• Title/Summary/Keyword: Road project

Search Result 534, Processing Time 0.027 seconds

Application of Markov Chains and Monte Carlo Simulations for Pavement Construction Engineering

  • Nega, Ainalem;Gedafa, Daba
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1043-1050
    • /
    • 2022
  • Markov chains and Monte Carlo Simulation were applied to account for the probabilistic nature of pavement deterioration over time using data collected in the field. The primary purpose of this study was to evaluate pavement network performance of Western Australia (WA) by applying the existing pavement management tools relevant to WA road construction networks. Two approaches were used to analyze the pavement networks: evaluating current pavement performance data to assess WA State Road networks and predicting the future states using past and current pavement data. The Markov chains process and Monte Carlo Simulation methods were used to predicting future conditions. The results indicated that Markov chains and Monte Carlo Simulation prediction models perform well compared to pavement performance data from the last four decades. The results also revealed the impact of design, traffic demand, and climate and construction standards on urban pavement performance. This study recommends an appropriate and effective pavement engineering management system for proper pavement design and analysis, preliminary planning, future pavement maintenance and rehabilitation, service life, and sustainable pavement construction functionality.

  • PDF

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

THE OPPORTUNITIES AND CHALLENGES FOR CONTRACTUAL CONSIDERATION OF CONSTRUCTION-RELATED CARBON EMISSIONS FROM CIVIL INFRASTRUCTURE PROJECTS

  • Changbum Ahn;SangHyun Lee;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.653-658
    • /
    • 2011
  • Construction works of civil infrastructure projects generate a considerable amount of carbon emissions by utilizing a set of energy-intensive equipment and causing traffic congestion. However, the voluntary efforts of the contractor to mitigate these emissions are at an early stage. To address this issue, this paper explores the opportunities to take carbon emissions that would be caused from construction works into consideration in contracting methods and procedures. The opportunities for reducing carbon emissions from construction activities themselves are examined under the framework of Performance Contracting for Construction (PCfC), and carbon emissions from traffic congestion are attempted to be incorporated into the Road User Cost (RUC) calculation. This paper also identifies and discusses major challenges that must be confronted when considering the mitigation of these emissions in contracting methods and procedures.

  • PDF

Key Exchange Protocol based on Signcryption in SMART Highway (SMART Highway 환경에서의 사인크립션 기반 키 교환 프로토콜)

  • Kim, Su-Hyun;Lee, Im-Yeong
    • Journal of Korea Multimedia Society
    • /
    • v.16 no.2
    • /
    • pp.180-189
    • /
    • 2013
  • The SMART Highway project combines road construction with advanced technology and vehicle telecommunications. Its expected outcome is a world-leading intelligent road that is green, fast, and comfortable. A vehicular ad-hoc network(VANET) is the core technology of the SMART Highway, whose transport operation is based on road vehicles. The VANET is a next-generation networking technology that enables wireless communication between vehicles or between vehicles and a road side unit(RSU). In the VANET system, a vehicle accident is likely to cause a serious disaster. Therefore, some information on safety is essential to serve as the key exchange protocol for communication between vehicles. However, the key exchange scheme of the general network proposed for a fast-moving communication environment is unsuitable for vehicles. In this paper, communication between multiple vehicles more efficient and secure key exchange at the vehicle certification by signcryption is proposed.

Ecological Planning for the Preparation of an Eco-Road on the Pyungtak-Eumsung Highway (평택-음성간 고속도로의 에코로드 조성을 위한 환경생태계획)

