• Title/Summary/Keyword: Run-up analysis

Search Result 254, Processing Time 0.025 seconds

Analysis of Resonance for Drive-train in Wind Turbine (풍력발전기 드라이브트레인 공진 해석)

  • Leem, Sang-Hyuck;Park, Sun-Ho;Bang, Jo-Hyug;Chung, Chin-Wha;Ryu, Ji-Yune
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.27 no.1
    • /
    • pp.20-27
    • /
    • 2017
  • This study investigated the problems in current practice of drive-train resonance analysis procedure and suggested solutions. The first problem is the resonance occurrence at the un-identified resonance point by the current practice, as for a solution the force spectrum analysis for each critical force transmitting component was suggested. The second one is the inaccurate estimation of potential resonance point in eigenfrequency analysis because of the non-consideration about the eigenfrequency dependency on rotor-speed, the fine linearization at each rotor speed point all over operational range was proposed to account for the affection. Lastly the insufficient time for resonance activation under run-up simulation condition was recognized as a problem in resonance load increasing analysis, as an alternative, steady state condition was suggested to estimate the maximum load increasing level.

Limiting the Number of Open Projects to Shorten the NPD Schedule

  • Wang, Miao-Ling;Yang, Chun-I;Chang, Sheng-Hung
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.1
    • /
    • pp.34-42
    • /
    • 2011
  • Many companies open multiple projects simultaneously due to market trends, which results in a crowding out effect because of limited resources. R&D engineers become overloaded and scheduling of product development is delayed resulting in timing misses and lost sales leads. The company in this case study (Company A), often opens up many projects simultaneously in order to respond to market needs quickly. The engineers are overloaded and, of course, the schedule is delayed. In order to identify problems, Company A began using Dr. Goldratt's Thinking Processes (TP) during new product development (NPD). When the analysis phase of TP was completed, Company A's core problem was identified as "the quantity of kick-off projects." Consequently, new rules and conditions and procedures were proposed for the opening, suspending, stopping, and closing of projects. Finally, the "Future Reality Tree" ensured that the proposed rules, conditions and procedures were set up as an available solution approved for practical application by executives. After a one-year trial run, the results showed that the Project Duration Rate was reduced by 53%, the Project Closed Rate was increased by 140% and the Project on Time Rate was increased from 10% to 68%. The above results give significant evidence of the benefits of the proposed methodology.

Cogging Torque Reduction in Permanent-Magnet Brushless Generators for Small Wind Turbines

  • Chung, Dae-Won;You, Yong-Min
    • Journal of Magnetics
    • /
    • v.20 no.2
    • /
    • pp.176-185
    • /
    • 2015
  • We present the design optimization of the magnetic pole and slot design options that minimize the cogging torque of permanent-magnet (PM) brushless generators for small wind turbine generators. Most small wind-turbines use direct-driven PM generators which have the characteristics of low speed and high efficiency. Small wind-turbines are usually self-starting and require very simple controls. The cogging torque is an inherent characteristic of PM generators, and is mainly caused by the generator's geometry. The inherent the cogging torque can cause problems during turbine start-up and cut-in in order to start softly and to run a power generator even when there is little wind power during turbine start-up. Thus, to improve the operation of small turbines, it is important to minimize the cogging torque. To determine the effects of the cogging torque reductions, we adjust the slot opening width, slot skewing, mounting method of magnets, magnet shape, and the opening and combinations of different numbers of slots per pole. Of these different methods, we combine the methods and optimized the design variables for the most significant design options affecting the cogging torque. Finally, we apply to the target design model and compare FEA simulation and measured results to validate the design optimization.

Numerical analysis of water flow characteristics after inrushing from the tunnel floor in process of karst tunnel excavation

