• Title/Summary/Keyword: Safety design and operation

Search Result 999, Processing Time 0.024 seconds

A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS) (수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구)

  • Son, Yeong-Jin;Park, Keun-Soo;Min, Kyung-Yun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.1 s.38
    • /
    • pp.57-66
    • /
    • 2007
  • 1974. 8. 15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 2224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basie design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

Analysis of User Requirements for Development of Vessel Traffic Services Cloud System (선박교통관제 클라우드 시스템 개발에 따른 사용자 요구사항 분석)

  • Lee, Li-Na;Kim, Joo-Sung;Lee, Hong-Hoon;Lee, Jin-Suk;Namgung, Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.2
    • /
    • pp.314-323
    • /
    • 2022
  • Vessel Traffic Services (VTS) operators perform traffic management tasks using VTS systems and sensor equipment designated as VTS facilities to promote the safety and efficiency of vessel traffic. The necessary VTS information for effective operations could be obtained through the additional access of various information channels other than the designated VTS facility. To unify these various information access windows, the development of the VTS cloud system is in progress. In this study, the operational information analysis for VTS was performed through VTS tasks-facility linkage analysis to identify the user required information according to the introduction of the VTS cloud system. The VTS task analysis was performed through research of the international and domestic literature, and expert interviews. The necessary information were identified and linked according to the VTS facilities. As a result of the analysis, 37 categories of necessary information were identified for internal and external information windows, and 8 information windows were selected other than the present VTS equipment. The identified user requirements would be applied to the structure design of the VTS cloud system. In the future, it is necessary to update user requirements through scenario-based user operation analysis and to conduct additional research on the system interface design.

Proposal for Specification of Counter-measurement in Frost-Heave System in Railway Underpass Box Structures in North Korea Considering Climate Condition (북한지역 기후조건을 고려한 철도횡단구조물의 동상방지방안 제시)

  • Kim, Mun-Su;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.99-110
    • /
    • 2017
  • As a part of several Eurasian initiatives, the Korean government is trying to reconnect railways through North Korea to the Asian continent. If South Korea could build a network using railway, it would be a chance to develop a robust economic environment and to motivate economic growth. In the railway reconnection project between North and South Korea, the most important part of the railway roadbed sector is repair or improvement, and then construction of a new line through North Korea. There are not many big differences in the geological conditions; however, climate condition varies greatly during winter. The most significant condition in the safety of railway operation is frost-heaving. However, since South Korea has a relatively mild climate condition compared with North Korea, design and construction specifications under severe weather conditions in winter have not been prepared. This study proposes a plan for revising the railway design standard for underpass structures through an analysis of international standards, leading to site construction to prevent frost-heave.

Evaluation of the limit ice thickness for the hull of various Finnish-Swedish ice class vessels navigating in the Russian Arctic

  • Kujala, Pentti;Korgesaar, Mihkel;Kamarainen, Jorma
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.10 no.3
    • /
    • pp.376-384
    • /
    • 2018
  • Selection of suitable ice class for ships operation is an important but not simple task. The increased exploitation of the Polar waters, both seasonal periods and geographical areas, as well as the introduction of new international design standards such as Polar Code, reduces the relevancy of using existing experience as basis for the selection, and new methods and knowledge have to be developed. This paper will analyse what can be the limiting ice thickness for ships navigating in the Russian Arctic and designed according to the Finnish-Swedish ice class rules. The permanent deformations of ice-strengthened shell structures for various ice classes is determined using MT Uikku as the typical size of a vessel navigating in ice. The ice load in various conditions is determined using the ARCDEV data from the winter 1998 as the basic database. By comparing the measured load in various ice conditions with the serviceability limit state of the structures, the limiting ice thickness for various ice classes is determined. The database for maximum loads includes 3-weeks ice load measurements during April 1998 on the Kara Sea mainly by icebreaker assistance. Gumbel 1 distribution is fitted on the measured 20 min maximum values and the data is divided into various classes using ship speed, ice thickness and ice concentration as the main parameters. Results encouragingly show that present designs are safer than assumed in the Polar Code suggesting that assisted operation in Arctic conditions is feasible in rougher conditions than indicated in the Polar Code.

A Study on the Estimation of Design Service Traffic Volume for Turbo Roundabout (국내 나선형 교차로 도입을 위한 적정교통량 산정연구)

  • Song, Min soo;Lee, Dong min
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.5
    • /
    • pp.45-58
    • /
    • 2021
  • It is generally known that a two-lane roundabout has some problems in safety such as increasing conflicts, typically merging and diverging conflicts and conflicts between entering traffic and exiting as well as turning traffic. To solve these problems, a turbo-roundabout had been developed and has successfully brought safer and more efficient operation in other countries. In this study, micro simulations using VISSIM were conducted to investigate the maximum value of service traffic volume. It was found that operation of turbo-roundabouts was influenced by traffic volume for each turning traffic, and the maximum values of traffic volume were values between 2,400 and 2,800 vehicles per hour as rates of traffic volume for each turning traffic. Typically, turbo-roundabouts have limited to operate in conditions with more than 30% for left-turning traffic volume.