  • 강현경;민권식;장종수;한봉호
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.32-42
    • /
    • 2004
  • This study aims at establishing an ecological planning for road construction. which is considered to be a main cause of damage to the natural environment in Korea. This study focuses on the Pyungtak-Eumsung Highway development project. It considers the ecological factors and status of the site and its surrounding area. The study site is a four-way highway with a width of 23.4m and a length of 5.7km that spans from Hyungok-ri, Anseong City, Kyeonggi Province to Jukhyun-ri, Jincheon-gun, Chungbuk Province. The objective of the plan is "the establishment of an eco-road in harmony with nature." The plan is divided into five detailed goals: 1) restoration of river morphology and ecosystem through ecological planning; 2) establishment of wet biotopes; 3) construction of ecological corridors; 4) restoration of damaged forest ecosystems; and 5) ecological restoration of the roadside slopes that are linked with the surrounding forest. A master plan has been developed based on the detailed goals. The master plan involves: 1) establishment of a natural river, wet biotopes, and ecological corridors that facilitate the movement of amphibians, wild fowls, mammalians and fish; 2) development of a planting plan for the visitor center, the tunnel entrance, and soundproof banks; and 3) the presentation of a planting model for restoring roadside slopes that are connected to the surrounding forest. The eco-road plan needs to entail ecological conservation and restoration plans. In addition, a monitoring plan for ecological corridors and habitats should be included in the comprehensive plans, along with the continuous development of environmentally friendly technologies.

Present Status and Future Vision of EIA for Railroad Construction Projects (철도건설사업 환경영향평가의 현황과 과제)

  • Lee Hyun-Woo;Lee Young-Joon;Park Young Min;Yoon Mikyung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.296-302
    • /
    • 2004
  • After the Rio declaration on environment and development in 1992, developed countries are undertaking 'environmentally sustainable transportation (EST)' projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents accumulated for last six years. The EIA for railroad construction projects .accounts for only $4.9\%$ of total project EIAs during 1998-2003. However, the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water quality, wast management, noise, etc. We also compared the characteristics of environmental impacts of railroad construction with those of vehicle road construction. The result shows that railroad construction usually requires 3${\~}$4 times longer tunnels and bridges for a given length than vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than $40\%$ of those in vehicle road construction. In order to develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly required.

  • PDF

Characteristics of Hazardous Air Pollutant Level in Road Tunnels in Seoul (서울시 터널의 유해대기오염물질 농도변화 특성 분석)

  • Park, Jin-A;Lee, Won-Young;Kim, Jin-A;Kim, Ik-Su;Kim, Hyun-Su;Jeong, Jong-Heup;Yun, Jung-Seop;Jung, Kweon;Eom, Seog-Won
    • Journal of Environmental Health Sciences
    • /
    • v.39 no.6
    • /
    • pp.541-549
    • /
    • 2013
  • Objectives: We analyzed the characteristics of hazardous air pollutants (HAPs) in road tunnels in Seoul. Methods: Particle matter ($PM_{10}$), elemental carbon (EC), organic carbon (OC), and 16 species of polycyclic aromatic hydrocarbons (PAHs) in two road tunnels (NS tunnel and HJ tunnel) were sampled and analyzed from 2007 to 2011. Results: Levels of $PM_{10}$ and carbon ingredients which were mainly emitted from diesel-fueled vehicles showed a declining tendency in both road tunnels. PAHs levels in HJ were declining slightly while PAHs levels in the NS tunnel fluctuated considerably and showed an increasing tendency. Conclusions: These results suggested that the abatement project of diesel vehicle emissions by the Seoul metropolitan government from 2007 has had an impact on the reduction of DVE into the air, though there exist many things to consider for analyses.

Development of Road Tunnel Ventilation System with Electrostatic Precipitator (도로터널용 전기집진시스템 개발)

