This study analyzed the smart construction safety cost included in safety management plans that are approved before construction. Specifically, it refers to the cost incurred in constructing and operating a safety management system using wireless communication and facilities. Based on the obtained statistical results, an activation policy for the inclusion of the smart construction safety cost in building safety management plans was proposed. The smart construction safety cost must be included in the safety management cost; notably, this is mandated by the Construction Technology Promotion Act. However, there are some problems with the inclusion of smart construction safety costs. To analyze the problems encountered when calculating the smart construction safety cost and including it in safety management plans, in this study, statistical analysis was performed using the data of 1,334 safety management plans received at the Construction Safety Management Integrated Information (CSI) from June to August 2021. The results show that only 50.7% of the safety management plans included the smart construction safety cost although the current law mandates 100% inclusion of these costs. Thus, it is apparent that the smart construction safety costs are only included in a low proportion of sites. In addition, the calculated smart construction safety costs were shown to have a small correlation with the construction cost; moreover, they appeared to be distributed at a constant cost level. In this context, it is believed that perfunctory cost calculations were performed at most sites since the effect of the construction cost on the smart construction safety cost was negligible. Therefore, it is necessary to improve the inclusion of smart construction safety costs by strengthening the authorization process of the approval institute of safety management plans. In addition, institutional support, such as guidelines that promote the calculation and inclusion of appropriate smart construction safety costs according to the characteristics of sites, are needed.
In the Construction Technology Promotion Act (CTPA) of the Republic of Korea, safety management cost is enforced as a statutory cost that must be included in the budget of construction projects. However, the construction of underground electric power transmission facilities (UEPTFs) is not included in the category of construction works defined in the CTPA. Consequently, the statutory safety management cost does not apply to the construction of UEPTFs. To overcome this limitation, the clients of UEPTF construction projects generally provide internal guidelines enabling the addition of the safety management cost in the project budget. Nevertheless, even after the execution of the internal guidelines, some important cost items are omitted from the budget owing to the incompleteness of the guidelines. In this context, this paper proposes a complete set of accounting items and their calculation methods for appropriate budgeting of the safety management cost of UEPTF construction projects. To this end, the current budgeting method of the safety management cost of UEPTF construction projects is analyzed, and a questionnaire study is performed to confirm the necessary cost items and their appropriate calculation methods. Based on the results of the questionnaire study, a set of accounting items and their calculation criteria for the budgeting of the safety management cost of UEPTF construction projects are proposed.
Cost-benefit analysis was investigated to propose the analysis method of the effect of investment and the optimum investment level of safety management cost for preventing gas accident in the B governor station. From five classifications of safety management costs consisting of cost items with similar characters and potential accident costs calculated by risk assessments(FMEA/HAZOP), we found that the order of the benefit(the reduction cost of the potential accident cost) was the instrument increase and repair cost > the safety checking and inspection cost > the labor and training cost > the safety equipment and corresponding cost > the research and development cost. As the benefit was increased with increasing the investment cost, the effect of investment was increased with decreasing the Investment cost. As a result, the optimum safety management cost was estimated and the investment level was analyzed by the model of optimum investment level.
The safety management cost system under the Construction Technology Promotion Act has contributed greatly to the prevention of construction accidents according to the chronological changes and social demand, but various problems have been pointed out. The biggest problem is that the safety management cost is earmarked very low because other items of safety management costs except for the safety inspection are not appropriately included in the actual construction site. Furthermore, it has been pointed out that it is difficult to settle the orderer due to the lack of specific use criteria. Therefore, in order to secure the proper safety management cost, this study is to estimate the actual cost by using of specification, quantity, material cost, labor cost for each type of the safety management item The results of this study were compared with the 71 cases of safety management costs in the safety management plan. In addition, analysis of unclear or unnecessary items in the current safety management cost and criteria and suggestions for improvement are provided. It is hoped that the results of this study will contribute to the rational safety management rate calculation.
The quantitative evaluation method of the safety management cost was suggested to prevent a gas accident as a major industrial accident. In a gas governor station, process risk assessments such as the fault tree analysis(FTA) and the consequence analysis were performed. Based on process risk assessments, potential accident costs were estimated and the cost-benefit analysis(CBA) was performed. From the cost-benefit analysis for five classification items of safety management cost, the order of the cost/benefit ratio was estimated.
Despite the government 's efforts to reduce constructional disasters, it has been pointed out that the safety management cost of the Construction Technology Promotion Act does not reflect the actual site. Therefore, it is necessary to study the proper guideline of the safety management cost which can be used as the most fundamental measure to prevent construction accidents. Moreover for the securement of the reasonable safety management costs, it is important to calculate its appropriate rate. Thus, in this study, the appropriate rate of safety management cost was proposed by the construction cost & type based on the 111 execution plans of safety management cost, and the rate is analyzed to be 1/10 of the occupational safety and health management cost. The results of this study will be a guideline in improvement to the proper schedule rating system improvement and in implement of pilot projects.
The existent system of management for Measurement of Safety Cost are not effective because of the data loss and time loss and occurrence of errors through manual calculation. Therefore, tile development of the software for measurement of safety cost can solve the problem through the systematic calculation for safety cost and converting the related data to database, and also can build the strategy of the investment of Safety cost through analysing and comparing with the past data in the database. As a part of development of the software of Measurement of Safety Cost which is appropriate for the domestic environment, this study is developing a software based on Noguji method, which is one of the methods of Measurement of Safety Cost, and to appraise the efficiency of the management of Measurement of Safety Cost we will implement and improve the software in the case of the domestic enterprises.
The existent system of management for Measurement of Safety Cost are not effective because of the data loss and time loss and occurrence of errors through manual calculation. Therefore, the development of the software for measurement of safety cost can solve the problem through the systematic calculation for safety cost and converting the related data to database, and also can build the strategy of the investment of Safety cost through analysing and comparing with the past data in the database. As a part of development of the software of Measurement of Safety Cost which is appropriate for the domestic environment, this study is developing a software based on Noguji method, which is one of the methods of Measurement of Safety Cost, and to appraise the efficiency of the management of Measurement of Safety Cost we will implement and improve the software in the case of the domestic enterprises.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.168-175
/
2011
Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.
The aim of this study is to develop construction safety and health management cost prediction model using support vector machine (SVM). To this end, theoretical concept of SVM is investigated to formulate the cost prediction model. Input and output variables have been selected by analyzing the balancing accounts for the completed construction project. In order to train and validate the proposed prediction model, 150 data sets have been gathered from field. Effects of SVM parameters on prediction accuracy are analyzed and from which the optimal parameter values have been determined. The prediction performance tests are conducted to confirm the applicability of the proposed model. Based on the results, it is concluded that the proposed SVM model can effectively be used to predict the construction safety and health management cost.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.