• Title/Summary/Keyword: Road project

Search Result 535, Processing Time 0.021 seconds

A Study on the Efficient Methods of Rail Transport Network under the Eurasia Initiative (유라시아 이니셔티브에서의 철도운송네트워크 효율화방안)

  • Choi, Han-Byul;Choi, Seok-Beom
    • Korea Trade Review
    • /
    • v.41 no.3
    • /
    • pp.109-133
    • /
    • 2016
  • Major nations undergone grand national strategy regarding Eurasia such as China's One Belt and One Road Strategy and Korea's Eurasia Initiative owing to Eurasia's regional importance. Korea's Eurasia Initiative aims to make one continental, creative continental, peaceful continental with intra-Eurasian nations as grand national strategy is based on creative economy, undertaken by President Park's Government for the future of Eurasia after the Northeast Asian logistics hub strategy. Eurasia Initiative includes logistics network project as an important one which consists of Eurasia Friendly Express, Rajin-Hassan logistics project, the Arctic Ocean route project and Rail transport network project. The success of Eurasia Initiative depends on North Korea. The purpose of this paper is to contribute to the improvement of prompt logistics network by networking main rail transport and other transports such as inland waterway transport and air transport by studying the current situation of Eurasia Express project, including rail transport network and the efficient methods of Eurasia logistics. The efficient methods of rail transport network under the Eurasia initiative are construction of multimodal logistics network connected with rail, international cooperation for logistics standardization in Eurasia, Eurasia nations' subscription of logistics-related conventions and projects performance based on these conventions, etc.

  • PDF

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Impact on Introduction of the Alien Plants by Road Development Projects (도로개발 사업이 외래식물 유입에 미치는 영향)

  • Chu, Yunsoo;Kim, Jung-Kwon;Lee, Hyohyemi
    • Ecology and Resilient Infrastructure
    • /
    • v.4 no.3
    • /
    • pp.156-168
    • /
    • 2017
  • Linear development such as road and railway construction is considered to be an important factor in the dipersion agent of alien species. The purpose of this study is to investigate the effect of road project implementation on the introduction of alien plants. We selected the roadworks that have been completed or completed by more than 70% of the projects in the Han River basin environment agency. The alien plant data were divided into five phases: pre-construction (P0) and construction (P25, P50, P75, P100) according to the annual process rate. As the construction progresses, the naturalization rate, the urbanization index and the tendency of the number of exotic plants increase. Especially, alien plants were introduced rapidly at the beginning of the construction period, and the introduced species continued to appear until the construction was completed. Therefore, it is necessary to minimize the introduction of ailen plants by concentrating management of embankment process and the vegetation restoration process at the beginning of roadworks.

Temporal and Spatial Distributions of PM10, NOx and O3 around the Road (도로 주변의 PM10, NOx 및 O3의 시공간적 농도 분포 연구)

  • Kwon O-Yul;An Young-Sang
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.22 no.4
    • /
    • pp.440-450
    • /
    • 2006
  • PM10, NOx, and $O_3$ were measured at six locations, of which each three is horizontally and vertically distributed respectively, in an apartment complex around the heavily traffic road. Those were measured seven times a day with two hours interval starting from 8 o'clock in the morning for 15 days during May 2005 $\sim$ September 2005. PM10 and NOx showed high concentrations in rush hours while low concentrations in midday due to the direct emissions from automobiles in operation. Temporal variations of 01 showed very much similar trend appeared in normal urban atmospheres. The spatial distributions of PM10, NOx and $O_3$ showed that almost all of concentrations were higher in a row of Roadside > Surface at 130 m apart from the road > Surface at 230 m apart from the road > 3rd floor of apartment building > 15th floor of apartment building > 27th floor of apartment building. Model equations, which can project spatial concentration distributions, were constructed by combining the horizontal and the vertical linear regression equations derived from six mean values corresponding to six measuring locations. According to inter-comparison of PM10, NOx, and $O_3$ with the constructed model equations, concentration gradients were higher in a row of Vertical direction of NOx > Vertical direction of PM10 > Horizontal direction of NOx > Horizontal direction of PMIO > Vertical direction of $O_3$ > Horizontal direction of $O_3$. Why concentration gradient of particulate PM10 is lower than that of gaseous NOx is in question, and should be studied.