  • Li, S.C.;Wu, J.;Xu, Z.H.;Li, L.P.;Huang, X.;Xue, Y.G.;Wang, Z.C.
    • Geomechanics and Engineering
    • /
    • v.10 no.4
    • /
    • pp.471-526
    • /
    • 2016
  • In order to investigate water flow characteristics after inrushing in process of karst tunnel excavation, numerical simulations for five case studies of water inrush from the tunnel floor are carried out by using the FLUENT software on the background of Qiyueshan high risk karst tunnel. Firstly, the velocity-distance curves and pressure-distance curves are drawn by selecting a series of probing lines in a plane. Then, the variation characteristics of velocity and pressure are analyzed and the respective optimized escape routes are made. Finally, water flow characteristics after inrushing from the tunnel floor are discussed and summarized by comparing case studies under the conditions of different water-inrush positions and excavation situations. The results show that: (1) Tunnel constructors should first move to the tunnel side wall and then escape quickly when water inrush happens. (2) Tunnel constructors must not stay at the intersection area of the cross passage and tunnels when escaping. (3) When water inrush from floor happens in the left tunnel, if tunnel constructors meet the cross passage during escaping, they should pass through it rapidly, turn to the right tunnel and run to the entrance. (4) When water inrush from floor happens in the left tunnel, if there is not enough time to escape, tunnel constructors can run to the trolley and other equipment in the vicinity of the right tunnel working face. In addition, some rescuing equipment can be set up at the high location of the cross passage. (5) When water inrush from floor happens in the cross passage, tunnel constructors should move to the tunnel side wall quickly, turn to the tunnel without water inrush and run to the entrance. (6) When water inrush from floor happens in the cross passage, if there is not enough time to escape, tunnel constructors can run to the trolley and other equipment near by the left or the right tunnel working face. The results are of important practical significance and engineering value to ensure the safety of tunnel construction.

Validation of ICP-MS method for trace level analysis of Pb in plasma (혈장 중 극미량 납 분석을 위한 ICP-MS 분석법 검증)

  • Lee, Sung-Bae;Kim, Yong-Soon;Lee, Yong-Hoon;Ahn, Byung-Joon;Kim, Nam-Soo;Lee, Byung-Kook;Shin, Ho-Sang
    • Analytical Science and Technology
    • /
    • v.28 no.5
    • /
    • pp.309-316
    • /
    • 2015
  • The analytical method of lead in plasma by ICP-MS was validated after securing environment within class 1,000 classification. We tested specificity and accuracy of within-run and between-run. According to measurement of the amount of suspended particulates in a clean room, 0.3~62 particles were detected in 0.3 µm size while 0.0~28.3 particles were observed in 0.5 µm size. Total suspended particulates met required environment with up to 90.3 particles. The MDL (Method detection limit) of the sample which has been fabricated using fetal bovine serum (FBS) blank was 1.77 ng/L, and LOQ (Limit of quantification) was 5.55 ng/L. The slope, intercept and correlation coefficient of the calibration curve were y=1.09×10−3x+4.88×10−2 and r=0.9999, which showed good correlation. The specificity, within-run and between-run accuracy satisfied the standard at more than 50 ng/L. The average lead concentration in plasma of the general people, current workers and retired workers was 55.4 ng/L, 440 ng/L, and 132 ng/L.

Asset Prices and Consumption Dynamics in Korea (자산가격변동과 민간소비의 동태적 반응)

  • Kim, Young Il
    • KDI Journal of Economic Policy
    • /
    • v.32 no.4
    • /
    • pp.35-73
    • /
    • 2010
  • This paper examines consumption dynamics in relation to asset prices in Korea. Empirical analysis based on the error correction model shows that personal consumption is affected by changes in asset prices but the consumption converges to the long-run level of consumption corresponding to the total income flow in two years. This adjustment in consumption implies that the consumption error, reflected in the error correction term, should have predictability for the future consumption growth during the adjustment period. It is found that the error correction term has a long-run predictability for consumption over up to about 3 years; thus, confirming the error correction model. It is also found that housing prices have larger effects on consumption compared with stock prices in Korea. In addition, the effects of income and asset prices on consumption show bigger effects during contractionary period than expansionary period in business cycles. This paper also analyzes effects of asset wealth that reflects changes in both price and quantity. It is found that asset wealth has a long-run effect on consumption in addition to total income as determinants of consumption. Since wealth effects usually indicate the long-run effect of changes in asset wealth on consumption that is not explained by labor income, which is the proxy for human source of wealth, it is estimated with labor income used as a control variable. According to the estimation, the marginal propencity to consume out of asset wealth is approximately 2%. It means that 1,000won increase in asset wealth may lead to 20 won increase in consumption.

  • PDF

Modeling and analysis of selected organization for economic cooperation and development PKL-3 station blackout experiments using TRACE

  • Mukin, Roman;Clifford, Ivor;Zerkak, Omar;Ferroukhi, Hakim
    • Nuclear Engineering and Technology
    • /
    • v.50 no.3
    • /
    • pp.356-367
    • /
    • 2018
  • A series of tests dedicated to station blackout (SBO) accident scenarios have been recently performed at the $Prim{\ddot{a}}rkreislauf-Versuchsanlage$ (primary coolant loop test facility; PKL) facility in the framework of the OECD/NEA PKL-3 project. These investigations address current safety issues related to beyond design basis accident transients with significant core heat up. This work presents a detailed analysis using the best estimate thermal-hydraulic code TRACE (v5.0 Patch4) of different SBO scenarios conducted at the PKL facility; failures of high- and low-pressure safety injection systems together with steam generator (SG) feedwater supply are considered, thus calling for adequate accident management actions and timely implementation of alternative emergency cooling procedures to prevent core meltdown. The presented analysis evaluates the capability of the applied TRACE model of the PKL facility to correctly capture the sequences of events in the different SBO scenarios, namely the SBO tests H2.1, H2.2 run 1 and H2.2 run 2, including symmetric or asymmetric secondary side depressurization, primary side depressurization, accumulator (ACC) injection in the cold legs and secondary side feeding with mobile pump and/or primary side emergency core coolant injection from the fuel pool cooling pump. This study is focused specifically on the prediction of the core exit temperature, which drives the execution of the most relevant accident management actions. This work presents, in particular, the key improvements made to the TRACE model that helped to improve the code predictions, including the modeling of dynamical heat losses, the nodalization of SGs' heat exchanger tubes and the ACCs. Another relevant aspect of this work is to evaluate how well the model simulations of the three different scenarios qualitatively and quantitatively capture the trends and results exhibited by the actual experiments. For instance, how the number of SGs considered for secondary side depressurization affects the heat transfer from primary side; how the discharge capacity of the pressurizer relief valve affects the dynamics of the transient; how ACC initial pressure and nitrogen release affect the grace time between ACC injection and subsequent core heat up; and how well the alternative feeding modes of the secondary and/or primary side with mobile injection pumps affect core quenching and ensure stable long-term core cooling under controlled boiling conditions.

Vibration Analysis and Mitigable Countermeasures of Semi High-speed Subway Electric Trains (준고속 도시철도의 진동분석 및 저감대책)

  • Park, Ki-Soo;Choi, Yeon-Sun
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.18 no.10
    • /
    • pp.1014-1023
    • /
    • 2008
  • Subway electric trains need to be faster for accommodation of long distance passengers. The faster run of the existing trains results in deterioration of ride quality due to noise and vibration. To reduce the noise and vibration of the electric train, a running test of the electric train was performed and an ADAMS/Rail model was set up to verify the running test results. The experimental results show that the sources of the cabin noise and vibration basically comes from the irregularity of the railroad track and the deterioration of the connection part between cabin and bogie. Consequently for mitigation of noise and vibration of the electric train, the redesign of the center pivot with softer stiffness and the minimization of rail irregularity are necessary. the frequent maintenance of the train will lead to better comport.

Brake Characteristic Analysis of the Korean High-Speed Train (한국형 고속전철의 제동 특성 해석)

  • 정재붕;강철구
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.3
    • /
    • pp.232-238
    • /
    • 2004
  • The brake system of a high-speed train has a crucial role for the safety of human mass transportation. However, it is hard to acquire design parameters of the brake system in the design step of the new high-speed train. In this paper, we build a HILS (Hardware In-the- Loop Simulation) system for the brake system of the Korea High-Speed Train (KHST) that is supposed to run up to 350 km/h, and analyze the characteristics of the brake system of the KHST (composed of 7 cars) via real-time simulations. In the HILS system that is built using a DSP board of dSPACE, the dynamics of the 7 car bodies and several bogies and characteristics of springs and dampers of connection devices between cars are considered separately. Simulation results show that the designed brake system of the KHST is valid and satisfies design specifications.

Wave overtopping control by the use of ecosystem control structures (생태계 제어구조물의 월파제어 특성)

  • 김현주;류청로
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.2
    • /
    • pp.122-130
    • /
    • 1997
  • Coastal diaster induced by waves and countermeasures were investigated in the viewpoint of reduction of overtopping rate with enviroment in fishing port. The reduction method of wave overtopping rate using ecosystem control structures was proposed and studied on the efficiency by hydraulic and numerical experiments. The estimation models on wave overtopping rate was proposed after comparing previous models with dimensional analysis and experimental results. Control function o fwave overtopping by use of ecosystem controlstructures was simulated and discussed with combining wave shoaling-dissipation-breaking deformation model around ecosystem control structures and newly proposed calculation model for wave overtopping rate. Feasiblilty of ecosystem control structures could be confirmed for reduction of wave overtopping and fisheries-based multipurpose development of coastal zone.

  • PDF