ground station to keep pace with increased demand. The KARI is operating Data Ingestion System of the KOMPSAT-2/3 in Svalbard, where the satellite images have been received at least four or six times a day. The KARI is planning to operate oversea receiving system for KOMPSAT-5/3A. This paper introduces the polar data ingestion system operating in Norway, and presents the process of design and development for Polar Integration receiving system in preparation of multiple satellite operation.
Baek, Hyun Chul;Jang, In Sik;Lee, Sang Jeong;Kim, Byung Chul;Lee, Jae Yong
Journal of Aerospace System Engineering
/
v.13
no.4
/
pp.1-9
/
2019
Integration of satellites with diverse missions, such as broadcast-communication, earth, meteorologicaland marine observations, and navigation, is vulnerable. The problems of the currently constructed ground station network were analyzed by constructing the test environment. Based on this, we designed a network that was capable of operating multiple satellites by one ground station. In addition, we proposed an interface and network configuration method with domestic and foreign ground stations. The network linking the domestic and foreign ground stations was composed of KREONET (Korea Research Environment Open Network) and GLORIAD (Global Ring Network for Advanced Application Development) of the KISTI(Korea Institute of Science and Technology Information). The internal network consists of VPN (Virtual Private Network), DMZ(De-Militarized Zone), and 1-way USB and so forth. By constructing the network by using the proposed method, harmful data, such as virus inflow and infection, can be blocked.
The Transactions of the Korea Information Processing Society
/
v.3
no.5
/
pp.1198-1206
/
1996
This paper proposes the functionality of communication network management which operates in central control station of satellite communication network, which will be constructed to DAMA-SCPC ground station using KORE ASAT. And communication network configuration components are classified with hierarchical structure in order to efficiently maintain communication network operation management, and configuration components that are classified into graphic objects and this graphic objects are visualized with tree structure which can be handled uniformally and efficiently. In addition to that, this paper proposes expression method of graphic object to implement our real time communication network management system, and the real time communication net-work management composed as client-server system. The performance of the proposed algorithm is analyzed through the computer simulation.
There are two main software in COMS ground station at the normal mode operation - stationkeeping and wheel off-loading. In this paper, ground software validation test for wheel off-loading is summarized and described. The wheel off-loading was performed the design change from E3000 heritage and analyzed. The wheel off-loading of ground software has two part; one is wheel off-loading management for parameters change at the thruster set switching time and the other is wheel off-loading set-point being sent to satellite for the reference momentum.
Journal of Satellite, Information and Communications
/
v.2
no.1
/
pp.35-40
/
2007
COSPAS-SARSAT is the search and rescue system for providing a distress alarm and a position identification using an international satellite and ground facilities. Aviators, mariners and land users worldwide are equipped with COSPAS-SARSAT distress beacons, which could help save their in emergency situations anywhere in the world. As the existing COSPAS-SARSAT system is generally operated by LEO(Low-altitude Earth Orbit) Satellite System, the time from the distress beacon to the rescue is more than 1 hour with average and the accuracy of the distress location is about 5 Km. Therefore, in order to overcome this problem, the development for the next generation SAR(search and rescue) system which uses the MEO(middle-altitude Earth Orbit) satellites is going on the Galileo project. EU is developing this project for the full operation capability in 2011, and this project will have SAR payloads and support to the Search and Rescue service-herein called SAR/Galileo. SAR/Galileo will have the performance of a few meter accuracy, within 10 minutes to rescue from reception of distress messages, and Return Link Service(from the SAR operator to the distress emitting beacon), thereby facilitating more efficient rescue operations and helping to reduce the rate of false alerts. As the disaster is larger every year, the ground station, MEOLUT for next generation ASR/Galileo is urgently needed for the lifesaving for the larger disaster, the research for beacon and the ground station such as MEOLUT for introducing the next generation SAR/Galileo in Korea is very timely and is important. This paper presents the procedures and the strategies for the participation, the area to develop reasonably, and the propulsion organization for developing the SAR/Galileo ground system in Korea.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.