  • Kim, Jong-Ryul;Weon, Jong-Oung
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.80-83
    • /
    • 2008
  • As SOC (Social Overhead Capital) has been expanded, the highway road construction has been accelerated and city road system has been more complicated. So, long road tunnels have been increased and traffic flow rate also has been raised. Accordingly, the exhausting gas of vehicle cars seriously deteriorates the tunnel inside air quality and driving view. In order to improve tunnel inside air quality, we may need to introduce a compulsory ventilation system as well as natural ventilation mechanism. The natural ventilation mechanism is enough for short tunnels, meanwhile longer tunnels require a specific compulsory ventilation facility. Many foreign countries already have been devoting on development of effective tunnel ventilation system and especially, some European nations and Japan have already applied their developed tunnel ventilation system for longer road tunnels. More recently, as the quality of life improved, our concerns about safety of driving and better driving environment have been increased. In order to obtain clearer and longer driving view, we are more interested in EP tunnel ventilation system in order to remove floating contaminants and automobile exhaust gas. Evan though it's been a long time since many European countries and Japan applied more economical and environment-friendly tunnel ventilation system with their self-developed Electrostatic Precipitator, we are still dependant on imported system from foreign nations. Therefore, we need to develop our unique technical know-how for optimum design tools through validity investigation and continuous possibility examination, eventually in order to localize the tunnel ventilation system technology. In this project, we will manufacture test-run products to examine the performance of system in order to develop main parts of tunnel ventilation system such as electrostatic precipitator, high voltage power generator, water treatment system, etc.

  • PDF

Eurasia Initiative and East Sea Rim Maritime Community (유라시아 이니셔티브와 환동해권 전략)

  • Kang, Tae-Ho
    • Strategy21
    • /
    • s.37
    • /
    • pp.144-176
    • /
    • 2015
  • In September 2013, President Park Geun-hye announced her controversial "Look North" policy, of which the most salient aspect is the "Eurasia Initiative". This comprises various proposals designed to overcome existing constraints by developing new markets and creating new economic partners in continental areas from which South Korea has been alienated since the end of World War II, and this dovetails nicely with China's One Belt, One Road Initiative. The concepts of the "Silk Road Rail Express (SRX)" and the "East Sea Rim Maritime Community (ESRMC)" have also been discussed. SRX is at present a purely symbolic railroad project intended to encourage individual, cultural, trade and diplomatic exchanges. ESRMC is a model for establishing an ad hoc community to promote regional economic cooperation around the East Sea. President Park's Eurasia Initiative will provide South Korean investment for the Northeast to complement Russian plans, like the "Northern Energy Road" being built by Gazprom, and Chinese plans, like the Chang-Ji-Tu Development Plan for the North Korean port of Rajin. China's trade, as well as its energy and food supplies, pass through the Strait of Malacca and the Indian Ocean, and are thus vulnerable to interdiction by India or the US. China is therefore trying to reduce its exposure geopolitical risk by establishing a network of corridors between the Belt and the Road to provide alternative paths. The "China-Pakistan Economic Corridor" and the "China-Myanmar Economic Corridor" provide such connections, and South Korea hopes that SRX and ESRMC can become part of a "China-South Korea Economic Corridor". This concept could do much to revitalize the underdeveloped northern provinces of China and Russia's Far East, not to mention North Korea. By linking up the Trans-Siberian Railway, the Trans-China Railway, the Trans-Mongolian Railway and the Trans-Korean Railway all these Asian countries will be connected to one another, and ultimately to Europe. An interim connection between China and South Korea using a rail-ferry has also been proposed.

Strategy on Production and Digitalization of Thematic Maps (공통주제도의 수치지도제작사업 추진방안에 관한 연구)

  • 김영표;조윤숙
    • Spatial Information Research
    • /
    • v.5 no.1
    • /
    • pp.43-59
    • /
    • 1997
  • There are currently more than tens of thematic maps in Korea. Among them, there are some thematic maps which are used by one organization only by which was made, and there are common thematic maps which are used by several organizations. In this study, among many kinds of common thematic maps which are currently used, the common thematic maps which will be digitized for parts of NGIS project were chosen and the priority of project was established. After selecting five maps from the common thematic maps classified as the first ranking, current land use map, parcel-address map, administrative boundary map, urban planning map and road map, the area of CheJoo Island was digitized as a pilot project. Through the pilot project of CheJoo Island, the level of application was verified, and the method was presented in order to reduce the trial and error in the process of this production after analyzing the matter from the pilot project. The direction for digitizing common thematic maps was presented based on the result of the pilot project, in addition to, the detail plan was established after deciding the number of people needed, the amount of money spent, and the period needed for making digital maps nationwide.

  • PDF