Analysis of the Evacuation Safety in a Fire at Welfare Center for Disabled (장애인복지관 화재 시 피난안전성 분석)

  • Park, Sunah;Lee, Jai Young
    • Journal of the Korea Convergence Society
    • /
    • v.12 no.12
    • /
    • pp.315-322
    • /
    • 2021
  • This study analyzes the Required Safe Egress Time (RSET), in the event of a fire at a welfare center for the disabled, using the emergency passage according to the floor arrangement of users to evaluate the safety and the difference in RSET for each emergency passage using the Pathfinder simulation program to suggest an efficient evacuation method. As a result of RSET, it was found that there is no problem in evacuation safety for the current state of the facility's personnel allocation by satisfying the standard RSET in case of fire, and evacuation can be completed safely by evacuating through stairs rather than using elevators if possible. It is necessary for employees to be provided sufficient education and training in advance so that they can evacuate effectively with the disabled in case of fire. This study gives significance in saving many precious lives and safely evacuate in case of fire as evacuation routes were secured through the design, construction and operation of facilities for the disabled and the RSET was shortened through regular evacuation practices. It is necessary to discuss the further RSET studies based on the automatic fire shutters open or not when a fire occurs at a specific location following the installation of automatic fire shutter at the entrance of each floor of the facilities.

Verification of Micro-vibration Isolation Performance by using Low Rotational Stiffness Isolator under Elevation Direction Operation of the X-band Antenna (저 회전강성 진동 절연기에 의한 X-밴드 안테나의 고각방향 미소진동 절연 효과 검증)

  • Jeon, Su-Hyeon;Lee, Jae-Gyeong;Jeong, Sae-Han-Sol;Lee, Myeong-Jae;Oh, Hyun-Ung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.4
    • /
    • pp.238-246
    • /
    • 2015
  • A stepping motor is widely used to operate the elevation and azimuth stage of the X-band antenna with 2-axis gimbal system for effective image data transmission from a satellite to a ground station. However, such stepping motor also generates an undesirable micro-vibration which is one of the main disturbance sources affecting image quality of the high-resolution observation satellite. In order to improve the image quality, the micro-vibration isolation of the X-band antenna system is essential. In this study, the low rotational stiffness isolator has been proposed to reduce the micro-vibration disturbance induced by elevation direction operation of the X-band antenna. In addition, its structural safety was confirmed by the structure analysis based on the derived torque budget. The effectiveness of the design was also verified through the micro-vibration measurement test.

Experimental study on seismic behavior of two-storey modular structure

  • Liu, Yang;Chen, Zhihua;Liu, Jiadi;Zhong, Xu
    • Steel and Composite Structures
    • /
    • v.37 no.3
    • /
    • pp.273-289
    • /
    • 2020
  • Due to the unique construction method of modular steel buildings (MSBs) with units prefabricated fully off the site and assembled quickly on the site, the inter-module connection for easy operation and overall performance of the system were key issues. However, it was a lack of relevant research on the system-level performance of MSBs. This study investigated the seismic performance of two-storey modular steel structure with a proposed vertical rotary inter-module connection. Three full-scale quasi-static tests, with and without corrugated steel plate and its combination, were carried out to evaluate and compare their seismic behaviour. The hysteretic performance, skeleton curves, ductile performance, stiffness degradation, energy dissipation capacity, and deformation pattern were clarified. The results showed that good ductility and plastic deformation ability of such modular steel structures. Two lateral-force resistance mechanisms with different layout combinations were also discussed in detail. The corrugated steel plate could significantly improve the lateral stiffness and bearing capacity of the modular steel structure. The cooperative working mechanism of modules and inter-module connections was further analyzed. When the lateral stiffness of upper and lower modular structures was close, limited bending moment transfer may be considered for the inter-module connection. While a large lateral stiffness difference existed initially between the upper and lower structures, an obvious gap occurred at the inter-module connection, and this gap may significantly influence the bending moments transferred by the inter-module connections. Meanwhile, several design recommendations of inter-module connections were also given for the application of MSBs.

A risk management methodology for maritime logistics and supply chain applications

  • Mokhtari, Kambiz;Ren, Jun
    • Ocean Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.137-150
    • /
    • 2014
  • In the marine industry although there has been significant growth towards safety, security and risk assessments or risk-based strategies such as marine insurance and regulations to avoid the risks of damage to properties and the environment or the prospect of premature death caused by accidents etc, the moves toward managing the risks which are linked directly to the business functions and decision making processes have been very slow. Furthermore in the marine industry most perceptions, methodologies and frameworks of dealing with hazards, risks, safety and security issues are for their assessment rather than their management. This trend reveals the fact that in different marine industry sectors such as logistics and shipping there is a lack of coherent risk management framework or methodology from which to understand the risk-based decisions especially for the purpose of design, construction, operation, management and even decommissioning of the marine related applications. On the other hand risk management is not yet viewed holistically in the marine industry in order to, for example, assign a right person, i.e. risk manager, who can act as a coordinator and advisor with responsibilities that are only specific to risk management. As a result this paper, by examining the present physical borders and risk-based activities in the marine industry, aims to propose an appropriate risk management methodology in addition to the emergent role of risk managers which will enable the industry users initially to become familiar with the concept of risk management at its holistic level. In the later stages this eventually can lead to development of risk management capabilities at an exclusive level and its integration into the marine industry functions in future.

Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants (원자력발전소 전기기기의 보수, 교체 방법론)

  • Park, Chulhee;Park, Wan-gyu;Lee, Manbok;Kim, Choon-sam
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF