• Title/Summary/Keyword: Rolling horizon tabu search

Search Result 2, Processing Time 0.018 seconds

Improved Dispatching Algorithm for Satisfying both Quality and Due Date (품질과 납기를 동시에 만족하는 작업투입 개선에 관한 연구)

  • Yoon, Ji-Myoung;Ko, Hyo-Heon;Baek, Jong-Kwan;Kim, Sung-Shick
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.6
    • /
    • pp.1838-1855
    • /
    • 2008
  • The manufacturing industry seeks for improvements in efficiency at the manufacturing process. This paper presents a method for effective real time dispatching for parallel machines with multi product that minimizes mean tardiness and maximizes the quality of the product. What is shown in this paper is that using the Rolling Horizon Tabu search method in the real time dispatching process, mean tardiness can be reduced to the minimum. The effectiveness of the method presented in this paper has been examined in the simulation and compared with other dispatching methods. In fact, using this method manufacturing companies can increase profits and improve customer satisfaction as well.

A Restricted Neighborhood Generation Scheme for Parallel Machine Scheduling (병렬 기계 스케줄링을 위한 제한적 이웃해 생성 방안)

  • Shin, Hyun-Joon;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.15 no.4
    • /
    • pp.338-348
    • /
    • 2002
  • In this paper, we present a restricted tabu search(RTS) algorithm that schedules jobs on identical parallel machines in order to minimize the maximum lateness of jobs. Jobs have release times and due dates. Also, sequence-dependent setup times exist between jobs. The RTS algorithm consists of two main parts. The first part is the MATCS(Modified Apparent Tardiness Cost with Setups) rule that provides an efficient initial schedule for the RTS. The second part is a search heuristic that employs a restricted neighborhood generation scheme with the elimination of non-efficient job moves in finding the best neighborhood schedule. The search heuristic reduces the tabu search effort greatly while obtaining the final schedules of good quality. The experimental results show that the proposed algorithm gives better solutions quickly than the existing heuristic algorithms such as the RHP(Rolling Horizon Procedure) heuristic, the basic tabu search, and simulated annealing.