Study on the Prioritization of Improvement Plan for Road Traffic Safety Projects for Business Vehicles by the Introduction of Autonomous Vehicles (자율주행자동차 도입에 따른 사업용 차량 도로교통 안전사업 개선방안 우선순위 선정 연구)

  • Park, Sangmin;Jeong, Harim;Lee, Seungjun;Park, Sujung;Nam, Doohee;Yun, Ilsoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Recently, the automobile industry is rapidly changing due to autonomous vehicles based on advanced ICT technology. As a result, studies related to autonomous vehicles have also been actively conducted. However, most studies are focusing on the autonomous driving technology so that the prediction of changes in road traffic safety and associated legal system due to the introduction of autonomous vehicles are lacking. The purpose of this study is to suggest improvement methods and priorities of road traffic safety projects according to the introduction of autonomous vehicles. As a result of the AHP analysis using the results of the questionnaire surveyed for autonomous driving car experts, it was analyzed that revision of the traffic safety inspection law and development of education system for autonomous driving motor drivers and operators should be given top priority.

A Study of the Trend Analysis of National Automated Vehicle Research Using NTIS Data (NTIS 데이터를 이용한 국내 자율주행 연구 동향 분석에 관한 연구)

  • In-Seok Jeong;Jiwon Kang;Jongdeok Lee;Sangmin Park
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.2
    • /
    • pp.147-163
    • /
    • 2023
  • Recently, there has been an increase in the research and development of automated vehicles worldwide. Research focused on automated vehicles in Korea is steadily progressing as a national R&D project. Since automated driving technology comprises diverse technology fields, it is necessary to identify the current position of the research. In this study, we propose a methodology for analyzing research trends using the NTIS data. In addition, we review the effectiveness of the currently developed research trend methodology by deriving primary keywords and major topics using the proposed method. We expect that the methodology developed in this study can be applied to identify and analyze future automated vehicle research trends.

Study on the Development of K-City Roadmap through the Standard Analysis of the Test-Bed for Automated Vehicles in China (중국 자율주행차 테스트베드 관련 표준 분석을 통한 K-City 고도화 방안 수립에 관한 연구)

  • Lee, Sanghyun;Ko, Hangeom;Lee, Hyunewoo;Cho, Seongwoo;Yun, Ilsoo
    • Journal of Auto-vehicle Safety Association
    • /
    • v.14 no.1
    • /
    • pp.6-13
    • /
    • 2022
  • The Ministry of Land, Infrastructure and Transport (MoLIT) and the Korean Automobile Testing and Research Institute (KATRI) are supporting the development of Lv.3 automated vehicle (hereinafter, AV) technology by constructing an automated driving pilot city (as known as K-City) equipped with total 5 evaluation environments (urban, motorway, suburban, community road, and autonomous parking facility) which is a test bed exclusively for AV (2017~2018). An upgrade project is in a progress to materialize harsh environments such as bad weather (rain, fog, etc.) and reproduction of communication jamming (GPS blocking, etc.) with the purpose of supporting the development of Lv.4 connected & automated vehicle (hereinafter, CAV) technology (2019~2022). We intend to proactively establish a national level standard for CAV test-bed and test road requirements, test method, etc. for establishment of a road map for the construction of the test bed which is being promoted step by step and analyze and, when required, benchmark the case of China that has announced and is utilizing it. Through this, we plan to define standardized requirements (evaluation facility, evaluation system, etc.) on the test bed for the development of Lv.4/4+ CAV technology and utilize the same for the design and construction of a test bed, establishment of a road map for the construction of a real car-based test environment related to the support for autonomous driving service substantiation, etc. through provision of an evaluation environment utilizing K-City, and the establishment of a K-City upgrade strategies, etc.

