• Title/Summary/Keyword: Road users cost

Search Result 41, Processing Time 0.021 seconds

Framework to Compute Vehicle Emission Costs Associated with Work Zones

  • Shrestha, K. Joseph;Adebiyi, Jeremiah;Uddin, Mohammad Moin;Sturgill, Roy
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.952-959
    • /
    • 2022
  • Active construction work zones will result in longer travel time and/or longer travel distances for road users because of reduced speed limits and/or detours. This results in increased fuel consumption and increased emissions of harmful gases such as Carbon Monoxide (CO), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx), which causes discomfort to the environment and road users around the work zone. The impact of such emissions should be considered while designing work zones or determining the number of days the roadway will be allowed to be closed partially or fully. This study develops a methodology to compute additional road user costs associated with such work zones. To achieve this goal, a) an extensive literature review is conducted, b) a framework to compute emission cost is developed, c) emission rates are computed for all counties (95) of the state of Tennessee, and d) a case study is conducted to demonstrate the use of the framework to estimate the additional impact of emission because of the work zone. For the case study conducted, the emission cost was computed to be $10,653.60 for the duration of the project. State DOTs can account for such road user costs while selecting contractors using A+B bidding. Accounting for such impact of emission will also indicate the agency's willingness to consider sustainability as a part of the business practices.

  • PDF

Development of Korean Life Cycle Cost Analysis Model for Road Pavement Asset Management (도로포장자산관리를 위한 한국형 생애주기비용 모형 개발)

  • Han, Daeseok;Do, Myungsik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1639-1650
    • /
    • 2013
  • Road pavement management is an important activity that affects to national economy, movement and safety of people, and also demands huge amount of budget. Therefore, its management strategy must be established under objective information. In addition, decision support system that produces the management strategy needs to consider practical benefits from various aspects. Considering these aspects, this paper aimed to develop a customized Korean life cycle cost analysis model estimating various effects on road users and socio-environmental costs based on pavement condition. The suggested LCCA model focused on Korean national highway, and tried to adopt a national guideline recommended by Korean government for securing credibility of estimation results. In the development processes, some of the suggestions that do not fit well in the situations of pavement management field were added, altered, or partially modified. These attempts to develop customized asset management system would be an important step to break away from passive attitudes relying on ready-made software, but also to improve awareness about the social benefits from the better maintenance strategy.

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

Evaluation of a Traffic Lane Closure and Pavement Repair for a Certain Period (Focusing on the Gimcheon~Sunsan Project) (1차로 전면차단 후 도로포장 보수방법의 효과분석 (김천~선산 사례중심))

  • Ryu, Sung Woo;Park, Kwon-Je;Han, SeungHwan;Choi, InGu;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.11-19
    • /
    • 2016
  • PURPOSES : This study supports the evidence that it is possible to rehabilitate a damaged pavement with a lane closure specifically based on the Gimcheon~Sunsan project. METHODS : The prediction results from the simulation programs were compared with field monitoring, which focused on traffic management planning, congestion (length, time, and passing speed), bypass, and user cost, among others. RESULTS : The research results showed that lane closure application and pavement repair of the aged pavement in Korea were possible, even though the prediction results were minimally different from the field monitoring. The road agency contributes to service life extension of the rehabilitated pavement using this method. CONCLUSIONS : A marginal effect caused by the lane closure was observed on travelling users or vehicles, and the user cost of pavement repair decreased. Therefore, introducing the repair method or rehabilitation in Korea is possible. Information dissemination through various media was properly done to execute the project well. Moreover, the construction area traffic utilized nearby alternative roads. Therefore, improving the repaired pavemen's service life while ensuring that the pavement management agency can provide a road with comfortable user riding quality was possible.

Service for Bicycle Use Information Based on Low Carbon Green Growth (저탄소 녹색성장 기반의 자전거 이용정보 서비스)

  • Kim, Eui-Myoung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.3
    • /
    • pp.75-81
    • /
    • 2010
  • Existing studies on the bicycle road were mostly for the promotion of bicycle road through the creation of bicycle road. However, as the gradually increase of bicycle users, it has been required service based on low carbon green growth in order to promote the use of bicycles which are green means of transportation. Analysis of existing bicycle use information is mainly based on calculating the amount of exercise, so the diverse needs of bicycle user does not accommodated. Therefore, in this study, it is proposed that methodology compute to reduce cost or amount of carbon dioxide, fuel, and processing costs of global warming by using bicycle. For this, a program is implemented to display bicycle use information provided in the form of GPX based on Google Earth in three-dimensional environment and to service based on low carbon, green growth. The developed program is compared with existing commercial software. Through this study, new services have been developed to carry out low carbon and green growth in terms of bicycle users, and it is considered that the services can be applied to devices such as smart phones.

Economic Analysis of Concrete Panel Replacement of PSC Bridge with Embedded Demountable Shear Connector (매립형 분리식 전단연결재를 적용한 PSC교 콘크리트 바닥판 교체공사의 경제성 분석)

  • Soon-Hwan, Lee;Jong-Eon, Kim;Jae-Gyu, Kim;Se-Hyun, Park;Dae-Sung, Jung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.4
    • /
    • pp.376-385
    • /
    • 2022
  • The embedded demountable shear connector was developed in preparation for replacement works due to deterioration and damage to the bridge panel of the PSC girder bridge which is a road infrastructure directly related to the safety and convenience of the people. The demountable shear connector minimizes crushing works in the demolition process of the panel, and it is easy to re-construct the shear connector for replacement work. The economic feasibility of the PSC girder bridge using the embedded demountable shear connector compared to the existing construction method was analyzed from the perspective of road users (people) by calculating and comparing the cost of road users caused by traffic blocking during each construction method.

A Study on Cost Prediction of Highway Operating Risk through a Case Study of Power Failure (정전사고 사례분석을 통한 고속도로 운영 위험비용 산정에 대한 연구)

  • Kwon, Yong-Hoon;Kim, Kyong-Ju;Lim, Won-Seok;Park, Chan-Jin;Chae, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.78-90
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

A Study on the Selection Method of Project Procurement System based on Owner's Requirement (발주자의 요구사항을 고려한 발주방식 선정 방법에 관한 연구)

  • Nam, Hye-Won;Ahn, Kyung-Hwan;Kim, Chang-Gyo;Lee, Jea-Sauk;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.126-135
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

The Study on Sensitivity Analysis of Domestic Road using PSD (PSD선도를 이용한 국내노면의 민감도 분석에 관한 연구)

  • Bae, Chul-Yong;Kim, Chan-Jung;Kwon, Seong-Jin;Lee, Bong-Hyun;Kim, Hyun-Chul
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.326-331
    • /
    • 2006
  • The durability of recent motors is longer than the past one because there are the rapid technique development of the automobile industry and the vehicle maintenance of users. And then the importance of the durability test due to vibration is increased from day to day. So full vehicle and parts companies accomplish the durability test using various methods. The most public test method among them is the reliable field test but it bring on higher cost and period of the development process. The durability test using MAST(multi axis simulation table) is a solution in order to improve the development process of automobiles. Generally its excitation source uses the optimized road profiles that are obtained by the road test of belgian road, country road, cobbleston road and so on instead of a real field but the interrelations and influences accordingly vehicle damage are considered by a field test between specific roads and real fields in the first place. Therefore this study, in order to accomplish a basic research for the durability test using the MAST, performed on the real field driving test at various domestic roads and the results which are analyzed by PSD(power spectrum density) are compared with relative sensitivity among the roads. Consequently they can present a basic material for generation of road profiles which is applied to the durability test using MAST.

  • PDF