• Title/Summary/Keyword: Road project

Search Result 534, Processing Time 0.024 seconds

An Alternative Strategy on Minor Rural Road Improvement Project (농어촌도로 정비사업의 정책적 전개방향)

  • Choi, Soo-Myung;Choi, Dong-Jin
    • Journal of Korean Society of Rural Planning
    • /
    • v.8 no.2 s.16
    • /
    • pp.42-49
    • /
    • 2002
  • Since legislation of Rural Minor Road Improvement Act 1990, a quarter of its total length had been paved now. However, over 80% of arterial road length(national+provincial roads) had been paved, so, road improvement policy should be focussed on the local road(county+rural minor roads) from now. Generally, in the greater part of coastal plain and island areas, arterial road intensity(total road length/total catchment area) is relatively low, but local road intensity is relatively high. So, in terms of balanced development, much more efforts for rural minor road improvement should be concentrated in coastal plain and islands areas. In Chonnam Province, the maximum differentials of minor rural road improvement ratio was over 20%(the lowest; 14.1% in Goheung, the highest; 35.6% in Goksung) in 1999, but the improvement budget have been allocated in proportion to unpaved road length of each county by the provincial government. However, the differentials should not be fairly narrowed in the near future if the present budget allocation policy be maintained. To solve this problem, target differentials of rural minor road improvement between regions should be set up for each planning year and road improvement budget be allocated according to this policy change.

Establishment present of fish-road in Kangwondo and Study to apply fish-road is ice harbor 1-type (강원도 어도의 설치 현황 및 I형 아이스하버식 어도 적용성 연구)

  • Choi, Han-Kuy;Choi, Young-Soo;Jeon, Young-Soo
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.63-71
    • /
    • 2006
  • The concerned object of the construction industry is environment. It is one of the main purposes of today's construction that human can live reasonably in nature. This study is about the fish-road connecting hydraulic structure in the river with nature. Chapter 2, starting with the general investigation about fish-road and helps comprehension for relatively general fish-road such as necessity, establishment purpose, history, study example, relating domestic law, design condition, consideration and form of fish-road. Chapter 3, containing the present condition of fish-road facilities in Gangwon-Do and thoughts of the problems and general countermeasures of existing fish-road. Chapter 4, Having Examined compatibility by amount of flowing water through hydraulic model test in the Ice harbor I-type model. chapter 5, Analyzation and arrangement to efficient establishment plan of fish-road and the result of the hydraulic model experiment to be beaconed a little in forward fish-road study. In the hydraulic model test result, when we suppose establishment of 1~3 in slope of 1/20, could know that applicable drought flow of the river is $0.06{\sim}3.0m^3/sec$ in case of Ice harbor I-type which transforming Ice harbor that was invented as studying project of the Ministry of Environment.

  • PDF

Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system - (도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 -)

  • Yoo, Ji-Oh;Shin, Hyun-Jun;Kim, Jong-Won
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.

  • PDF

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

  • Yutaka Okamura
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.178-184
    • /
    • 2004
  • The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed. The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area. The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately $40\%$ in the areas for which change is planned. Furthermore, approximately $20\%$ of the area to be changed is restored by returning soil to the roof of the shelter.

  • PDF

Acquisition of Evidential Information to Control Total Volume of Road Density per Tributary Watershed (도로밀도에 대한 소하천 유역 기반의 총량규제 기초자료 확보 방안)

  • Um, Jung-Sup
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.317-335
    • /
    • 2005
  • This paper is primarily intended to propose a new concept of "aggregate control of road density" which is defined as the area-wide road surface per watershed area. An empirical study for experimental sites was conducted to confirm how a standard GIS technology can be used to assist in estimating the road density in terms of total volume threshold control. Guidelines for a replicable methodology are presented to provide a strong theoretical basis for the standardization of factors involved in the estimation of the road space threshold; the meaningful classification of road types, delination of watershed boundary, interpretation for distribution trends of road density etc. A variety of visual maps using overlay analysis can be generated over large areas quickly and easily to show the fact that some degree of road space already exists in the experimental sites. They could be used as an evidence to limit further construction of road network in comparison with other tributary watershed. It is anticipated that this research output could be used as a valuable reference to confirm the potential of introducing the new concept of "site specific road density" to support more scientific and objective decision-making in the process of road construction project.

