• Title/Summary/Keyword: Rubber-Tired Automated Guideway Transit(AGT) Vehicle System

Search Result 4, Processing Time 0.023 seconds

- Reliability Management of the Rubber-Tired AGT Vehicle System - (고무차륜 AGT 차량시스템의 신뢰성관리체계 개발)

  • Han Seok Youn;Kim Jong Gurl;Hong Soon Ki;Ha Chen Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.4
    • /
    • pp.139-153
    • /
    • 2004
  • Korea Railroad Research Institute(KRRI) has developed the rubber-tired AGT system from 1999 to 2004. The rubber-tired AGT vehicle is now on test for its performance and function in the Gyeong-San test line. In this paper, we provide the reliability management plan to assure required the RAMS(reliability, availability, maintainability 8t safety) of the AGT vehicle system.

Reliability Management of the Rubber-Tired AGT Vehicle System (고무차륜 AGT 차량시스템의 신뢰성관리체계 개발)

  • Han Seok Yun;Kim Jong Geol;Hong Sun Gi;Ha Cheon Su
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.171-182
    • /
    • 2004
  • Korea Railroad Research Institute(KRRI) has developed the rubber-tired AGT system from 1999 to 2004. The rubber-tired AGT vehicle is now on test for its performance and function in the Gyeong-San test line. Tn this paper, we provide the reliability management plan to assure required the RAMS(reliability, availability, maintainability & safety) of the AGT vehicle system.

  • PDF

Requirements Validation Plan for korean Rubber-Tired AGT System (한국형 고무차륜 경량전철시스템에 대한 요구사항 검증계획)

  • Mok, Jae-Gyun;Lee, An-Ho;Han, Seok-Yun
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.27-31
    • /
    • 2003
  • This study is in a part of requirements validation plan for korean rubber-tired AGT system on test track. The AGT system is consisted subsystems as vehicle, signalling, communication, power distribution and infrastructure for rubber tire running on track. The subsystems will be installed and integrated on test track till next year for test and evaluation. This paper shows overview for test and evaluation in terms of system requirements and its validation classification, test track configuration, measuring system requirements and its configuration. The whole process of system integration and its validation will be controlled by means of KMS including documentation.

  • PDF

Radio coverage prediction of RF-CBTC system under transmission power 10mW/MHz at K-AGT test line (경전철시험선에서 송신전력 10mW/MHz에 대한 열차제어용 무선시스템의 전파도달범위 예측)

  • Cho, Bong-Kwan;Jung, Jae-Il
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.589-595
    • /
    • 2007
  • Korea Railroad Research Institute has developed the driverless rubber-tired K-AGT (Korean-Automated Guideway Transit) system from 1999 to 2005 and has done its performance and reliability tests on the test line at Gyeongsan-city. Radio Frequency Communication-Based Train Control system of K-AGT, which employed Advanced Automated Train Control scheme, detects train position using the radio propagation delay between wayside and vehicle radio equipment. In this paper, we investigate whether the transmission power of radio system can be reduced to the permitted level announced by the Ministry of Information and Communication for license-free ISM(Industrial Scientific Medical) frequency bands. We first determine radio propagation model, using the measured data at test line, and perform simulation for radio coverage prediction. From the simulation results, we identify that the radio system operated with reduced power can provide good link quality in total test line.