An Impact Analysis of the Korea-Japan Undersea Tunnel Project;focus on Economic Potential Model Analysis (한일간 해저터널사업의 효과분석;성장잠재력 분석을 중심으로)

  • Park, Jin-Hee
    • Journal of Navigation and Port Research
    • /
    • v.32 no.1
    • /
    • pp.47-56
    • /
    • 2008
  • With rapid growing of the Northeastern Asia, the interest for the connection of Infrastructure that was behind of interesting until now is getting larger. In a line of same connection, UN-ESCAP are forwarding transcontinental railway project, asian highway project et al.. And this study aimed at analysis on the effect that extended to a space by Korea-Japan undersea tunnel project. In aspect of a national land balanced-development to solve various problems such as overcrowding in capital region, unbalanced state by regions, weak exchange between South and North Korea, and weakness of national land basis to prepare for unification et al., this study consulted the economic potentiality model as a analysis method to examine an effect. In this analysis, I used 24 scenarios including all cases by combination of 3 scenarios for Korea-Japan undersea tunnel, 4 scenarios for transportation modes in the section of undersea tunnel, and 2 scenarios for adjacency infrastructure. Transportation modes in the section of undersea tunnel are railway, car-train, mixing way of railway and car-train, and mixing way of road and railway. Adjacency infrastructure applied railway and road. In all scenarios, Korea showed higher growth potentiality than Japan. Also, proposal plan C route relatively showed better in national land balanced-development than other proposal plans. The growth potentiality relatively appeared higher by buildup of a connection together with non-capital regions from the construction of Korea-Japan undersea tunnel. In aspect of Northeastern Asia, it resulted in a increasing of trade and chance of network formation in the region of Asia through infrastructure connection. But, in considering passenger and various factors that extended to the economic growth, this analysis have some limitation. Therefore, I hope that deep studies will continuously perform with various factors.

High Efficient Inductive Power Supply System Implemented for On Line Electric Vehicles

  • Huh, Jin;Park, Eun-Ha;Jung, Gu-Ho;Rim, Chun-Taek
    • Proceedings of the KIPE Conference
    • /
    • 2009.11a
    • /
    • pp.105-110
    • /
    • 2009
  • The On Line Electric Vehicles(OLEV) that can pick up inductive power from underground coils on driving with high efficiency have been developed this year, and is now proposed in this paper. The IPS(Inductive Power Supply) system consists of power supply inverters, power supply rails, pick up modules, and a regulator. There are 3 generations of IPS have been developed so far, and the $4^{th}$ generation IPS is being developed. The $1^{st}$ generation has been demonstrated this Feb. 27, which is equipped with mechanically auto tracking pick-up module with 1cm air gap, and showed 80% power efficiency. The $2^{nd}$ generation IPS applied to an 120kW (average)/240kW(peak) motor powered electric bus has 17cm air gap with 72% power efficiency. For the $2^{nd}$ generation IPS, the Power supply inverter has 440V, 3phase input and 200A @ 20kHz output. The test power supply rail of 240m long is segmented by 60m each, where newly developed core structure and power cable are constructed under the road covered with asphalt of 5cm thickness. The pick-up modules which consist of core, winding wire, and rectifiers are fixed to the bottom of the bus which can carry more than 40 passengers and can pick up max. 60kW. To remove parasitic component and to transfer maximum power between them resonant circuit topology is applied to the primary and secondary sides. The EMF level is below 62.5mG at 1.75m from the center of the road to meet the regulation. Several effective ways of reducing EMF levels have been developed. In addition, effective ways to solve problems related high frequency power cables buried in ground and it's proof from soil have been studied also. This development shows that the IPS system is capable of supplying enough power to the pick-up of OLEV and can reduce battery size, weight and cost, which means the IPS with OLEV is one of the best candidate for EV.

  • PDF

A Study on the Factors Affecting the Detailed Design Price of Road Construction Project (국내 도로공사 실시설계 대가영향요인에 관한 연구)

  • Lee, Mi-Young;Seo, Jung-Hoon;Oh, Se-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.44-54
    • /
    • 2018
  • In the construction project, the design field has a crucial effect on the success or failure of the final product, and it is becoming more important as a core area of national industrial development because it creates high value added by technology. In addition, since the design work is carried out based on professional technical personnel, in order to secure the quality and competitiveness of the design, it is necessary to continuously input the excellent manpower and develop the technology, and above all, the appropriate design cost must be ensured. However, as a result of reviewing the current status of the design cost criterion in Korea, problems such as mixed cost calculation method, inaccuracy of construction cost ratio method, and inactivation of cost plus fixed fee method were analyzed. Therefore, it is difficult to calculate the fair value reflecting the characteristics of the project when calculating the construction design price. Therefore, the price criterion should be improved so that the fair value of the design can be determined according to the contents of the project, By analyzing the correlation and multiple regression analysis of the projects and price information of the completed road construction design, the factors influencing the design price and the level of influence were analyzed.