Analysis of Traffic Accident Reduction Performance of High-quality and Long-life Pavement Marking Materials (고기능·장수명 차선도료의 교통사고 감소효과 분석)

  • Lee, Myunghwan;Choi, Keechoo;Oh, In Seop;Kim, Junghwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.921-929
    • /
    • 2015
  • Road conditions which obstruct the driver from seeing road markings, such as in the evening or in the rain, due to the lack of a light source gives way to increasing the risk of traffic accidents. In order to increase road safety, the Korea Expressway Corporation set up a pilot project which used high-quality materials along a section of the Gyeongbu Expressway between Daejeon and Pangyo. There is little research on high-quality materials in the field of pavement marking. This study introduces high-quality materials used in pavement materials, presents the results of a survey conducted to examine the effect of the pilot project and analyzes traffic accident data from before and after the implementation of the pilot project. The survey results show that 87% of the respondents were highly satisfied with the pilot project. With the goal of evaluating the effect of the pilot project, this study used traffic accident data provided by the Korea Expressway Corporation accident data and performed a before-after study of the number of traffic. The results of data analysis show that there were 62 and 48 traffic accidents before and after the implementation of the pilot project. In addition, the result of Emperical Bayes Method indicates that there is an 41.7% decrease in the number of traffic accidents as an effect of High-quality Pavement Marking Materials.

Analysis of Air Quality Change of Cheonggyecheon Area by Restoration Project (청계천복원공사에 따른 청계천과 주변지역의 대기질 변화분석)

  • Jang, Young-Kee;Kim, Jeong;Kim, Ho-Jung;Kim, Woon-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.1
    • /
    • pp.99-106
    • /
    • 2010
  • The project of Cheonggyecheon revived the 5.8 kilometer stream and it removed the cover of stream and Cheonggye elevated road. It was begin October of 2003 and completed October of 2005. The purpose of this study is to analyze the air pollution change of Cheonggyecheon area and neighboring area from before and after the project. The change of concentration is compared with an air monitoring station data and measurement data. The analyzed pollutants are $NO_2$, $PM_{10}$, heavy metal, VOC which are measured at Cheonggyecheon and neighboring area. As the results, $NO_2$ concentration shows 10 % decreases in Cheonggyecheon area and neighboring area shows 16 % decreases by Chenoggyecheon restoration, and $PM_{10}$ concentration shows 15 % decreases in Cheonggyecheon area and neighboring area shows 16 % increases. One of VOC, benzene is increased in Cheonggyecheon area compared with neighboring area but Toluene, Ethylbenzene, m+p Xylene increased in neighboring area. After the Cheonggyecheon restoration, The heavy metals are not shows the improvement, but $PM_{10}$ and $NO_2$ concentration improved more than the changes of neighboring area. These improvements of pollution due to reduction of transportation and clearing of elevated road by Cheonggyecheon restoration project.

Install and Evaluation of Community Design Workshop Program for Regional Linking Cooperation Projects -Case Study on Community Design Workshop of 'Sejong Healing Road 100 Project'- (지자체간 연계협력사업 추진을 위한 마을만들기 대학 프로그램의 적용과 평가 -세종대왕 100리길 사업 마을만들기 대학의 사례를 중심으로-)

  • Park, Chung-Shin;Kim, Seung-Geun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.2
    • /
    • pp.43-50
    • /
    • 2015
  • The purpose of this study is to examine application possibility as the inhabitants educational program for community design workshops of regional linking cooperation project "Sejong healing road 100 project". As a results follows : First, It can confirm inhabitants ability reinforcement through administration of the 8-week educational program, and a participation rate is important in it. Second, 'The tool of inhabitants opinion expression using a Post-it' is easy as a tool of the workshops, and the effect improves if It use a drawing together. Third, 'The tool of inhabitants opinion expression using figure card' is the most effective as expression of the inhabitants intention as a tool of the workshops, but preparations process is complicated. Moreover, for the inhabitants participation in regional linking cooperation projects, the development system of a more systematic inhabitants intention expression is necessary.

A Study on Utilization of Private Capital for Efficient Highway Pavement Management (효율적인 고속도로 유지관리를 위한 민간자본 활용방안 연구)

  • Lee, Inbum;Lee, Yongjun;Park, Samjae;Cho, Hyunje;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.3-11
    • /
    • 2018
  • In order to find methods to encourage active private participation for efficient road maintenance, this study examined the status of the road improvement project and the development of the private capital utilization improvement project. Based on this, the study conducted a case study and a financial feasibility study that applied the new business method and selected the applicable business method. As a result, it is analyzed that the method of using Crowd Funding is more advantageous than the private scheme of the private capital utilization improvement project. This is because it will be highly effective in raising funds from users of highway users, especially users of improvement projects. In addition, it can also mean that the road users who suffer from inconvenience due to the construction can return the toll profit of road construction to the user.